Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Erection Of 10 5 M Span Foot Bridge On Khatav Left Canal Khatav Right Canal And Man Canal And Man Extation Canal Tal Khatav Dist Satara Under Tarali Irrigation Project
|
Description |
Construction Of Erection Of 10 5 M Span Foot Bridge On Khatav Left Canal Khatav Right Canal And Man Canal And Man Extation Canal Tal Khatav Dist Satara Under Tarali Irrigation Project
|
Organisation | Government of Maharashtra |
Tender Id | 2024_CWRDP_981828_1 |
Reference Number |
E Tender No. 07, For 2023-24 |
Tender Fee | 2360 |
EMD | 63000 |
Tender Value | |
Place | Ex Engr Kanher Canal Division No.2, Karawadi |
Link | https://mahatenders.gov.in |
Start Date | January 11, 2024 15:30 |
End Date |
25/01/2024 ( Expired 476 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Design, engineering, supply, construction, erection, testing and commissioning of 234 mw(ac) grid tied floating solar pv (fspv) plant on dvc maithon dam reservoir in the state of jharkhand including 10 years comprehensive o and m service
Design, engineering, supply, construction, erection, testing and commissioning of 234 mw(ac) grid tied floating solar pv (fspv) plant on dvc maithon dam reservoir in the state of jharkhand including 10 years comprehensive o and m service
Read moreEpc contractor for design, engineering, procurement, supply, construction, commissioning on turnkey basis and comprehensive operation and maintenance for 10 (5 plus 5) years of 50 mw grid-connected solar photovoltaic power plants at ttps, lalpania
Epc contractor for design, engineering, procurement, supply, construction, commissioning on turnkey basis and comprehensive operation and maintenance for 10 (5 plus 5) years of 50 mw grid-connected solar photovoltaic power plants at ttps, lalpania
Read moreConstruction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Read moreConstruction of distribution system for 5177.98 ha. of cca including command area development (cad) of salandi left main canal from rd 59.970 km to 60.304 km through under ground pipe line irrigation system (gravity flow) of anandapur barrage project
Construction of distribution system&#x0d for 5177.98 ha. of cca including&#x0d command area development (cad)&#x0d of salandi left main canal from rd&#x0d 59.970 km to 60.304 km through&#x0d under ground pipe line irrigation&#x0d system (gravity flow) of abp
Read moreCanal water based water supply project for construction of 2.0 mld water treatment plant (wtp) and other related works including 5 years operation and maintenance (part-2) at nathana, district bathinda, punjab under amrut 2.0 scheme
Canal water based water supply project for construction of 2.0 mld water treatment plant (wtp) and other related works including 5 years operation and maintenance (part-2) at nathana, district bathinda, punjab under amrut 2.0 scheme
Read moreConstruction of hl bridge 5 span 10.00 each (eff.) over sukhna choe including its approaches and di road near police station baltana, zirakpur distt. sas nagar
Construction of hl bridge 5 span 10.00 each (eff.) over sukhna choe including its approaches and di road near police station baltana, zirakpur distt. sas nagar
Read moreBalance work on risk and cost of the contractor under construction of major high-level bridge across panvel-mahad-panjim road nh-66 (old-17) at km 91.400 god river, km 94.400 kal river and km 161.400 choradi river on nh-66 in raigad district in the s
Balance work on risk and cost of the contractor under construction of major high-level bridge across panvel-mahad-panjim road nh-66 (old-17) at km 91.400 god river, km 94.400 kal river and km 161.400 choradi river on nh-66 in raigad district in the s
Read moreBalance work on risk and cost of the contractor under construction of major high-level bridge across panvel-mahad-panjim road nh-66 (old-17) at km 91.400 god river, km 94.400 kal river and km 161.400 choradi river on nh-66 in raigad district in the s
Balance work on risk and cost of the contractor under construction of major high-level bridge across panvel-mahad-panjim road nh-66 (old-17) at km 91.400 god river, km 94.400 kal river and km 161.400 choradi river on nh-66 in raigad district in the s
Read moreConstruction of nbcc ph ii residential housing complex 3 towers of g plus 10 floors, lig and ews g plus 11 floors on epc basis with land measuring 10651.15 sqm 2.632 acres at bahadurpur, patna bihar on design, epc basis including o and m of 5 years
Construction of nbcc ph ii residential housing complex 3 towers of g plus 10 floors, lig and ews g plus 11 floors on epc basis with land measuring 10651.15 sqm 2.632 acres at bahadurpur, patna bihar on design, epc basis including o and m of 5 years
Read moreConstruction of 5 nos. 200 mm x165mm x 300.00 m deep hydt well and providing 5 nos. 5 hp electric motor with submersible cable rope hdpe pipe and bore well chamber in wtp campus of keredari-peto rpwss under d.w. and s. division hazaribagh
Construction of 5 nos. 200 mm x165mm x 300.00 m deep hydt well and providing 5 nos. 5 hp electric motor with submersible cable rope hdpe pipe and bore well chamber in wtp campus of keredari-peto rpwss under d.w. and s. division hazaribagh
Read moreof your Industry type