Tender Details
About Tender
🏙️ Procurement Opportunity: Inverter Type Air Conditioning Systems 🌟 The Ministry Of Petroleum And Natural Gas Invites Bids For The Supply And Installation Of Energy Efficient Inverter Type Air Conditioning Systems With A Capacity Of 2 Tons And A 5 Star Rating. 🌿 📅 Bid Submission Deadline: July 15, 2024, 3:00 Pm Suppliers Must Provide Detailed Bids That Include Technical Specifications, Pricing, And Installation Services In Compliance With The Project's Energy Efficiency Standards. Keywords: Inverter Type Air Conditioning, Supply And Installation, 2 Tons, 5 Star Rating, Ministry Of Petroleum And Natural Gas, Procurement, Hvac SystemsParticulars | Details |
---|---|
Title |
Supply And Installation Of Inverter Type Air Conditioning 2 Tons Hiwall Split System Unit 5 Star Ra
|
Description |
|
Organisation | NA | Ministry of Petroleum and Natural Gas |
Tender Id | GEM/2024/B/5126730 |
Reference Number |
|
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link | https://bidplus.gem.gov.in/all-bids |
Start Date | July 04, 2024 22:14 |
End Date |
15/07/2024 ( Expired 303 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
S.No. | Seller Name | Offered Item | Participated On | MSE/MII Status | Status |
---|---|---|---|---|---|
1 | AQUATICS ENGINEERS | - | 15-07-2024 11:31:51 | MII MSE | Qualified |
2 | CHOKSHI ELECTRIC CO. | - | 13-07-2024 14:48:03 | MII MSE | Qualified |
3 | CONCORD AIRCONDITIONING SYSTEMS AND SOLUTIONS | - | 13-07-2024 18:10:41 | MII MSE | Disqualified |
4 | Coolking Servicing | - | 13-07-2024 18:09:55 | MII | Disqualified |
5 | EKDANT ENTERPRISE | - | 16-07-2024 17:41:50 | MII | Disqualified |
6 | MK ENTERPRISES | - | 15-07-2024 10:24:58 | MII MSE | Qualified |
7 | QUICK SERVICES | - | 15-07-2024 13:37:26 | MII | Qualified |
Contract Details
- Contract Status:
- Order Accepted
- Seller:
- MK ENTERPRISES
- Buyer Designation:
- Manager
- Buying Mode:
- Bid/RA
- Contract Date:
- 2024-08-26 21:02:00 +0530
- Contract Amount:
- 748300
Product | Brand | Model | Ordered Quantity | Price |
---|---|---|---|---|
Supply and Installation of Inverter Type air conditioning 2 tons Hiwall split system unit 5 Star rating | NA | BOQ Item | 7 | ₹ 465500.000 |
Supply and Installation of Inverter Type air conditioning 1 tons Hiwall split system unit 3 star rating | NA | BOQ Item | 4 | ₹ 150000.000 |
Supply, Installation and Testing of Refrigerant | NA | BOQ Item | 60 | ₹ 60000.000 |
Supply and Installation of communication and Control cabling between indoor and outdoor units. | NA | BOQ Item | 60 | ₹ 9600.000 |
Supply and Instalation of Drain pipe with 9mm Insulation size 32mm | NA | BOQ Item | 25 | ₹ 6500.000 |
Supply of R32 | NA | BOQ Item | 2 | ₹ 5000.000 |
Supply of Heavy duty ODU Stand MS | NA | BOQ Item | 11 | ₹ 13200.000 |
Supply and installation of Electrical MCB with closed Enclosure IP 65 Rating 32 AMS | NA | BOQ Item | 11 | ₹ 22000.000 |
Pressure testing of the refrigerant piping to requisite pressure levels, holding time etc as indicated in technical specification. | NA | BOQ Item | 11 | ₹ 16500.000 |
Supply, installation, testing and commissioning of solar power plant and comprehensive operations and maintenance for 5 years at central workshop sivasagar for on lstk basis
Supply, installation, testing and commissioning of solar power plant and comprehensive operations and maintenance for 5 years at central workshop sivasagar for on lstk basis
Read moreSupply, installation, testing and commissioning of air conditioning and ventilation of rup plant exhaust system at frfcf, kalpakkam
Supply, installation, testing and commissioning of air conditioning and ventilation of rup plant exhaust system at frfcf, kalpakkam
Read moreDesign manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.
Design manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.
Read moreSupply of 19730 nos of non-vrs pressure type dus suitable for dispensing ms / hsd with 2 years warranty and 8 years camc
Supply of 19730 nos of non-vrs pressure type dus suitable for dispensing ms / hsd with 2 years warranty and 8 years camc.
Read moreDnit for prov tap conn to consumers ext aug and regabilitation of water supply system installation of 05 nos nnew tube wells const of new ohsr 0 50 lg and repair of existing tube wells and pump chamber at gurdaspur distt gurdaspur under amrut 2 0
Dnit for prov tap conn to consumers ext aug and regabilitation of water supply system installation of 05 nos nnew tube wells const of new ohsr 0 50 lg and repair of existing tube wells and pump chamber at gurdaspur distt gurdaspur under amrut 2 0
Read moreSupply, installation and commissioning of a multiaxis cnc system and fibre laser wobble welding head with accessories
Supply, installation and commissioning of a multiaxis cnc system and fibre laser wobble welding head with accessories
Read moreSupply, installation, commissioning and demonstration of protein purification system
Supply, installation, commissioning and demonstration of protein purification system
Read moreProcurement of compressor assembly of air conditioning system of pc 2000-8 (k-1, k-2, k-3) of amlohri project
Procurement of compressor assembly of air conditioning system of pc 2000-8 (k-1, k-2, k-3) of amlohri project
Read moreEtender for supply, installation and commissioning of solvent recovery unit with necessary accessories
Supply, installation and commissioning of solvent recovery unit with necessary accessories
Read moreDesign, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Read moreof your Industry type