Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Renovation Of Electrical Installations Of Ground Floor Hpo Bldg And Compound Lights At Aurangabad Ho Ar
|
| Description |
Renovation Of Electrical Installations Of Ground Floor Hpo Bldg And Compound Lights At Aurangabad Ho Ar
|
| Organisation | Department of Posts | Central Govt. Ministry/Department |
| Tender Id | 2024_DOP_790887_1 |
|
Reference Number |
123/EEEP/MBI/2023-24 |
| Tender Fee | 0 |
| EMD | 26393 |
| Tender Value | - |
| Place | Aurangabad HO |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=831281 |
| Start Date | January 17, 2024 17:45 |
| End Date |
Expired
24/01/2024
Expired 995 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Carrying of civil and mechanical works for shifting of pv section to ground floor of hangar 1 west ancillary bldg at aiesl engg premises oap, mumbai 400029
Carrying of civil and mechanical works for shifting of pv section to ground floor of hangar 1 west ancillary bldg at aiesl engg premises oap, mumbai 400029
Read moreCivil repair work on ground floor and renovation of electrical installations, replacement of fans and led fittings and associated electrical works in post office building rohini sec. 07, new delhi look and feel
Civil repair work on ground floor and renovation of electrical installations, replacement of fans and led fittings and associated electrical works in post office building rohini sec. 07, new delhi look and feel
Read moreSpecial repair of toilets in building number sl-12, toilet near bldg no 105 b (bn mag) and toilet and urinal point near physical training ground for junior commission officers/other ranks and repair/replacement of street lights, distribution lines at
Special repair of toilets in building number sl-12, toilet near bldg no 105 b (bn mag) and toilet and urinal point near physical training ground for junior commission officers/other ranks and repair/replacement of street lights, distribution lines at
Read moreConstruction of ground floor along with electrification, water supply, sanitary arrangements, septic tank water sump, two bore wells with submersible pump sets and compound wall for government degree college at darsi in prakasam district, estimate cost: rs. 850.00 lakhs
Construction of ground floor along with electrification, water supply, sanitary arrangements, septic tank water sump, two bore wells with submersible pump sets and compound wall for government degree college at darsi in prakasam district, estimate cost: rs. 850.00 lakhs
Read moreConstruction of ground floor along with electrification, water supply, sanitary arrangements, septic tank water sump, two bore wells with submersible pump sets and compound wall for government degree college at darsi in prakasam district, estimate cost: rs. 850.00 lakhs
Construction of ground floor along with electrification, water supply, sanitary arrangements, septic tank water sump, two bore wells with submersible pump sets and compound wall for government degree college at darsi in prakasam district, estimate cost: rs. 850.00 lakhs
Read morePreparation or demolition works,inlet piping from terrace to rest room,outlet pipe from rest room to ground,removing and refixing of acp without scaffolding,other plumbing materials,plumbing labour,purchase of wc,fixing of wc,purchase of health faucet,fixing of health faucet,purchasing of wash basin,fixing of wash basin,purchasing of pipe,fixing of pipe,bison board fixing on rest room walls,floor rising of rest room,tile for floor,tiles for walls,door for rest room,false ceiling in rest room,electrical wiring for rest room,light for rest room,exhaust fan for rest room,fluted panel in the behind wall,relamination of wall panel,all ledges,tv unit storage,false ceiling,wiring for lights,track lights,electrical labour,roller blinds non-motorised,darker sun control film in glass windows,painting,wall panel behind marketing manager table,tv panel and ledges,wall panel in the behind wall,additional storages,electrical works shifting of socket pointing and concealing of cables and other related.,supply and installati
Preparation or demolition works,inlet piping from terrace to rest room,outlet pipe from rest room to ground,removing and refixing of acp without scaffolding,other plumbing materials,plumbing labour,purchase of wc,fixing of wc,purchase of health faucet,fixing of health faucet,purchasing of wash basin,fixing of wash basin,purchasing of pipe,fixing of pipe,bison board fixing on rest room walls,floor rising of rest room,tile for floor,tiles for walls,door for rest room,false ceiling in rest room,electrical wiring for rest room,light for rest room,exhaust fan for rest room,fluted panel in the behind wall,relamination of wall panel,all ledges,tv unit storage,false ceiling,wiring for lights,track lights,electrical labour,roller blinds non-motorised,darker sun control film in glass windows,painting,wall panel behind marketing manager table,tv panel and ledges,wall panel in the behind wall,additional storages,electrical works shifting of socket pointing and concealing of cables and other related.,supply and installati
Read moreSupply and plastering the damaged area of ceiling wall terrace with labour and transportation for room no 101 102 103 201 and 202,supply and painting of emulsion paint with smooth putty primer as per the approved colours for room no 101 102 103 201 202 and steps area from ground floor to second floor including pathway,electrical work, led 2 x2, 1 x 1 ft lights havells crompton creaves led fitting exhaust fan 1 nos with necessary electrical cable with labour and transportation for room no 101 102 103 201 and 202,supply and installation of mosquito net with frame with labour and transportation for room no 101 102 103 201 and 202 and pantry,supply and installation of bath fittings and all accessories parry ware at rest room with labour and transportation for room no 101 102 103 201 and 202,supply and installation of ro with electrical and plumbing lines with labour and transportation,supply and laying of vitrified tiles for wall and flooring including cpvc plumbing lines with all accessories by removing the exis
Supply and plastering the damaged area of ceiling wall terrace with labour and transportation for room no 101 102 103 201 and 202,supply and painting of emulsion paint with smooth putty primer as per the approved colours for room no 101 102 103 201 202 and steps area from ground floor to second floor including pathway,electrical work, led 2 x2, 1 x 1 ft lights havells crompton creaves led fitting exhaust fan 1 nos with necessary electrical cable with labour and transportation for room no 101 102 103 201 and 202,supply and installation of mosquito net with frame with labour and transportation for room no 101 102 103 201 and 202 and pantry,supply and installation of bath fittings and all accessories parry ware at rest room with labour and transportation for room no 101 102 103 201 and 202,supply and installation of ro with electrical and plumbing lines with labour and transportation,supply and laying of vitrified tiles for wall and flooring including cpvc plumbing lines with all accessories by removing the exis
Read moreRenovation of electrical installations of ground floor hpo bldg and compound lights at aurangabad ho ar 2nd call
Renovation of electrical installations of ground floor hpo bldg and compound lights at aurangabad ho ar 2nd call
Read moreRenovation of electrical installations of ground floor hpo bldg and compound lights at aurangabad ho ar 3 rd call
Renovation of electrical installations of ground floor hpo bldg and compound lights at aurangabad ho ar 3 rd call
Read moreRenovation of electrical installations of hpo bldg compound lights at dharashiv ho ar 2nd call
Renovation of electrical installations of hpo bldg compound lights at dharashiv ho ar 2nd call
Read moreof your Industry type