Tender Details
Particulars | Details |
---|---|
Title |
Dismantling, Shifting And Installation Of 02 Nos. 1000 Gpm Pump And 02 Nos. 2000 Gpm Pump For 06(six) Months With Base Frame, Suction Pipeline, Delivery Pipeline, Valves Etc. At Shifted Location For Pump Shifting In The Mines As Per Requirement.
|
Description |
Dismantling, Shifting And Installation Of 02 Nos. 1000 Gpm Pump And 02 Nos. 2000 Gpm Pump For 06(six) Months With Base Frame, Suction Pipeline, Delivery Pipeline, Valves Etc. At Shifted Location For Pump Shifting In The Mines As Per Requirement
|
Organisation | Central Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_CCL_318402_1 |
Reference Number |
PO/PEOCP/EnM/Tender/24-25/ 18 |
Tender Fee | 0 |
EMD | 8600 |
Tender Value | |
Place | PEOCP |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=330035 |
Start Date | September 30, 2024 20:30 |
End Date |
09/10/2024 ( Expired 194 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Dismantling and relocation of two nos. of pipeline ranges from section 22 affected area for safety compliance/ dismantling, laying commissioning, interlinking of pipelines, installation of water tanker filling point, fabrication of base plate/ frame
Dismantling and relocation of two nos. of pipeline ranges from section 22 affected area for safety compliance/ dismantling, laying commissioning, interlinking of pipelines, installation of water tanker filling point, fabrication of base plate/ frame
Read moreShifting and lowering of 3000/2000 /1000 gpm pump including all electricals for dewatering during upcoming monsoon
Shifting and lowering of 3000/2000 /1000 gpm pump including all electricals for dewatering during upcoming monsoon
Read moreAnnual contract for dismantling, shifting and re-commissioning etc and day to day running maintenance of 3 nos 500gpm pump-motor at phase ii colony and 4 nos 500 gpm pump-motor at kmp colony at akk ocp bnk area for a period of one years.
Annual contract for dismantling, shifting and re-commissioning etc and day to day running maintenance of 3 nos 500gpm pump-motor at phase ii colony and 4 nos 500 gpm pump-motor at kmp colony at akk ocp bnk area for a period of one years.
Read moreShifting, installation, and commissioning of pump as well as laying, fitting and dismantling of different size pipeline with extension and shortening of delivery pipe as per requirement and other pumping relatedwork at hingula ocp.
Shifting, installation, and commissioning of pump as well as laying, fitting and dismantling of different size pipeline with extension and shortening of delivery pipe as per requirement and other pumping relatedwork at hingula ocp.
Read moreShifting of 02 nos. diesel engine 1000 gpm pump in mine sump with dismantling of pipeline of 6 inch dia ( 500 mtr. each approx.) and replacement of old suction pipe of both pump under amrapali ocp, a-c area
Shifting of 02 nos. diesel engine 1000 gpm pump in mine sump with dismantling of pipeline of inchdia ( 500 mtr. each approx.) and replacement of old suction pipe of both pump under amrapali ocp, a-c area
Read moreComprehensive job of dismantling of 250 mm girder, cutting, welding, painting, fabrication of pump platform, delivery bend and suction bend for 02 nos. 2000 gpm pump at kdh ocp under nk area
Comprehensive job of dismantling of 250 mm girder, cutting, welding, painting, fabrication of pump platform, delivery bend and suction bend for 02 nos. 2000 gpm pump at kdh ocp under nk area
Read moreRepairing fabrication n painting of 02 nos. old pontoon to install 1000 gpm pump- motor for quick dewatering and smooth activities of pump for coming monsoon 2025 at tapin north open cast project.
Repairing fabrication n painting of 02 nos. old pontoon to install 1000 gpm pump- motor for quick dewatering and smooth activities of pump for coming monsoon 2025 at tapin north open cast project.
Read moreDismantling, laying and di of 3 range x 390m of 8 and 10 inch dia. pipeline with all electrical accessories for multiple shifting of pump-motor for a period of 12 months running for dewatering at quarry no. 03 under ktc.
Dismantling, laying and di of 3 range x 390m of 8 and 10 inch dia. pipeline with all electrical accessories for multiple shifting of pump-motor for a period of 12 months running for dewatering at quarry no. 03 under ktc.
Read moreLowering and di of 3 no. pipeline of 10 inch and 8 inch pipe of 2 nos. 4000 gpm and 1 no. 2000 gpm pump-motor for water supply for domestic use at modibhitta bagdigi basti bararee 1 no. colony of amal.joyrampur colliery under lodna area
Lowering and di of 3 no. pipeline of 10 inch and 8 inch pipe of 2 nos. 4000 gpm and 1 no. 2000 gpm pump-motor for water supply for domestic use at modibhitta bagdigi basti bararee 1 no. colony of amal.joyrampur colliery under lodna area
Read moreDi including extension and shifting 03 nos.4000gpm and 2000gpm 2 nos.and 1000 gpm 01 no. pump motor 4000gpm pump 8 times and 2000 gpm pump 4 times and 1000 gpm pump 2 times with delivery range and placing all pump at new place due to d
Di including extension and shifting 03 nos.4000gpm and 2000gpm 2 nos.and 1000 gpm 01 no. pump motor 4000gpm pump 8 times and 2000 gpm pump 4 times and 1000 gpm pump 2 times with delivery range and placing all pump at new place due to d
Read moreof your Industry type