Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🔧 Procurement Bid: Supply And Installation Of Tailness Unit Fuse Set And Lt Ab Cable 🌿🏭 Purvanchal Vidyut Vitran Nigam Limited, Varanasi, Invites Bids For The Supply And Installation Of Tailness Unit Fuse Set And Lt Ab Cable Under The Edd I Maharajganj Project. 📅 Bid Submission Deadline: April 12, 2024, 12:00 Pm Tender Fee: Inr 5900 Emd: Inr 120000 Interested Bidders Must Possess The Necessary Qualifications And Experience To Undertake This Project. Bids Should Include Detailed Technical Specifications, Pricing, And A Timeline For Installation, Adhering To The Project's Requirements And Safety Standards. Keywords: Supply And Installation, Tailness Unit Fuse Set, Lt Ab Cable, Purvanchal Vidyut Vitran Nigam Limited, Edd I Maharajganj, Government Tender, Electrical Equipment, Bid Submission| Particulars | Details |
|---|---|
| Title |
Supply And Installation Of Tailness Unit Fuse Set And Lt Ab Cable
|
| Description |
Supply And Installation Of Tailness Unit Fuse Set And Lt Ab Cable Under Edd I Maharajganj
|
| Organisation | Purvanchal Vidyut Vitran Nigam Limited Varanasi | State Govt. and UT |
| Tender Id | 2024_PVVNV_920898_1 |
|
Reference Number |
98/E.D.C.(M.)/MRJ/2023-24 |
| Tender Fee | 5900 |
| EMD | 1.2 Lakh |
| Tender Value | - |
| Place | MAHARAJGANJ |
| Link |
View Original Tender Notice
https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1590741 |
| Start Date | April 01, 2024 14:30 |
| End Date |
Expired
12/04/2024
Expired 914 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Completion of lt ab cabling in sumbal town under ut capex 2026-27
Completion of lt ab cabling in sumbal town under ut capex 2026-27
Read moreInstallation of ab cable on lt side network of main town sopore under cdf
Installation of ab cable on lt side network of main town sopore under cdf
Read moreAttending to break down calls,replacement lightening arrestor,replacement of faulty 11kv outdoor cable end termination,supplying laying acsr weasel conductor,replacement of 63a tpn switch fuse unit,replacement of 63a rewireable prcelin fuse set,replacement of 100a rewireable prcelin fuse set,replacement of pin insulators,replacement of disc insulators,dismantling the faulty transformer,refurbishment transformer 16 or 25 kva al wound,refurbishment transformer 63 kva capacity al wound,transportation charges for transformer,supplying laying of 3 into 50 sqmm ht ab cable,supplying laying of 4 into 25 sqmm lt ab cable,supplying making end termination for 4 core 25 sqmm lt ab cable
Attending to break down calls,replacement lightening arrestor,replacement of faulty 11kv outdoor cable end termination,supplying laying acsr weasel conductor,replacement of 63a tpn switch fuse unit,replacement of 63a rewireable prcelin fuse set,replacement of 100a rewireable prcelin fuse set,replacement of pin insulators,replacement of disc insulators,dismantling the faulty transformer,refurbishment transformer 16 or 25 kva al wound,refurbishment transformer 63 kva capacity al wound,transportation charges for transformer,supplying laying of 3 into 50 sqmm ht ab cable,supplying laying of 4 into 25 sqmm lt ab cable,supplying making end termination for 4 core 25 sqmm lt ab cable
Read moreAttending to break down calls,replacement lightening arrestor,replacement of faulty 11kv outdoor cable end termination,supplying laying acsr weasel conductor,replacement of 63a tpn switch fuse unit,replacement of 63a rewireable prcelin fuse set,replacement of 100a rewireable prcelin fuse set,replacement of pin insulators,replacement of disc insulators,dismantling the faulty transformer,refurbishment transformer 16 or 25 kva al wound,refurbishment transformer 63 kva capacity al wound,transportation charges for transformer,supplying laying of 3 into 50 sqmm ht ab cable,supplying laying of 4 into 25 sqmm lt ab cable,supplying making end termination for 4 core 25 sqmm lt ab cable
Attending to break down calls,replacement lightening arrestor,replacement of faulty 11kv outdoor cable end termination,supplying laying acsr weasel conductor,replacement of 63a tpn switch fuse unit,replacement of 63a rewireable prcelin fuse set,replacement of 100a rewireable prcelin fuse set,replacement of pin insulators,replacement of disc insulators,dismantling the faulty transformer,refurbishment transformer 16 or 25 kva al wound,refurbishment transformer 63 kva capacity al wound,transportation charges for transformer,supplying laying of 3 into 50 sqmm ht ab cable,supplying laying of 4 into 25 sqmm lt ab cable,supplying making end termination for 4 core 25 sqmm lt ab cable
Read moreRepair / maint of lt feeder pillar boxes, lt ug cables and connected works of lt distribution system including attending fuse off call at ins dega under age e/m no-ii of ge (u-i) visakhapatnam
Repair / maint of lt feeder pillar boxes, lt ug cables and connected works of lt distribution system including attending fuse off call at ins dega under age e/m no-ii of ge (u-i) visakhapatnam
Read moreImprovement/ maint of ext elect supply incl lt poles/ ab cables/ terminal boxes/ bus bars and allied services under ge clement town
Improvement/ maint of ext elect supply incl lt poles/ ab cables/ terminal boxes/ bus bars and allied services under ge clement town
Read moreFuse 20a,ceramic type hrc fuse,relay coil,oil tight limit switch
Fuse 20a,ceramic type hrc fuse,relay coil,oil tight limit switch
Read moreConstruction of 11 kv distribution network with 250kva distribution sub-station, lt ab cable and allied electrical and civil works for brutang irrigation project.
Construction of 11 kv distribution network with 250kva distribution sub-station, lt ab cable and allied electrical and civil works for brutang irrigation project.
Read moreof your Industry type