Tender Details
Particulars | Details |
---|---|
Title |
Cm Of Split Ac Units 1,Cm Of Split Ac Units 2,Cm Of Split Ac Units 3,Cm Of Split Ac Units 4,Cm Of S
|
Description |
|
Organisation | Department of Telecommunications (DOT) | Ministry of Communications |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link |
AAAAAAAAAA Login to view |
Start Date | April 17, 2025 23:21 |
End Date |
28/04/2025 ( 7 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Read moreVac, tvs along with electrical and scada works for 16 ug stations in corridor-3 of phase-2 cmrl project including tunnel and ramp sections between the stations
Vac, tvs along with electrical and scada works for 16 ug stations in corridor-3 including tunnel and ramp sections between the stations
Read moreProcurement of additional civil works for g plus 2 seoc building and g plus 3 asdma building in guwahati assam including 3 years of o and m period under airbmp
Procurement of additional civil works for g plus 2 seoc building and g plus 3 asdma building in guwahati assam including 3 years of o and m period under airbmp
Read moreHiring of model- 25/latest model of 1 no. omni bus/traveler (t-2), 25-1 seating capacity or equivalent sel vehicle for utilization period of bus up to 03 years or 2,50,000 kms for ae(tlm) sub dn., mpptcl, satna
Hiring of model- 25/latest model of 1 no. omni bus/traveler (t-2), 25-1 seating capacity or equivalent sel vehicle for utilization period of bus up to 03 years or 2,50,000 kms for ae(tlm) sub dn., mpptcl, satna
Read moreOutsourcing maintennace at ph-1 to ph-4 of mukerian hydel project pspcl talwara punjab
Outsourcing the work of routine, prive maintenance, breakdown maintenance and annual overhauling of generating units, switchyards and other allied equipment through contractor at ph 1 to 4 of mukerian hydel project pspcl talwara pb
Read moreUpgradation strengthening of 2-4 lane carriageway to 4-lane divided carriageway from ch.132.320 in dhamasiya village in naswade taluka to ch.161.000 in jitnagar village in nandod taluka (l 28.680 km) section of nh-56 in gujarat on ham (pkg-iv(a)
Upgradation strengthening of 2-4 lane carriageway to 4-lane divided carriageway from ch.132.320 in dhamasiya village in naswade taluka to ch.161.000 in jitnagar village in nandod taluka (l 28.680 km) section of nh-56 in gujarat on ham (pkg-iv(a)
Read moreUpgradation strengthening of 2-4 lane carriageway to 4-lane divided carriageway from ch.161.000 in jitnagar village in nandod taluka to ch.179.780 in bitada-movi village in netrang taluka (l 18.780 km) section of nh-56 in gujarat on ham (pkg-iv)(b)
Upgradation strengthening of 2-4 lane carriageway to 4-lane divided carriageway from ch.161.000 in jitnagar village in nandod taluka to ch.179.780 in bitada-movi village in netrang taluka (l 18.780 km) section of nh-56 in gujarat on ham (pkg-iv)(b)
Read moreKgs-2: supply of reactor coolant channel shielding plug assembly as per npcil ts,raps-4: supply of
Read more
Internal improvement works of (package-21) for water supply scheme 1. pucca chisti 2. churiwala chisti 3. khan wala , block fazilka, distt. fazilka (under nabard xxvii/jjm)
Internal improvement works of (package-21) for water supply scheme 1. pucca chisti 2. churiwala chisti 3. khan wala , block fazilka, distt. fazilka (under nabard xxvii/jjm)
Read moreBiennial maintenance of ash slurry line extension at different dp and dp changeover (both phase #1 and phase # 2) inside ash pond of sgtpp
Biennial maintenance of ash slurry line extension at different dp and dp changeover (both phase #1 and phase #2) inside ash pond of sgtpp.
Read moreof your Industry type