Tender Details

Particulars Details
Title
Supply Erection Fixing And Commissioning Of Different Signages At Smart City Project Sites As Per Design And Material Specified In The Tender Document Including Post Commissioning Maintenance For 2 (Two) Years
Description
Supply Erection Fixing And Commissioning Of Different Signages At Smart City Project Sites As Per Design And Material Specified In The Tender Document Including Post Commissioning Maintenance For 2 (Two) Years
Organisation Government of West Bengal
Tender Id 2023_NKGSC_556830_1
Reference
Number
01/CTO/NKGSCCL/2023-24
Tender Fee 0
EMD 1 Lakh
Tender Value 0
Place NKDA Administrative Building, 3rd floor CTO office
Link
View Original Tender Notice

https://wbtenders.gov.in

Start Date August 12, 2023 00:25
End Date
Expired 25/08/2023

Expired 1147 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Design, manufacture, supply, erection and commissioning of two lines of 6000 tpa each for banknote paper production at mysuru, karnataka, india.

Design, manufacture, supply, erection and commissioning of two lines of 6000 tpa each for banknote paper production at mysuru, karnataka, india.

Read more
Design engineering including reverse engineering manufacturing supply erection testing and commissioning for renovation modernization and uprating of two units of rabs hydel power station

Design engineering including reverse engineering manufacturing supply erection testing and commissioning for renovation modernization and uprating of two units of rabs hydel power station

Read more
Design, supply, erection, testing & commissioning of 132/55 kv traction substation, sectioning post (sps) and sub sectioning post (ssps) in 2 x25 kv traction system (scott connected transformer) in bandikui-jaipur sections of jaipur division of north western railway.

Design, supply, erection, testing & commissioning of 132/55 kv traction substation, sectioning post (sps) and sub sectioning post (ssps) in 2 x25 kv traction system (scott connected transformer) in bandikui-jaipur sections of jaipur division of north western railway.

Read more
Design, supply, erection, testing & commissioning of 132/55 kv traction substation, sectioning post (sps) and sub sectioning post (ssps) in 2x25 kv traction system (scott connected transformer) of madar(md)-bhinwaliya(bwa) section of ajmer division of north western railway

Design, supply, erection, testing & commissioning of 132/55 kv traction substation, sectioning post (sps) and sub sectioning post (ssps) in 2x25 kv traction system (scott connected transformer) of madar(md)-bhinwaliya(bwa) section of ajmer division of north western railway

Read more
Request for proposal for selection of service provider for survey, design, supply, installation, testing, commissioning, operation and maintenance of city wayfinding signage, road safety furniture, smart led information boards and visual branding sys

Request for proposal for selection of service provider for survey, design, supply, installation, testing, commissioning, operation and maintenance of city wayfinding signage, road safety furniture, smart led information boards and visual branding sys

Read more
Design, supply, erection, testing & commissioning of 220/132/55 kv traction substation, sectioning post (sps) and sub sectioning post (ssps) in 2 x25 kv traction system (scott connected transformer) in jaipur - phulera - madar sections of jaipur division of north western railway on epc mode

Design, supply, erection, testing & commissioning of 220/132/55 kv traction substation, sectioning post (sps) and sub sectioning post (ssps) in 2 x25 kv traction system (scott connected transformer) in jaipur - phulera - madar sections of jaipur division of north western railway on epc mode

Read more
Design, drawing, supply, erection, testing & commissioning of 25kv a.c. single phase overhead equipment, lt supply transformer for kalyani to ranaghat 3rd line, new switching post at chakdaha and modification in feeding post at ranaghat in connection with 3rd line work from naihati to ranaghat in sealdah division of eastern railway.

Design, drawing, supply, erection, testing & commissioning of 25kv a.c. single phase overhead equipment, lt supply transformer for kalyani to ranaghat 3rd line, new switching post at chakdaha and modification in feeding post at ranaghat in connection with 3rd line work from naihati to ranaghat in sealdah division of eastern railway.

Read more
Design, supply erection testing and commissioning of single phase, 50 hz, 25 kv ac ohe in connection with the additional work of jaunpur (jnu)-zafrabad (zbd) doubling including zafrabad yard and provision of two nos additional loop lines at mariahu yard of lucknow division of northern railway

Design, supply erection testing and commissioning of single phase, 50 hz, 25 kv ac ohe in connection with the additional work of jaunpur (jnu)-zafrabad (zbd) doubling including zafrabad yard and provision of two nos additional loop lines at mariahu yard of lucknow division of northern railway

Read more
Mobilization and demobilization of manpower tools and tackles welding machine gas cutting scaffolding materials and other necessary equipment to site,dismantling removal of existing old damaged and rusted trash rack including cutting lifting handling and disposal as directed by eic,preparation of fabrication shop drawings based on departmental design drawings supply of structural steel fabrication,underwater inspection and cleaning of intake area before erection of new trash rack including detailed site inspection prior to preparation of fabrication drawings and furnishing of photographs etc,providing and applying one coat of metal primer and two coats of anti corrosive epoxy paint on fabricated trash rack,testing inspection and commissioning of newly installed trash rack including rectification of defects if any

Mobilization and demobilization of manpower tools and tackles welding machine gas cutting scaffolding materials and other necessary equipment to site,dismantling removal of existing old damaged and rusted trash rack including cutting lifting handling and disposal as directed by eic,preparation of fabrication shop drawings based on departmental design drawings supply of structural steel fabrication,underwater inspection and cleaning of intake area before erection of new trash rack including detailed site inspection prior to preparation of fabrication drawings and furnishing of photographs etc,providing and applying one coat of metal primer and two coats of anti corrosive epoxy paint on fabricated trash rack,testing inspection and commissioning of newly installed trash rack including rectification of defects if any

Read more
Applying 2 coats of bone white approved colour cem to gopuras sikharsa over base coat after moss lichen removal using ammonia and coir brush including all material and labor,erection and removal of cip lock double scaffolding with 40mm ms tubes challis clamps bracing and safety features for gopura painting works,providing 1st class teack wood panelled door finely carved to match temple design including aldrops hinges towe bolts fixture and complete installtion charges,scaping rust with emery paper and applying two coats of synthetic enamel paint over a base coat on existing grill fencing and gates including material and labor,removal of old damaged precast roof slabs at store room disposal debris within 2km and scaffolding erection removal as directed by site in charge,providing reinforeced cement concrete slab over store room including required centering shuttering and finishing excluding reinforcement cost,supplying straighening cutting bending placing and binding mild steel medium tensile steel bars for pr

Applying 2 coats of bone white approved colour cem to gopuras sikharsa over base coat after moss lichen removal using ammonia and coir brush including all material and labor,erection and removal of cip lock double scaffolding with 40mm ms tubes challis clamps bracing and safety features for gopura painting works,providing 1st class teack wood panelled door finely carved to match temple design including aldrops hinges towe bolts fixture and complete installtion charges,scaping rust with emery paper and applying two coats of synthetic enamel paint over a base coat on existing grill fencing and gates including material and labor,removal of old damaged precast roof slabs at store room disposal debris within 2km and scaffolding erection removal as directed by site in charge,providing reinforeced cement concrete slab over store room including required centering shuttering and finishing excluding reinforcement cost,supplying straighening cutting bending placing and binding mild steel medium tensile steel bars for pr

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise