Tender Details
About Tender
🏗️ Invitation For Bids: Strengthening Of 11k V Overloaded Feeder & New Line Construction 🌿 Dakshinanchal Vidyut Vitaran Nigam Ltd., A State Government Undertaking, Is Seeking Bids For The Strengthening Of An Overloaded 11k V Feeder And The Construction Of A New Line Under The Ee Eudd I Project In Jhansi. 📅 Bid Submission Deadline: May 18, 2024, 11:00 Am Tender Fee: Inr 3000 Emd: Inr 47000 Interested Bidders Should Possess The Necessary Technical Expertise And Experience In Electrical Infrastructure Projects. Proposals Must Include Detailed Project Plans, Cost Estimates, And Timelines For Completion, In Line With The Business Plan For The Fiscal Year 2024 25. Keywords: Strengthening, 11k V Feeder, New Line Construction, Ee Eudd I Jhansi, Dakshinanchal Vidyut Vitaran Nigam Ltd, State Government Undertaking, Tender, Bid, Business Plan 2024 25Particulars | Details |
---|---|
Title |
Work Of Strengthening Of 11kv Over Loaded Feder In And Construction Of New Line Under Ee Eudd I Jhansi In Business Plan 2024 25
|
Description |
Work Of Strengthening Of 11kv Over Loaded Feder In And Construction Of New Line Under Ee Eudd I Jhansi In Business Plan 2024 25
|
Organisation | Dakshinanchal Vidyut Vitran Nigam Ltd. | State Govt. and UT |
Tender Id | 2024_DVVNL_922926_1 |
Reference Number |
49/EUDC/JHS/2023-24 |
Tender Fee | 3000 |
EMD | 65000 |
Tender Value | |
Place | EUDD I Jhansi |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1652090 |
Start Date | September 04, 2024 00:20 |
End Date |
09/09/2024 ( Expired 273 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Widening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).
Widening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).
Read moreConstruction of rrm protection wall at new tower no.: 04
Construction of rrm protection wall at new tower no.: 04 of 132 kv haflong-jiribam tl under powergrid haflong substation as per boq and instruction of engineer-in-charge
Read moreStructural rehabilitation work and improvement of reservoir, dam, outlet and basic facilities of myntdu leshka stage-i dam in west jaintia hills district of meghalaya under drip-ii (package-viii)
Structural rehabilitation work and improvement of reservoir, dam, outlet and &#x0d basic facilities of myntdu leshka stage-i dam in west jaintia hills district of &#x0d meghalaya under drip-ii (package-viii)
Read moreTerm contract for artificer work in omq, single officers accn , officer mess and servant qtr in the area of age b/r - i under ge (af) lohegaon
Term contract for artificer work in omq, single officers accn , officer mess and servant qtr in the area of age b/r - i under ge (af) lohegaon
Read moreRehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode
Rehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode
Read moreEng. pro. const. and comm. epc and performance followed by o and m of stp of 40 mld capacity based on sequential batch reactor sbr technology near chandlai lake for bambala area, sanganer sewerage work under ee phe i jda jaipur
Eng. pro. const. and comm. epc and performance followed by o and m of stp of 40 mld capacity based on sequential batch reactor sbr technology near chandlai lake for bambala area, sanganer sewerage work under ee phe i jda jaipur
Read moreNew construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
New construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
Read moreConstruction of balanced work of 2 lane h.l. rcc bridge with its approaches from ch 0.000 to 2.150 km across river sone in the state of bihar (via panduka) and jharkhand under crif scheme on epc mode.
Construction of balanced work of 2 lane h.l. rcc bridge with its approaches from ch 0.000 to 2.150 km across river sone in the state of bihar (via panduka) and jharkhand under crif scheme on epc mode.
Read moreProvn of new bore well replacement of old gi pipe line to di pipe and certain facility at itr colony balasore under ge (i) rnd
Provn of new bore well replacement of old gi pipe line to di pipe and certain facility at itr colony balasore under ge (i) rnd
Read moreConstruction work of rcc drain and culvert in rupapur colony from honda room located on prayagraj road to rajesh vermas house for strengthening the water supply system in pratapgarh district under infrastructure fund.
Construction work of rcc drain and culvert in rupapur colony from honda room located on prayagraj road to rajesh vermas house for strengthening the water supply system in pratapgarh district under infrastructure fund.
Read moreof your Industry type