Tender Details

Particulars Details
Title
Design, Manufacturing, Supply, Installation, Testing And Commissioning Of Automated Multi Level Mechanized Shuttle Car Parking System With 20 Percent Ev Charging Facility For 160 Cars With 5 Years Operate And Maintain At Rail Bhawan, Delhi.
Description
For Complete Deion And Other Details, Please Refer To Tender
Organisation Ministry of Railways | Central Govt. Ministry/Department
Tender Id 75957448
Reference
Number
NIT-17-24-25-WE
Tender Fee 0
EMD 20.19 Lakh
Tender Value
Place New Delhi
Link https://www.ireps.gov.in/ireps/works/pdfdocs/102024/75957448/viewNitPdf_4624004.pdf
Start Date September 27, 2024 23:46
End Date

28/10/2024 ( Expired 176 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Installation of a sensor-based inventory, space-indicating, and way-guiding system for an existing three-storey multi-level car parking facility with a capacity of 300 cars

Installation of a sensor-based inventory, space-indicating, and way-guiding system for an existing three-storey multi-level car parking facility with a capacity of 300 cars

Read more
Development of multi-level parking facility with commercial complex at thiruvottiyur municipality dispensary complex in div-11, zone -01 on design, build, finance, operate and transfer (dbfot) basis for a period of 25 years.

Development of multi-level parking facility with commercial complex at thiruvottiyur municipality dispensary complex in div-11, zone -01 on design, build, finance, operate and transfer (dbfot) basis for a period of 25 years.

Read more
Installation of a sensor-based inventory, space-indicating, and way-guiding system for an existing three-storey multi-level car parking facility with a capacity of 300 cars

Installation of a sensor-based inventory, space-indicating, and way-guiding system for an existing three-storey multi-level car parking facility with a capacity of 300 cars

Read more
Project development and management consultancy services for supply installation testing and commissioning of fully automated multi level car parking system g 3 in kishtwar

Project development and management consultancy services for supply installation testing and commissioning of fully automated multi level car parking system g 3 in kishtwar

Read more
Setting up of solar pv car parking facility with ev charging points at ongc kdm complex mehsana along with operation and maintenance for seven years.

Setting up of solar pv car parking facility with ev charging points at ongc kdm complex mehsana along with operation and maintenance for seven years.

Read more
Conceptualization design manufacturing supply installation testing and commissioning 3 years run operate maintenance of floating musical fountain interfaced with multimedia based laser video projection on water curtain at 20mld raw water reservoi

Conceptualization design manufacturing supply installation testing and commissioning 3 years run operate maintenance of floating musical fountain interfaced with multimedia based laser video projection on water curtain at 20mld raw water reservoi

Read more
Independent engineer services for year 2024to27 for operation and maintenance of multi level car parking with integrated commercial on dbom basis construction cum license to operate and maintain at chennai airport tamil nadu on blended financing mode

Independent engineer services for year 2024to27 for operation and maintenance of multi level car parking with integrated commercial on dbom basis construction cum license to operate and maintain at chennai airport tamil nadu on blended financing mode

Read more
Design, supply, installation, testing and commissioning of on-board oil/grease based wheel flange lubrication system in 44 nos. of train sets of line-06 in delhi metro rail corporation ltd. along with dlp of 2 years (inclusive of all consumables)

Design, supply, installation, testing and commissioning of on-board oil/grease based wheel flange lubrication system in 44 nos. of train sets of line-06 in delhi metro rail corporation ltd. along with dlp of 2 years (inclusive of all consumables)

Read more
Construction of fully automated car parking systembasement ground 6 floors for 134 cars multi level electro mechanical car parking with cctv surveilliance cameras,fire fighting etc. including maintenance for 3 years at shopping complex site east nada

Construction of fully automated car parking system basementground 6 floors for 134 cars multi level electro mechanical car parking with cctv surveilliance cameras,fire fighting etc. including maintenance for 3 years at shopping complex site east nada

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise