Tender Details

Particulars Details
Title
Site Package Part C Switchyard Erection Work For 400/220 K V Allahabad Substation Extension (Ss 119)
Description
Site Package Part C Switchyard Erection Work For 400/220 K V Allahabad Substation Extension (Ss 119)
Organisation Power Grid Corporation of India Limited | Central Govt. Ministry/Department
Tender Id 24389
Reference
Number
NR3/NT/W-AIS/DOM/K00/24/10362
Tender Fee 5000
EMD 3.59 Lakh
Tender Value
Place 400/220 kV Allahabad Substation
Link https://apps.powergrid.in/pgciltenders/u/view-published-tender-details.aspx?tid=ac6c4666-a708-42de-8f93-88cdb78e7d56
Start Date July 26, 2024 23:30
End Date

19/08/2024 ( Expired 265 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Maintaining the buildings, sweeping of roads and plucking of grass in switch yard area and maintaining the plants and lawns at 400 kv ss suryapet in yadadri-bhongirir district for the period from 01.06.2025 to 31.03.2026 in omc, nalgonda

Maintaining the buildings, sweeping of roads and plucking of grass in switch yard area and maintaining the plants and lawns at 400kv ss suryapet in yadadri-bhongir district for the period from 01.06.2025 to 31.03.2026 in omc, nalgonda

Read more
Desljtc of 220kv d/c u/g 1200 sq. mm xlpe cable for upcoming 220 kv tss of northern railway (at tughlakabad) from 220 kv s/s btps and setc of 02 no. 220 kv feeders for nr with associated civil work at 220 kv s/s btps new delhi on turnkey basis.

Desljtc of 220kv d/c u/g 1200 sq. mm xlpe cable for upcoming 220 kv tss of northern railway (at tughlakabad) from 220 kv s/s btps and setc of 02 no. 220 kv feeders for nr with associated civil work at 220 kv s/s btps new delhi on turnkey basis.

Read more
Construction of balance work of widening and strengthening for improvement and up-gradation of nh-709a garhmukteshwar chainage- 83.200 of nh24 to meerut (chainage 9.860 of nh235) including connector to nh-119 package xii in uttar pradesh on epc mode.

Construction of balance work of widening and strengthening for improvement and up-gradation of nh-709a garhmukteshwar chainage- 83.200 of nh24 to meerut (chainage 9.860 of nh235) including connector to nh-119 package xii in uttar pradesh on epc mode.

Read more
Construction of 220 kv s/c dechu-tinwari line with 1x220 kv bay work at dechu and tinwari alongwith stringing of 2nd circuit on existing 132 kv s/c bhadala-khetusar line on d/c towers and 1x132 kv bay at 132 kv gss khetusar on trunkey basis

Construction of 220 kv s/c dechu-tinwari line with 1x220 kv bay work at dechu and tinwari alongwith stringing of 2nd circuit on existing 132 kv s/c bhadala-khetusar line on d/c towers and 1x132 kv bay at 132 kv gss khetusar on trunkey basis

Read more
Laying of tower foundations, erection of towers, stringing and sagging of conductor for 220 kv d/c line from 400 kv s/s pgcil patiala to 220 kv s/s bhadson (to be upgraded from 66 kv s/s).

Laying of tower foundations, erection of towers, stringing and sagging of conductor for 220 kv d/c line from 400 kv s/s pgcil patiala to 220 kv s/s bhadson (to be upgraded from 66 kv s/s).

Read more
Supply and refilling work of sf6 gas cylinder at various 400/220/132 kv sub station under electricity transmission circle banda.

Supply and refilling work of sf6 gas cylinder at various 400/220/132 kv sub station under electricity transmission circle banda.

Read more
Procurement of various type of connectors, p.g. clamps and jaw for maintenance work at various 132 kv substation of electricity transmission sub division-i, mohaddipur, gorakhpur under etd-i, gorakhpur

Procurement of various type of connectors, p.g. clamps and jaw for maintenance work at various 132 kv substation of electricity transmission sub division-i, mohaddipur, gorakhpur under etd-i, gorakhpur

Read more
Work of providing, installation and testing of electric surveillance system at 220/132/33 kv substation rishikesh under 220 kv o and m division rishikesh

Work of providing, installation and testing of&amp#x0d electric surveillance system at 220/132/33 kv&amp#x0d substation rishikesh under 220 kv o and m&amp#x0d division rishikesh&amp#x0d

Read more
Empanellenment of contractors firms for the emergency work of attending breakdown due to failure of insulators snapping of conductor damage of towers in 132 kv and 220 kv transmission lines

Empanellenment of contractors firms for the emergency work of attending breakdown due to failure of insulators snapping of conductor damage of towers in 132 kv and 220 kv transmission lines

Read more
Annual maintenance work of 220 132 33 kv grid sub station giridih for the period from 16 06 2025 to 31 03 2026 for fy 2025 26

Annual maintenance work of 220 132 33 kv grid sub station giridih for the period from 16 06 2025 to 31 03 2026 for fy 2025 26

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise