Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Departmental Estimate For Dismantling, Shifting And Installation Of 01 Nos 1000 Gpm Pump And 02 Nos 2000 Gpm Pump Set For 03 Months With Base Frame, Suction Pipeline, Delivery Pipeline, Valves Etc. At Shifted Location For Pump Shifting In The Mines A
|
| Description |
Departmental Estimate For Dismantling, Shifting And Installation Of 01 Nos 1000 Gpm Pump And 02 Nos 2000 Gpm Pump Set For 03 Months With Base Frame, Suction Pipeline, Delivery Pipeline, Valves Etc. At Shifted Location For Pump Shifting In The Mines
|
| Organisation | Coal India Limited (CIL) |
| Tender Id | 2023_CCL_289270_1 |
|
Reference Number |
PO/PEOCP/EnM/Tender/23-24/ 15 |
| Tender Fee | - |
| EMD | 2500 |
| Tender Value | - |
| Place | PEOCP |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in |
| Start Date | September 21, 2023 20:30 |
| End Date |
Expired
03/10/2023
Expired 1062 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Operation and maintenance of jack well cum pump house 4 numbers of pumps and motors ms raising main pipeline air valves, delivery chambers and 110kv substation of first lift on left side of singataluru lift irrigation scheme in singataluru village, mundaragi taluk, gadag dist for the year 2026-27 and 2027-28
Operation and maintenance of jack well cum pump house 4 numbers of pumps and motors ms raising main pipeline air valves, delivery chambers and 110kv substation of first lift on left side of singataluru lift irrigation scheme in singataluru village, mundaragi taluk, gadag dist for the year 2026-27 and 2027-28
Read moreDismantling, shifting and installation of 02 nos. 1000 gpm pump and 02 nos. 2000 gpm pump for 06(six) months with base frame, suction pipeline, delivery pipeline, valves etc. at shifted location for pump shifting in the mines as per requirement.
Dismantling, shifting and installation of 02 nos. 1000 gpm pump and 02 nos. 2000 gpm pump for 06(six) months with base frame, suction pipeline, delivery pipeline, valves etc. at shifted location for pump shifting in the mines as per requirement
Read moreDismantling, shifting and installation of 01 nos. 1000 gpm pump and 02 nos. 2000 gpm pump for 03 months with base frame, suction pipeline, delivery pipeline, valves etc. at shifted location for pump shifting in the mines as per requirement of peo
Dismantling, shifting and installation of 01 nos. 1000 gpm pump and 02 nos. 2000 gpm pump for 03 months with base frame, suction pipeline, delivery pipeline, valves etc. at shifted location for pump shifting in the mines as per requirement of peo
Read moreShifting of 02 nos. diesel engine 1000 gpm pump in mine sump with dismantling of pipeline of 6 inch dia ( 500 mtr. each approx.) and replacement of old suction pipe of both pump under amrapali ocp, a-c area
Shifting of 02 nos. diesel engine 1000 gpm pump in mine sump with dismantling of pipeline of inchdia ( 500 mtr. each approx.) and replacement of old suction pipe of both pump under amrapali ocp, a-c area
Read moreDismantling, shifting and installation of 500 gpm pump along with pipeline work for matching installed at 3 no. old makoli sump under tarmi ocp
Dismantling, shifting and installation of 500 gpm pump along with pipeline work for matching installed at 3 no. old makoli sump under tarmi ocp
Read moreDismantling lowering shifting/installation (1) 4000 gpm pump set angarpathra hospital side (2) 4000 gpm pump lakarka siding delivery(3) 800 gpm pump angarpathra hospital side west sump akwmc ocp under katras area.

 dismantling lowering shifting/installation (1) 4000 gpm pump set angarpathra hospital side (2) 4000 gpm pump lakarka siding delivery(3) 800 gpm pump angarpathra hospital side west sump akwmc ocp under katras area.
Read moreShifting of 02 nos pump (4000 gpm and 2000 gpm) at jocp coal face abocp mine of block-ii area
Shifting of 02 nos pump (4000 gpm and 2000 gpm) at jocp coal face abocp mine of block-ii area
Read moreShifting of 02 nos pump (4000 gpm and 2000 gpm) at jocp coal face abocp mine of block-ii area
Shifting of 02 nos pump (4000 gpm and 2000 gpm) at jocp coal face abocp mine of block-ii area
Read moreDismantling of manual transporting joining of section extension of 4000 gpm pump 10 pipes 02 nos./3000 gpm west sump pump 08 pipes east sump 02 nos./800 gpm pump 06 pipes 02 nos. west sump at akwmc ocp
Dismantling 
 of 
 manual 
 transporting 
 joining of section 
 extension of 4000 
 gpm pump 10 pipes 
 02 nos./3000 gpm 
 west sump pump 
 08 
 pipes east 
 sump 02 nos./800 
 gpm pump 06 pipes 
 02 nos. west sump 
 at akwmc ocp
Read moreLaying and dismantling of pipeline installation dismantling and shifting of pump motor of amlai ocm sohagpur area secl
Laying and dismantling of pipeline installation dismantling and shifting of pump motor of amlai ocm sohagpur area secl
Read moreof your Industry type