Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Dismantling, Shifting And Installation Of 02 Nos. 1000 Gpm Pump And 02 Nos. 2000 Gpm Pump For 06(six) Months With Base Frame, Suction Pipeline, Delivery Pipeline, Valves Etc. At Shifted Location For Pump Shifting In The Mines As Per Requirement.
|
| Description |
Dismantling, Shifting And Installation Of 02 Nos. 1000 Gpm Pump And 02 Nos. 2000 Gpm Pump For 06(six) Months With Base Frame, Suction Pipeline, Delivery Pipeline, Valves Etc. At Shifted Location For Pump Shifting In The Mines As Per Requirement
|
| Organisation | Central Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2024_CCL_318402_1 |
|
Reference Number |
PO/PEOCP/EnM/Tender/24-25/ 18 |
| Tender Fee | 0 |
| EMD | 8600 |
| Tender Value | |
| Place | PEOCP |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=330035 |
| Start Date | September 30, 2024 20:30 |
| End Date |
Expired
09/10/2024
Expired 604 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Dismantling, shifting and installation of 01 nos. 1000 gpm pump and 02 nos. 2000 gpm pump for 03 months with base frame, suction pipeline, delivery pipeline, valves etc. at shifted location for pump shifting in the mines as per requirement of peo
Dismantling, shifting and installation of 01 nos. 1000 gpm pump and 02 nos. 2000 gpm pump for 03 months with base frame, suction pipeline, delivery pipeline, valves etc. at shifted location for pump shifting in the mines as per requirement of peo
Read moreDepartmental estimate for dismantling, shifting and installation of 01 nos 1000 gpm pump and 02 nos 2000 gpm pump set for 03 months with base frame, suction pipeline, delivery pipeline, valves etc. at shifted location for pump shifting in the mines a
Departmental estimate for dismantling, shifting and installation of 01 nos 1000 gpm pump and 02 nos 2000 gpm pump set for 03 months with base frame, suction pipeline, delivery pipeline, valves etc. at shifted location for pump shifting in the mines
Read moreShifting/ installation of 01 no. 2000 gpm pump and 02 nos. 1000 gpm pump 02 times each at bottom quarry sump in respect of sdocm, dhori area
Shifting/ installation of 01 no. 2000 gpm pump and 02 nos. 1000 gpm pump 02 times each at bottom quarry sump in respect of sdocm, dhori area
Read moreFabrication of base plate/frame, suction bends and delivery bends for operation of 2000 gpm and 1000 gpm and ht motor under dakra project, nk area
Fabrication of base plate/frame, suction bends and delivery bends for operation of 2000 gpm and 1000 gpm and ht motor under dakra project, nk area
Read moreRepairing/fabrication of 02 nos. of base frame of 2000 gpm pump-motor (asp 250g) at s. b. project.
Repairing/fabrication of 02 nos. of base frame of 2000 gpm pump-motor (asp 250g) at s. b. project.
Read moreRepairing of the four nos. of base plates of the four nos. of 2000 gpm and 1000 gpm pump motor sets, and repair of the 8 inch dia suction pipeline of the two nos. of 2000 gpm pumps, installed in mine, w.r.t. karo ocp, under bnk area
Repairing of the four nos. of base plates of the four nos. of 2000 gpm and 1000 gpm pump motor sets, and repair of the 8 inch dia suction pipeline of the two nos. of 2000 gpm pumps, installed in mine, w.r.t. karo ocp, under bnk area
Read moreShifting of 02 nos. diesel engine 1000 gpm pump in mine sump with dismantling of pipeline of 6 inch dia ( 500 mtr. each approx.) and replacement of old suction pipe of both pump under amrapali ocp, a-c area
Shifting of 02 nos. diesel engine 1000 gpm pump in mine sump with dismantling of pipeline of inchdia ( 500 mtr. each approx.) and replacement of old suction pipe of both pump under amrapali ocp, a-c area
Read moreLowering, lifting and installation of 03 nos, pump i.e. 01 no. 1000 gpm and 02 nos. 2000 gpm pump with alignment of pipe 150mm and 200mm dia. ms/gi pipeline at karma ocp under kuju area.
Lowering, lifting and installation of 03 nos, pump i.e. 01 no. 1000 gpm and 02 nos. 2000 gpm pump with alignment of pipe 150mm and 200mm dia. ms/gi pipeline at karma ocp under kuju area.
Read moreLowering, lifting and installation of 03 nos, pump i.e. 01 no. 1000 gpm and 02 nos. 2000 gpm pump with alignment of pipe 150mm and 200mm dia. ms/gi pipeline at karma ocp under kuju area.
Lowering, lifting and installation of 03 nos, pump i.e. 01 no. 1000 gpm and 02 nos. 2000 gpm pump with alignment of pipe 150mm and 200mm dia. ms/gi pipeline at karma ocp under kuju area.
Read moreFabrication, painting three nos. base frame and installation of 1000 gpm motor- pump on the fabricated base frame for coming monsoon 2024 at tapin north open cast under hazaribagh area
Fabrication, painting three nos. base frame and installation of 1000 gpm motor- pump on the fabricated base frame for coming monsoon 2024 at tapin north open cast under hazaribagh area
Read moreof your Industry type