Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Ce Mtpsi Se Es Mrt Ot79 25 26
|
| Description |
Mtps I Es Circle Mrt Unit Ii Boiler Area Electrically Operated Valve Actuators And Soot Blowers Carrying Out The Maintenance Works During Annual Overhaul For The Year 2025 26
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2025_EB_606718_1 |
|
Reference Number |
CE-MTPSI-SE-ES-MRT-OT79-25-26 |
| Tender Fee | 0 |
| EMD | 2400 |
| Tender Value | - |
| Place | MTPS-I/METTURDAM |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=725176 |
| Start Date | September 20, 2025 17:30 |
| End Date |
Expired
06/10/2025
Expired 377 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Ttps mech ii bm unit v inspection overhauling and commissioning of actuators of high pressure valves in boiler during overhaul for the year 2026 2027
Ttps mech ii bm unit v inspection overhauling and commissioning of actuators of high pressure valves in boiler during overhaul for the year 2026 2027
Read moreTtps es circle instn ii removing cleaning flushing, and refixing of bearing temperature heat gauges critical transmitters in boiler and turbine areas, disconnection and reconnection of power and control cables of actuators limit switches feedback
Ttps es circle instn ii removing cleaning flushing, and refixing of bearing temperature heat gauges critical transmitters in boiler and turbine areas, disconnection and reconnection of power and control cables of actuators limit switches feedback
Read moreTtps es circle instn ii unit v removing cleaning flushing and refixing of bearing temperature heat gauges critical transmitters in boiler and turbine areas disconnection and reconnection of power and control cables of actuators limit switches feedb
Ttps es circle instn ii unit v removing cleaning flushing and refixing of bearing temperature heat gauges critical transmitters in boiler and turbine areas disconnection and reconnection of power and control cables of actuators limit switches feedb
Read moreTtps es circle mrt i annual overhauling works in boiler side valves dampers, soot blowers l r blowers soot blower control panels and id fd pa fans lub oil panels in unit iii for the year 2025 26
Ttps es circle mrt i annual overhauling works in boiler side valves dampers, soot blowers l r blowers soot blower control panels and id fd pa fans lub oil panels in unit iii for the year 2025 26
Read moreTtps es circle mrt ii blowing cycle operation trouble shooting of water wall soot blowers lr soot blowers cleaning maintenance of control panels junction boxes field equipment of fsss boiler auxiliaries systems in units iv v in sub divisioniii
Ttps es circle mrt ii blowing cycle operation trouble shooting of water wall soot blowers lr soot blowers cleaning maintenance of control panels junction boxes field equipment of fsss boiler auxiliaries systems in units iv v in sub divisioniii
Read moreTtps es mrt ii blowing cycle operation trouble shooting of water wall soot blowers lr soot blowers cleaning maintenance of control panels junction boxes field equipment of fsss boiler auxiliaries systems in units iv v in sub- division iii
Ttps es mrt ii blowing cycle operation trouble shooting of water wall soot blowers lr soot blowers cleaning maintenance of control panels junction boxes field equipment of fsss boiler auxiliaries systems in units iv v
Read moreTtps es circle mrt ii blowing cycle operation trouble shooting of water wall soot blowers lr soot blowers cleaning maintenance of control panels junction boxes field equipment of fsss boiler auxiliaries systems in units iv v sub division iii
Ttps es circle mrt ii blowing cycle operation trouble shooting of water wall soot blowers lr soot blowers cleaning maintenance of control panels junction boxes field equipment of fsss boiler auxiliaries systems in units iv v sub division iii
Read moreTtps es circle mrt i annual overhauling works in boiler side valves, dampers, soot blowers l r blowers dcs panels soot blower control panels and id fd pa fans lub oil panels in unit ii for the year 2024 25
Ttps es circle mrt i annual overhauling works in boiler side valves, dampers, soot blowers l r blowers dcs panels soot blower control panels and id fd pa fans lub oil panels in unit ii for the year 2024 25
Read moreTtps es circle mrt i annual overhauling works in boiler side valves dampers soot blowers l r blowers dcs panels soot blower control panels and id fd pa fans lub oil panels in unit iii for the year 2024 25
Ttps es circle mrt i annual overhauling works in boiler side valves dampers soot blowers l r blowers dcs panels soot blower control panels and id fd pa fans lub oil panels in unit iii for the year 2024 25
Read moreSupply of aph soot blowers assemblies for stage ii boiler tanda
Supply of aph soot blowers assemblies for stage ii boiler tanda
Read moreof your Industry type