Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Placement Of Rate Contract For Unloading Of Coal From Bobr And N Box Coal Rakes To Th I And Ii And Wagon Tippler Respectively With Other Related Job At Chp, Phase I And Ii (2 X300 Mw And 2 X500 Mw) For Two (02) Years
|
| Description |
Placement Of Rate Contract For Unloading Of Coal From Bobr And N Box Coal Rakes To Th I And Ii And Wagon Tippler Respectively With Other Related Job At Chp, Phase I And Ii (2 X300 Mw And 2 X500 Mw) For Two (02) Years
|
| Organisation | Government of West Bengal |
| Tender Id | 2023_WBPDC_546114_1 |
|
Reference Number |
WBPDCL/SGTPP/NIT/E2342/23-24 dated 26-05-2023 |
| Tender Fee | 0 |
| EMD | 24.41 Lakh |
| Tender Value | - |
| Place | Adm. Building SgTPP PO Manigram Dist Murshidabad |
| Link |
View Original Tender Notice
https://wbtenders.gov.in |
| Start Date | July 12, 2023 16:30 |
| End Date |
Expired
24/08/2023
Expired 1149 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Reconstruction of damaged bearing pedestals of wagon tippler 1 at chp btps
Reconstruction of damaged bearing pedestals of wagon tippler - 1 at chp,ballari themal power station (btps)
Read moreProcurement of conveyor pulley lagging sheets, wagon tippler clamp pad, wagon tippler side beam wear pad, cushioning pad for side arm charger and duel lip sealing system rubber block with clamp plate for chp-i, 2x600mw, and chp-ii, 2x660mw, sstpp.
Procurement of conveyor pulley lagging sheets, wagon tippler clamp pad, wagon tippler side beam wear pad, cushioning pad for side arm charger and duel lip sealing system rubber block with clamp plate for chp-i, 2x600mw, and chp-ii, 2x660mw, sstpp.
Read moreSupply and commissioing of ups with battery for emergency light in underground conveyorsand wagon tippler complex in chp telangana
Supply and commissioing of ups with battery for emergency light in underground conveyorsand wagon tippler complex in chp telangana
Read moreKtps-vii stage-chp-mm-charges for reconditioning of wagon tippler , side arm charger and stacker cum reclaimer hydraulic cylinders.
Ktps-vii stage-chp-mm-charges for reconditioning of wagon tippler , side arm charger and stacker cum reclaimer hydraulic cylinders.
Read moreBiennial 02 years work contract for operation and maintenance along with housekeeping of coal handling plant chp i 4x210mw and wagon tippler along with alternate coal path and chp ii of 1x500 mw and manual unloading of coal from coal rake at sgtps
Biennial 02 years work contract for operation and maintenance along with housekeeping of coal handling plant chp i 4x210mw and wagon tippler along with alternate coal path and chp ii of 1x500 mw and manual unloading of coal from coal rake at sgtps
Read moreProcurement of elgi make spares for screw type air compressors of bobrn wagon unloading and dry fog dust suppression systems working in chp at stpp, jaipur, mancherial, telangana
Procurement of elgi make spares for screw type air compressors of bobrn wagon unloading and dry fog dust suppression systems working in chp at stpp, jaipur, mancherial, telangana
Read moreCollection, preparation, transportation and analysis of feeder coal, mill reject coal, bottom ash and fly ash, pc sample, coal samples from conveyor belts of chp-1 and chp-2, stockyard, collection and preparation of kecm rakes from wagon top at wts and any other special coal samples at rtps
Collection, preparation, transportation and analysis of feeder coal, mill reject coal, bottom ash and fly ash, pc sample, coal samples from conveyor belts of chp-1 and chp-2, stockyard, collection and preparation of kecm rakes from wagon top at wts and any other special coal samples at rtps
Read morePlacement of rate contract for unloading of coal from bobr and n box coal rakes to th i and ii and wagon tippler respectively with other related job at chp, phase i and ii (2x300mw and 2x500mw) for two (02) months
Placement of rate contract for unloading of coal from bobr and n box coal rakes to th i and ii and wagon tippler respectively with other related job at chp, phase i and ii (2x300mw and 2x500mw) for two (02) months
Read moreRate contract for unloading of coal from bobr and n-box coal rakes to th-i,ii and wagon tippler respectively with other related job at chp phase-i, ii , iii (2x300mw, 2x500mw and 1x660mw) for two (02) years.
Rate contract for unloading of coal from bobr&#x0d and n-box coal rakes to th-i,ii and wagon&#x0d tippler respectively with other related job at chp phase-i, ii , iii (2x300mw, 2x500mw and 1x660mw) for two (02) years.
Read moreManpower deployment for bobr rakes unloading and miscellaneous work-ntpc dadri
Manpower deployment for bobr rakes unloading and miscellaneous work-ntpc dadri
Read moreof your Industry type