Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Boundary Wall, Track Work, Retaining Wall, Pqc Road, Bridge Work, Earthwork And Allied Works In Connection With The Development Of Multi Model Cargo Terminal At Chharodi (Gujarat).
|
| Description |
Construction Of Boundary Wall, Track Work, Retaining Wall, Pqc Road, Bridge Work, Earthwork And Allied Works In Connection With The Development Of Multi Model Cargo Terminal At Chharodi (Gujarat).
|
| Organisation | Container Corporation of India Limited | Central Govt. Ministry/Department |
| Tender Id | 2025_CONCR_786529_1 |
|
Reference Number |
CON/Area2/ENG/Chharodi/E-84115 |
| Tender Fee | 0 |
| EMD | 17.5 Lakh |
| Tender Value | - |
| Place | Area II |
| Link |
View Original Tender Notice
https://eprocure.gov.in/epublish/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1090856 |
| Start Date | January 25, 2025 00:25 |
| End Date |
Expired
17/02/2025
Expired 607 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Development and management of gati shakti multi-modal cargo terminal under schedule-2 of gct policy near malout railway station - partially on railway land
Development and management of gati shakti multi-modal cargo terminal under schedule-2 of gct policy near malout railway station - partially on railway land
Read moreConstruction of rail under rail, earthwork, minor bridges, retaining wall, side drains, fencing and road work in connection with additional hotgi bye pass line phase-2 (0 to 3.5 km) in solapur division of central railway
Construction of rail under rail, earthwork, minor bridges, retaining wall, side drains, fencing and road work in connection with additional hotgi bye pass line phase-2 (0 to 3.5 km) in solapur division of central railway
Read moreEngineering procurement and construction (epc) of construction of new bg line work including earthwork, blanketing, minor bridges, major bridges, lhs/rubs, robs, track works, platform work, station building, fobs, other buildings, and associated miscellaneous works for 25t indian railway standard loading from ch. 1.350 km (excluding jhajha) to 22.000 km (including batia station) (total- 20.650 route km, 27.888 track km) in connection with the jhajha batia new line project
Engineering procurement and construction (epc) of construction of new bg line work including earthwork, blanketing, minor bridges, major bridges, lhs/rubs, robs, track works, platform work, station building, fobs, other buildings, and associated miscellaneous works for 25t indian railway standard loading from ch. 1.350 km (excluding jhajha) to 22.000 km (including batia station) (total- 20.650 route km, 27.888 track km) in connection with the jhajha batia new line project
Read moreConstruction of 4th bg line from itarsi (km 745.130) to bina (km 982.130) including earthwork, tunnels, bridges, road over bridge (rob), road under bridge (rub), station buildings, track works, electrification, signaling & telecommunication works, and allied miscellaneous works in connection with itarsi - bina 4th line project under west central railway in the state of madhya pradesh.
Construction of 4th bg line from itarsi (km 745.130) to bina (km 982.130) including earthwork, tunnels, bridges, road over bridge (rob), road under bridge (rub), station buildings, track works, electrification, signaling & telecommunication works, and allied miscellaneous works in connection with itarsi - bina 4th line project under west central railway in the state of madhya pradesh.
Read moreConstruction of platforms, earthwork/ blanketing in formation/cutting, retaining wall & drain, rub, fob, minor bridge (br.no.466/2, 467/1, 467/2, 467/3, 467/4, 467/4, 468/1, 468/2, 469/1), station building(g+1) and station building compound wall, water tank, toilet, rub pump house, road, etc. work and dismantling and track works for nimbhora yard remodelling, including ballast supply in connection with bsl-knw 3rd and 4th line (131km) project of central railway. (two packet system).
Construction of platforms, earthwork/ blanketing in formation/cutting, retaining wall & drain, rub, fob, minor bridge (br.no.466/2, 467/1, 467/2, 467/3, 467/4, 467/4, 468/1, 468/2, 469/1), station building(g+1) and station building compound wall, water tank, toilet, rub pump house, road, etc. work and dismantling and track works for nimbhora yard remodelling, including ballast supply in connection with bsl-knw 3rd and 4th line (131km) project of central railway. (two packet system).
Read moreConstruction of new bg double line from balodabazar (km 110.500) to parmalkasa (km 280.840) and y-connectivities from lakholi station and marauda y cabin including earthwork, bridges, rail over rail (ror) bridge , road over bridge (rob), road under bridge (rub), station buildings, track works, electrification, signaling &telecommunication works, and allied miscellaneous works in connection with kharsia- naya raipur-parmalkasa 5th & 6th line project under south east central railway in t
Construction of new bg double line from balodabazar (km 110.500) to parmalkasa (km 280.840) and y-connectivities from lakholi station and marauda y cabin including earthwork, bridges, rail over rail (ror) bridge , road over bridge (rob), road under bridge (rub), station buildings, track works, electrification, signaling &telecommunication works, and allied miscellaneous works in connection with kharsia- naya raipur-parmalkasa 5th & 6th line project under south east central railway in t
Read moreEngineering procurement and construction (epc) of construction of viaducts, ror/rfo, major bridges, minor bridges, animal underpass, rub/lhs, tunnel/cut-cover, earthwork, blanketing, trolley refuge, turfing, buildings, retaining wall, toe wall etc. and other associated worksfor construction of new double line track for dfcc loading from ch.158.00 to ch.184 in koderma detour section in sonnagar-andal 3rd and 4th line project on epc mode in dhanbad division of east central railway.
Engineering procurement and construction (epc) of construction of viaducts, ror/rfo, major bridges, minor bridges, animal underpass, rub/lhs, tunnel/cut-cover, earthwork, blanketing, trolley refuge, turfing, buildings, retaining wall, toe wall etc. and other associated worksfor construction of new double line track for dfcc loading from ch.158.00 to ch.184 in koderma detour section in sonnagar-andal 3rd and 4th line project on epc mode in dhanbad division of east central railway.
Read moreConstruction of boundary wall, track work, retaining wall, pqc road, cc pavement, bridge work, earthwork and allied works in c/w development of multi model cargo terminal at chharodi (gujarat)
Construction of boundary wall, track work, retaining wall, pqc road, cc pavement, bridge work, earthwork and allied works in c/w development of multi model cargo terminal at chharodi (gujarat)
Read moreDevelopment of multi model cargo terminal,work included construction of warehouse, track work, building work, cc pavement, boundary wall etc.at manawala, amritsar (punjab)
Development of multi model cargo terminal,work included construction of warehouse, track work, building work, cc pavement, boundary wall etc.at manawala, amritsar (punjab)
Read moreManaging the points at rail track, removal and placement of rakes, shunting operations and manning the level crossings at gati shakti rail multi modal cargo terminal dahej
Managing the points at rail track, removal and placement of rakes, shunting operations and manning the level crossings at gati shakti rail multi modal cargo terminal
 dahej
Read moreof your Industry type