Tender Details
Particulars | Details |
---|---|
Title |
Stringing Of Two Nos Of 33 K V Overhead Transmission Line For Providing Power Supply From Bina Main Switching Station To Substation A Of Madhucon Construction At Bina Project
|
Description |
Stringing Of Two Nos. Of 33k V Overhead Transmission Line For Providing Power Supply From Bina Main Switching Substation To Substation Of M/S Madhucon Construction At Bina Project (Ncl)
|
Organisation | Northern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_NCL_334097_1 |
Reference Number |
B/EM/eTender/2025-26/01, dt.- 14.04.2025 |
Tender Fee | 0 |
EMD | 13800 |
Tender Value | |
Place | Bina Project |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=346408 |
Start Date | April 18, 2025 16:30 |
End Date |
30/04/2025 ( Expired 11 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Laying of tower foundations, erection of towers, stringing and sagging of conductor for 220 kv d/c line from 400 kv s/s pgcil patiala to 220 kv s/s bhadson (to be upgraded from 66 kv s/s).
Laying of tower foundations, erection of towers, stringing and sagging of conductor for 220 kv d/c line from 400 kv s/s pgcil patiala to 220 kv s/s bhadson (to be upgraded from 66 kv s/s).
Read moreConstruction of distribution system for 5177.98 ha. of cca including command area development (cad) of salandi left main canal from rd 59.970 km to 60.304 km through under ground pipe line irrigation system (gravity flow) of anandapur barrage project
Construction of distribution system&#x0d for 5177.98 ha. of cca including&#x0d command area development (cad)&#x0d of salandi left main canal from rd&#x0d 59.970 km to 60.304 km through&#x0d under ground pipe line irrigation&#x0d system (gravity flow) of abp
Read moreConstruction of stack yard for storing of tower materials with concrete approach pathway and open stackyard at bankura 132/33 kv sub station under bankura area office wbsetcl
Construction of stack yard for storing of tower materials with concrete approach pathway and open stackyard at bankura 132/33 kv sub station under bankura area office wbsetcl
Read moreDesign, supply, installation, testing and commissioning of 33kv/6.6kv substation and allied electrical and civil work for providing power supply to 2 no. electric mhcs of apsez in nsd for container handling
Design, supply, installation, testing and commissioning of 33kv/6.6kv substation and allied electrical and civil work for providing power supply to 2 no. electric mhcs of apsez in nsd for container handling
Read moreArchitectural finishing works including interior fitouts design and construction of external facade water supply sanitary installation, drainage for 07 elevated stations from. esic nagar to bandra of metro line 2b corridor d.n. nagar to mandale
Architectural finishing works including interior fitouts design and construction of external facade water supply sanitary installation, drainage for 07 elevated stations from. esic nagar to bandra of metro line 2b corridor d.n. nagar to mandale
Read moreSpecial repair for replacement of existing ht oh conductor to ht 11 kv ab cable alongwith connected items for improvement of electric supply distribution network at masimpur mil stn under ge silchar
Special repair for replacement of existing ht oh conductor to ht 11 kv ab cable alongwith connected items for improvement of electric supply distribution network at masimpur mil stn under ge silchar
Read moreConstruction of distribution system for 4924.04 ha. of cca including command area development (cad) of salandi left main canal from rd 49.810 km to 59.970 km through under ground pipe line irrigation system (gravity flow) of anandapur barrage project
Construction of distribution system&#x0d for 4924.04 ha. of cca including&#x0d command area development (cad)&#x0d of salandi left main canal from rd&#x0d 49.810 km to 59.970 km through&#x0d under ground pipe line irrigation&#x0d system (gravity flow) of abp
Read moreAnnual maintenance work of 220 132 33 kv grid sub station giridih for the period from 16 06 2025 to 31 03 2026 for fy 2025 26
Annual maintenance work of 220 132 33 kv grid sub station giridih for the period from 16 06 2025 to 31 03 2026 for fy 2025 26
Read moreAnnual maintenance work of 220 132 33 kv grid sub station jasidih for the period from 16 06 2025 to 31 03 2026 for fy 2025 26
Annual maintenance work of 220 132 33 kv grid sub station jasidih for the period from 16 06 2025 to 31 03 2026 for fy 2025 26
Read moreAnnual maintenance work of 132 33 kv grid sub station madhupur for the period from 16 06 2025 to 31 03 2026 for fy 2025 26
Annual maintenance work of 132 33 kv grid sub station madhupur for the period from 16 06 2025 to 31 03 2026 for fy 2025 26
Read moreof your Industry type