| Particulars | Details |
|---|---|
| Title |
Dismantling, Shifting And Installation Of 02 Nos. 1000 Gpm Pump And 02 Nos. 2000 Gpm Pump For 06(six) Months With Base Frame, Suction Pipeline, Delivery Pipeline, Valves Etc. At Shifted Location For Pump Shifting In The Mines As Per Requirement.
|
| Description |
Dismantling, Shifting And Installation Of 02 Nos. 1000 Gpm Pump And 02 Nos. 2000 Gpm Pump For 06(six) Months With Base Frame, Suction Pipeline, Delivery Pipeline, Valves Etc. At Shifted Location For Pump Shifting In The Mines As Per Requirement
|
| Organisation | Central Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2024_CCL_318402_1 |
|
Reference Number |
PO/PEOCP/EnM/Tender/24-25/ 18 |
| Tender Fee | 0 |
| EMD | 8600 |
| Tender Value | - |
| Place | PEOCP |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=330035 |
| Start Date | September 30, 2024 20:30 |
| End Date |
Expired
09/10/2024
Expired 690 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Operation and maintenance of jack well cum pump house 4 numbers of pumps and motors ms raising main pipeline air valves, delivery chambers and 110kv substation of first lift on left side of singataluru lift irrigation scheme in singataluru village, mundaragi taluk, gadag dist for the year 2026-27 and 2027-28
Operation and maintenance of jack well cum pump house 4 numbers of pumps and motors ms raising main pipeline air valves, delivery chambers and 110kv substation of first lift on left side of singataluru lift irrigation scheme in singataluru village, mundaragi taluk, gadag dist for the year 2026-27 and 2027-28
Read moreDismantling, shifting and installation of 01 nos. 1000 gpm pump and 02 nos. 2000 gpm pump for 03 months with base frame, suction pipeline, delivery pipeline, valves etc. at shifted location for pump shifting in the mines as per requirement of peo
Dismantling, shifting and installation of 01 nos. 1000 gpm pump and 02 nos. 2000 gpm pump for 03 months with base frame, suction pipeline, delivery pipeline, valves etc. at shifted location for pump shifting in the mines as per requirement of peo
Read moreDepartmental estimate for dismantling, shifting and installation of 01 nos 1000 gpm pump and 02 nos 2000 gpm pump set for 03 months with base frame, suction pipeline, delivery pipeline, valves etc. at shifted location for pump shifting in the mines a
Departmental estimate for dismantling, shifting and installation of 01 nos 1000 gpm pump and 02 nos 2000 gpm pump set for 03 months with base frame, suction pipeline, delivery pipeline, valves etc. at shifted location for pump shifting in the mines
Read moreShifting of 02 nos pump (4000 gpm and 2000 gpm) at jocp coal face abocp mine of block-ii area
Shifting of 02 nos pump (4000 gpm and 2000 gpm) at jocp coal face abocp mine of block-ii area
Read moreShifting of 02 nos pump (4000 gpm and 2000 gpm) at jocp coal face abocp mine of block-ii area
Shifting of 02 nos pump (4000 gpm and 2000 gpm) at jocp coal face abocp mine of block-ii area
Read moreShifting/ installation of 01 no. 2000 gpm pump and 02 nos. 1000 gpm pump 02 times each at bottom quarry sump in respect of sdocm, dhori area
Shifting/ installation of 01 no. 2000 gpm pump and 02 nos. 1000 gpm pump 02 times each at bottom quarry sump in respect of sdocm, dhori area
Read moreDismantling of manual transporting joining of section extension of 4000 gpm pump 10 pipes 02 nos./3000 gpm west sump pump 08 pipes east sump 02 nos./800 gpm pump 06 pipes 02 nos. west sump at akwmc ocp
Dismantling 
 of 
 manual 
 transporting 
 joining of section 
 extension of 4000 
 gpm pump 10 pipes 
 02 nos./3000 gpm 
 west sump pump 
 08 
 pipes east 
 sump 02 nos./800 
 gpm pump 06 pipes 
 02 nos. west sump 
 at akwmc ocp
Read moreShifting of 2000 gpm and 4000 gpm 02 nos pump along with delivery for 1t east coalface mine water dewatering under abocp mine of block-ii area
Shifting of 2000 gpm and 4000 gpm 02 nos pump along with delivery for 1t east coalface mine water dewatering under abocp mine of block-ii area
Read moreShifting of pump sets, shifting of pumps 02 nos, changing of damaged pipeline and changing of haulage rope at porascole east colliery
Shifting of pump sets, shifting of pumps 02 nos, changing of damaged pipeline and changing of haulage rope at porascole east colliery
Read more(a) lifting /shifting of (a) 01 no. 3000 gpm pump-motor set (b) 01 no. 2000 gpm pump-motor set (c) 02 no. 4000 gpm pump-motor set (b) lifting/shifting of 01 no. 2000 gpm pump -motor setat 09 no. siding of amal.nt-st-jg colliery under lodna
(a) lifting /shifting of (a) 01 no. 3000 gpm pump-motor set (b) 01 no. 2000 gpm pump-motor set (c) 02 no. 4000 gpm pump-motor set (b) lifting/shifting of 01 no. 2000 gpm pump -motor setat 09 no. siding of amal.nt-st-jg colliery under lodna
Read moreof your Industry type