Replacement Of Damaged Cement Poles At Base Workshop With Extension Of Lt Line At Regional Store And Erection Of Lt Overhead Line At Face Pump Working Face Of Garur Shovel And Its Ob Dumping At Section Ii New Patch Of Mines Of Rajrappa Project
Description
Replacement Of Damaged Cement Poles At Base Workshop With Extension Of Lt Line At Regional Store And Erection Of Lt Overhead Line At Face Pump Working Face Of Garur Shovel And Its Ob Dumping At Section Ii New Patch Of Mines Of Rajrappa Project
Organisation Central Coalfields Limited | Public Sector Undertakings
Tender Id 2024_CCL_301129_1
Reference
Number
GM(R)/SO(EnM)/Rjp/23-24/Et/141 dt12.02.2024
Tender Fee 0
EMD 10100
Tender Value -
Place RAJRAPPA
Link
View Original Tender Notice

https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=311941

Start Date February 13, 2024 19:30
End Date
Expired 22/02/2024

Expired 966 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Erection of lt and ht metallic electrical poles with overhead lines and other required ohl structures at different locations along with dismantling of lt and ht poles, ohl and other ohl structures damaged during thundering, tree felling, heavy rains

Erection of lt and ht metallic electrical poles with overhead lines and other required ohl structures at different locations along with dismantling of lt and ht poles, ohl and other ohl structures damaged during thundering, tree felling, heavy rains

Read more
Cwe/chd-70/2026-27 special repair for conversion of lt overhead line to underground line and old vintage rcc poles to new tubular poles and connected items at hallomajra and n area under ge chandigarh

Cwe/chd-70/2026-27 special repair for conversion of lt overhead line to underground line and old vintage rcc poles to new tubular poles and connected items at hallomajra and n area under ge chandigarh

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.

Read more
Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in

Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in to oc)], yellandu area for a period of 48 months.

Read more
Day-to-day work of dismantling, erection, and maintenance of 11 kv, 3.3 kv, and lt overhead lines, including dismantling and erection of light fittings mounted on poles, structures, and high mast towers, etc., at the surface area of ananta ocp, ja.

Day-to-day work of dismantling, erection, and maintenance of 11 kv, 3.3 kv, and lt overhead lines, including dismantling and erection of light fittings mounted on poles, structures, and high mast towers, etc., at the surface area of ananta ocp, ja.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise