Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
New Construction Work Of Singhipur Culvert Road (Odr) Km. 10 To Fatehpur Nahar Puliya To Rakhiya Buzurg Road In Distt. Shahjahnapur (Fin Year 2023 24)
|
| Description |
New Construction Work Of Singhipur Culvert Road (Odr) Km. 10 To Fatehpur Nahar Puliya To Rakhiya Buzurg Road In Distt. Shahjahnapur (Fin Year 2023 24)
|
| Organisation | Cheif Engineer Bareilly Zone PWD Bareilly | State Govt. and UT |
| Tender Id | 2024_CEBLY_949682_1 |
|
Reference Number |
7554/142C(E-Tender)-3/24 Dt. 17-08-2024 |
| Tender Fee | 2725 |
| EMD | 7.53 Lakh |
| Tender Value | |
| Place | SHAHJAHANPUR |
| Link |
View Original Tender Notice
https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1647138 |
| Start Date | August 27, 2024 21:30 |
| End Date |
Expired
03/09/2024
Expired 671 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Road safety work on kanth to mahmoodpur azmabad road (odr) in distt. shahjahanpur
Road safety work on kanth to mahmoodpur azmabad road (odr) in distt. shahjahanpur
Read moreConstruction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreConsultancy work for preparation of detailed project report (dpr) including land acquisition and detailed design and drawings of all required structures coming in alignment for construction of a new four lane road from madarpur road to new riico btp
Consultancy work for preparation of detailed project report (dpr) including land acquisition and detailed design and drawings of all required structures coming in alignment for construction of a new four lane road from madarpur road to new riico btp
Read moreInvestigation survey on gis basis and construction of 300 kld and 900 kld stp with 4 kld co treatment 19 no leach pit each capacity 10 kld i and d structure and drain work in nagar panchayat amethi distt lucknow up india
Investigation survey on gis basis and construction of 300 kld and 900 kld stp with 4 kld co &#x0d treatment 19 no leach pit each capacity 10 kld i and d structure and drain work in nagar &#x0d panchayat amethi distt lucknow up india
Read moreBalance work for construction of road from l034 kundradhan to mamankot upper, package no. jk14-567, regular pmgsy (batch-i, 2017-18), stage-i, block mahore, district reasi, (length - 27.00 km)
Balance work for construction of road from l034 kundradhan to mamankot upper, package no. jk14-567, regular pmgsy (batch-i, 2017-18), stage-i, block mahore, district reasi, 
 (length - 27.00 km)
Read moreConstruction work involving the raising of the road level and the construction of drains and a cc surface in ward 83 fakhruddin ali ahmed nagar spanning the stretch from the chicken meat shop near kach bridge to the t-point/jhallu
Construction work involving the raising of the road level and the construction of drains and a cc surface in ward 83 fakhruddin ali ahmed nagar spanning the stretch from the chicken meat shop near kach bridge to the t-point/jhallu
Read moreNew construction work of singhipur culvert road (odr) km. 10 to fatehpur nahar puliya to rakhiya buzurg road in distt. shahjahnapur (fin year 2023-24)
New construction work of singhipur culvert road (odr) km. 10 to fatehpur nahar puliya to rakhiya buzurg road in distt. shahjahnapur (fin year 2023-24)
Read moreNew construction work of nh-24 village bartara to sarhi nahar puliya via bartara link road in distt. shahjahnapur (fin year 2023-24)
New construction work of nh-24 village bartara to sarhi nahar puliya via bartara link road in distt. shahjahnapur (fin year 2023-24)
Read moreNew construction work of girgicha to kudirna (nahar patri) link road in distt. shahjahnapur (fin year 2023-24)
New construction work of girgicha to kudirna (nahar patri) link road in distt. shahjahnapur (fin year 2023-24)
Read moreRenewal with general maintenance of lb road to daulatpur-singhipur-kajipur culvert via distt. pilibhit border road (odr) by hot mix plant in distt. shahjahanpur. (fin year 2023-24)
Renewal with general maintenance of lb road to daulatpur-singhipur-kajipur culvert via distt. pilibhit border road (odr) by hot mix plant in distt. shahjahanpur. (fin year 2023-24)
Read moreof your Industry type