Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
AAAAAAAAAA Login to view |
Description |
Thorough Overhauling, Necessary Repairing Including Replacement Of Damaged Spares And Testing Of 7.5 Ton Capacity Overhead Crane At Ultadanga Drainage Pumping Station.
|
Organisation | KOLKATA MUNICIPAL CORPORATION | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 5600 |
Tender Value | |
Place | Ultadanga drainage pumping station |
Link |
AAAAAAAAAA Login to view |
Start Date | June 20, 2025 22:30 |
End Date |
01/07/2025 ( 8 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Repair periodical servicing incl replacement of unserviceable spares for dg sets crane street lights garden lights and certain allied works in ncat area tech area and residential area at vrde ahmednagar 06
Repair periodical servicing incl replacement of unserviceable spares for dg sets crane street lights garden lights and certain allied works in ncat area tech area and residential area at vrde ahmednagar 06
Read moreRepair/replacement to ht overhead lines, ug cables and maintenance of e/m installation at domestic and technical area at af station bhuj
Repair/replacement to ht overhead lines, ug cables and maintenance of e/m installation at domestic and technical area at af station bhuj
Read moreWork of repairing of broken main cable trench and replacement of damaged / broken trench covers at 132 kv sub-station, jaspur
Work of repairing of broken main cable trench and replacement of damaged / broken trench covers at 132 kv sub-station, jaspur
Read moreRepairing and thorough overhauling of gear box gs-14a and repairing of its base and supporting structure including changing of new sprocket of unit no. 268 belt conveyor at 00 level in hydro cyclone section of kathara washery
Repairing and thorough overhauling of gear box gs-14a and repairing of its base and supporting structure including changing of new sprocket of unit no. 268 belt conveyor at 00 level in hydro cyclone section of kathara washery
Read moreComprehensive annual maintenance contract (camc) including repairing of digitiser and replacement of load cell digital make electronic road w/b 50te capacity installed at zero point sl. no. 201804008 and check post sl. no.101141748 of gvp phase-ii o
Comprehensive annual maintenance contract (camc) including repairing of digitiser and replacement of load cell digital make electronic road w/b 50te capacity installed at zero point sl. no. 201804008 and check post sl. no.101141748 of gvp phase-ii o
Read moreAAAAAAAAAA
Login to viewProviding and installation of submersible pumping machineries at newly sunk river bed tube well no-9, 10 and replacement of damaged s/m p/m at rbtw no-02, at union para low lift under ballavpur water supply scheme.
Read moreAAAAAAAAAA
Login to viewThorough overhauling, necessary repairing including replacement of damaged spares and testing of 7.5 ton capacity overhead crane at ultadanga drainage pumping station.
Read moreAAAAAAAAAA
Login to viewThorough servicing, overhauling with replacement of&#x0d defective components of single panel h.t vcb (11kv) and 1 no dry type&#x0d transformer (630 kva) at chakgaria drainage pumping station
Read moreRepairing rectification and full overhauling with spares of 1000 gpm 100 mh model 8-8 dme, mnp make pump assembly at tapin north open cast project hazaribagh area.
Repairing rectification and full overhauling with spares of 1000 gpm, 100 mh, model 8-8 dme,mnp make pump assembly at tapin north open cast project hazaribagh area.
Read moreMtps 1 mill plant ac plant overhauling load testing and re commissioning of 3 ton capacity eot crane and load testing of electrical hoist 1 ton capacity in air washer system unit 1 to unit 4
Mtps 1 mill plant ac plant overhauling load testing and re commissioning of 3 ton capacity eot crane and load testing of electrical hoist 1 ton capacity in air washer system unit 1 to unit 4
Read moreof your Industry type