Tender Details
Particulars | Details |
---|---|
Title |
Procurement Of 415 V Panels And Distribution Boards Required For Dw System Under Em Oph Department, Stps, Wbpdcl
|
Description |
Procurement Of 415 V Panels And Distribution Boards Required For Dw System Under Em Oph Department,&Amp#X0d
Stps, Wbpdcl
|
Organisation | THE WEST BENGAL POWER DEVELOPMENT CORPORATION LTD. | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 60000 |
Tender Value | |
Place | AdBuilding,S.T.P.S,Santaldih,Purulia |
Link |
AAAAAAAAAA Login to view |
Start Date | April 25, 2025 20:30 |
End Date |
10/05/2025 ( 11 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Pkg-i - undersea power cable package (ca-01) for 220kv undersea export power cable and underground land cable under development of transmission system for offshore wind zone phase-i (500 mw vgf) off the coast of gujarat for subzone b3
Pkg-i - undersea power cable package (ca-01) for 220kv undersea export power cable and underground land cable under development of transmission system for offshore wind zone phase-i (500 mw vgf) off the coast of gujarat for subzone b3
Read moreImplementation of lt auxiliary items for smart metering works in sikkim under revamped reforms-based and results-linked, distribution sector scheme
Implementation of lt auxiliary items for smart metering works in sikkim under revamped reforms-based and results-linked, distribution sector scheme
Read more2 years operation and maintenance of computerized controlling and monitoring system for 11 nos. tubewells ,11 nos. o.h.t. and 1 no. c.w.r. in newly added area in nagar palika parishad muzaffarnagar under deposit programme distt- muzaffarnagar.
2 years operation and maintenance of computerized controlling and monitoring system for 11 nos. tubewells ,11 nos. o.h.t. and 1 no. c.w.r. in newly added area in nagar palika parishad muzaffarnagar under deposit programme distt- muzaffarnagar.
Read moreConstruction of distribution system for 12155.80 ha. of cca including command area development (cad) of salandi left main canal from rd 45.570 km to 49.810 km through under ground pipe line irrigation system (gravity flow) of anandapur barrage projec
Construction of distribution system for 12155.80 ha. of cca including command area development (cad) of salandi left main canal from rd 45.570 km to 49.810 km through under ground pipe line irrigation system (gravity flow) of anandapur barrage projec
Read moreOperation and maintenance of industrial relation management system, material tracking system and issuance of visitor photo gate pass and vehicle pass at stps for 02 years
Operation and maintenance of industrial relation management system, material tracking system and issuance of visitor photo gate pass and vehicle pass at stps for 02 years
Read moreProcurement of printing items for the year of 2025 26 under hr and a department sgtpp wbpdcl
Procurement of printing items for the year of 2025 26 under hr and a department sgtpp wbpdcl
Read moreProvn of ring main water supply distribution system to beg and centre under age e/m-1 at ge (central) khadki.
Provn of ring main water supply distribution system to beg and centre under age e/m-1 at ge (central) khadki.
Read morePermanent road restoration including bituminous and concrete road damaged due to laying of clear water rising main (d.i., k9 and distribution network (hdpe, d.i.,k7) for zone (1,2,3,4,5,6,7,8,9,10,11) within kamarhati municipal area under amrut 2.0
Permanent road restoration including bituminous and concrete road damaged due to laying of clear water rising main (d.i., k9 and distribution network (hdpe, d.i.,k7) for zone (1,2,3,4,5,6,7,8,9,10,11) within kamarhati municipal area under amrut 2.0
Read moreService contract for coal and ash sampling and assistance for other performance tests of phase i two300 mw phase ii two 500 mws phase iii one660 mw units for two years under oe dept at sgtpp wbpdcl
Service contract for coal and ash sampling and assistance for other performance tests of phase i two300 mw phase ii two 500 mws phase iii one660 mw units for two years under oe dept at sgtpp wbpdcl
Read moreAnnual maintenance of hydra pneumatic pump system for high court, tripura legislative assembly and secretariat complex under capital complex sub-division no.i during the year 2025-26.
Annual maintenance of hydra pneumatic pump system for high court, tripura legislative assembly and secretariat complex under capital complex sub-division no.i during the year 2025-26.
Read moreof your Industry type