Tender Details
Particulars | Details |
---|---|
Title |
A. Laying And Di Of 2 Range X 280 M Of 8 Inch Dia. Pipeline And Di Of 02 Range X 280m X Of 8 Inch Diameter Pipeline And Dismantling Of 200 M Pipe Which Got Damaged Due To Dump Of Pumps Running For Dewatering At Quarry No. 03 Along With
|
Description |
A. Laying And Di Of 2 Range X 280 M Of 8 Inch Dia. Pipeline And Di Of 02 Range X 280m X Of 8 Inch Diameter Pipeline And Dismantling Of 200 M Pipe Which Got Damaged Due To Dump Of Pumps Running For Dewatering At Quarry No. 03 Along With
|
Organisation | Central Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_CCL_316803_1 |
Reference Number |
KTC/PE (EnM)/E-Tender/24-25/141 |
Tender Fee | 0 |
EMD | 15000 |
Tender Value | |
Place | Office of the Project Officer, PE (EnM), Kathara C |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=328303 |
Start Date | September 06, 2024 15:30 |
End Date |
16/09/2024 ( Expired 217 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Laying and jointing of 8 inch dia m s pipeline for dewatering of mines during upcoming monsoon
Laying and jointing of 8 inch dia m s pipeline for dewatering of mines during upcoming monsoon
Read moreLaying and jointing of 10 inch dia m s pipeline for dewatering of mines during upcoming monsoon w.r.t. konar exp. ocp, bnk area
Laying and jointing of 10 inch dia m s pipeline for dewatering of mines during upcoming monsoon w.r.t. konar exp. ocp, bnk area
Read moreMaintenance /repairing /dismantling / laying of 6 inch, 8 inch and 10 inch dia 3 ranges pipe line installed at mine for dewatering purpose for monsoon preparation at tapin north open cast project
Maintenance/ repairing /dismantling / laying of 6 inch, 8 inch and 10 inch dia 3 ranges pipe line installed at mine for dewatering purpose for monsoon preparation at tapin north open cast project under hazaribagh area
Read moreDismantling and di cum laying of 8 inch dia m.s. pipeline of the two nos. of 2000 g.p.m. pump motor sets, in the a patch in mine, suppplying water to the water tanker point, w.r.t. karo ocp, under bnk area
Dismantling and di cum laying of 8 inch dia m.s. pipeline of the two nos. of 2000 g.p.m. pump motor sets, in the a patch in mine, suppplying water to the water tanker point, w.r.t. karo ocp, under bnk area
Read moreDismantling, repairing and laying of the 8 inch dia m.s. pipes of the delivery pipeline of the 2000 g.p.m. pump motor set, in operation at the h patch in mine, w.r.t. karo ocp, under bnk area
Dismantling, repairing and laying of the 8 inch dia m.s. pipes of the delivery pipeline of the 2000 g.p.m. pump motor set, in operation at the h patch in mine, w.r.t. karo ocp, under bnk area
Read moreM and r to optl and nptl water supply scheme replacement of damaged 600 mm dia ms raw water pipeline of optl and 700 mm dia and 200 mm dia ms raw and pure water piplines of nptl
M and r to optl and nptl water supply scheme replacement of damaged 600 mm dia ms raw water pipeline of optl and 700 mm dia and 200 mm dia ms raw and pure water piplines of nptl
Read moreMaintenance of existing 10 inch, 8 inch and 6 inch dia pipeline from coal face sump,main sump to water discharge point near pit office for dewatering purpose to meet production target in financial year 2025-26 at peocp under hazaribag area.
Maintenance of existing 10 inch, 8 inch and 6 inch dia pipeline from coal face sump,main sump to water discharge point near pit office for dewatering purpose to meet production target in financial year 2025-26 at peocp under hazaribag area.
Read moreLaying of pipeline of 6 inch diameter and 200 m of length for fire fighting at coal heap no. 06 of gidi- c colony.
Laying of pipeline of 6 inch diameter and 200 m of length for fire fighting at coal heap no. 06 of gidi- c colony.
Read moreDismantling, laying and di of 3 range x 390m of 8 and 10 inch dia. pipeline with all electrical accessories for multiple shifting of pump-motor for a period of 12 months running for dewatering at quarry no. 03 under ktc.
Dismantling, laying and di of 3 range x 390m of 8 and 10 inch dia. pipeline with all electrical accessories for multiple shifting of pump-motor for a period of 12 months running for dewatering at quarry no. 03 under ktc.
Read moreDismantling and laying of m.s. pipeline ranges of 10 inch and 8 inch diameter at ilbl ocp, lakhanpur area, mcl
Dismantling and laying of m.s. pipeline ranges of 10 inch and 8 inch diameter at ilbl ocp, lakhanpur area, mcl
Read moreof your Industry type