Tender Details

Particulars Details
Title
Departmental Estimate For Dismantling, Shifting And Installation Of 01 Nos 1000 Gpm Pump And 02 Nos 2000 Gpm Pump Set For 03 Months With Base Frame, Suction Pipeline, Delivery Pipeline, Valves Etc. At Shifted Location For Pump Shifting In The Mines A
Description
Departmental Estimate For Dismantling, Shifting And Installation Of 01 Nos 1000 Gpm Pump And 02 Nos 2000 Gpm Pump Set For 03 Months With Base Frame, Suction Pipeline, Delivery Pipeline, Valves Etc. At Shifted Location For Pump Shifting In The Mines
Organisation Coal India Limited (CIL)
Tender Id 2023_CCL_289270_1
Reference
Number
PO/PEOCP/EnM/Tender/23-24/ 15
Tender Fee
EMD 2500
Tender Value
Place PEOCP
Link
View Original Tender Notice

https://coalindiatenders.nic.in

Start Date September 21, 2023 20:30
End Date
Expired 03/10/2023

Expired 976 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Dismantling, shifting and installation of 01 nos. 1000 gpm pump and 02 nos. 2000 gpm pump for 03 months with base frame, suction pipeline, delivery pipeline, valves etc. at shifted location for pump shifting in the mines as per requirement of peo

Dismantling, shifting and installation of 01 nos. 1000 gpm pump and 02 nos. 2000 gpm pump for 03 months with base frame, suction pipeline, delivery pipeline, valves etc. at shifted location for pump shifting in the mines as per requirement of peo

Read more
Dismantling, shifting and installation of 02 nos. 1000 gpm pump and 02 nos. 2000 gpm pump for 06(six) months with base frame, suction pipeline, delivery pipeline, valves etc. at shifted location for pump shifting in the mines as per requirement.

Dismantling, shifting and installation of 02 nos. 1000 gpm pump and 02 nos. 2000 gpm pump for 06(six) months with base frame, suction pipeline, delivery pipeline, valves etc. at shifted location for pump shifting in the mines as per requirement

Read more
Shifting/ installation of 01 no. 2000 gpm pump and 02 nos. 1000 gpm pump 02 times each at bottom quarry sump in respect of sdocm, dhori area

Shifting/ installation of 01 no. 2000 gpm pump and 02 nos. 1000 gpm pump 02 times each at bottom quarry sump in respect of sdocm, dhori area

Read more
Making and fabrication of 03 nos of base plate of 01 for 1000 gpm pump installed at mines and another 02 no of 500 gpm pump installed at kns of topa project under kuju area

Making and fabrication of 03 nos of base plate of 01 for 1000 gpm pump installed at mines and another 02 no of 500 gpm pump installed at kns of topa project under kuju area

Read more
(a) lifting /shifting of (a) 01 no. 3000 gpm pump-motor set (b) 01 no. 2000 gpm pump-motor set (c) 02 no. 4000 gpm pump-motor set (b) lifting/shifting of 01 no. 2000 gpm pump -motor setat 09 no. siding of amal.nt-st-jg colliery under lodna

(a) lifting /shifting of (a) 01 no. 3000 gpm pump-motor set (b) 01 no. 2000 gpm pump-motor set (c) 02 no. 4000 gpm pump-motor set (b) lifting/shifting of 01 no. 2000 gpm pump -motor setat 09 no. siding of amal.nt-st-jg colliery under lodna

Read more
Lowering, lifting and installation of 03 nos, pump i.e. 01 no. 1000 gpm and 02 nos. 2000 gpm pump with alignment of pipe 150mm and 200mm dia. ms/gi pipeline at karma ocp under kuju area.

Lowering, lifting and installation of 03 nos, pump i.e. 01 no. 1000 gpm and 02 nos. 2000 gpm pump with alignment of pipe 150mm and 200mm dia. ms/gi pipeline at karma ocp under kuju area.

Read more
Lowering, lifting and installation of 03 nos, pump i.e. 01 no. 1000 gpm and 02 nos. 2000 gpm pump with alignment of pipe 150mm and 200mm dia. ms/gi pipeline at karma ocp under kuju area.

Lowering, lifting and installation of 03 nos, pump i.e. 01 no. 1000 gpm and 02 nos. 2000 gpm pump with alignment of pipe 150mm and 200mm dia. ms/gi pipeline at karma ocp under kuju area.

Read more
Repairing/fabrication of 02 nos. of base frame of 2000 gpm pump-motor (asp 250g) at s. b. project.

Repairing/fabrication of 02 nos. of base frame of 2000 gpm pump-motor (asp 250g) at s. b. project.

Read more
Fabrication of base plate/frame, suction bends and delivery bends for operation of 2000 gpm and 1000 gpm and ht motor under dakra project, nk area

Fabrication of base plate/frame, suction bends and delivery bends for operation of 2000 gpm and 1000 gpm and ht motor under dakra project, nk area

Read more
Repairing of the four nos. of base plates of the four nos. of 2000 gpm and 1000 gpm pump motor sets, and repair of the 8 inch dia suction pipeline of the two nos. of 2000 gpm pumps, installed in mine, w.r.t. karo ocp, under bnk area

Repairing of the four nos. of base plates of the four nos. of 2000 gpm and 1000 gpm pump motor sets, and repair of the 8 inch dia suction pipeline of the two nos. of 2000 gpm pumps, installed in mine, w.r.t. karo ocp, under bnk area

Read more
Click Here to Download Dockets
of your Industry type