Tender Details

About Tender

🏗️ Procurement Opportunity: Gear Box Overhaul For Rajrappa Washery Project 🏗️ Central Coalfields Limited, A Public Sector Undertaking, Is Seeking Bids From Experienced Vendors For The Dismantling, Overhauling, And Re Installation Of Gear Boxes For Crushers, Apron Feeders, And Belt Conveyers Within The Raw Coal Section Of The Rajrappa Washery Project. 📅 Bid Submission Deadline: April 25, 2024, 6:55 Pm Tender Fee: Inr 0 Emd: Inr 13500 Interested Bidders Must Demonstrate Their Capability To Perform The Overhauling Of Heavy Machinery And Adhere To Stringent Safety And Quality Standards. Detailed Proposals, Including Technical Specifications, Pricing, And Project Timelines, Are Required. Keywords: Gear Box Overhaul, Rajrappa Washery Project, Central Coalfields Limited, Heavy Machinery Maintenance, Public Sector Undertaking, Tender, Bid Submission
Particulars Details
Title
Dismantling, Overhauling And Re Installation Of Gear Box Of Crushers, Apron Feeders, Belt Conveyers Under Raw Coal Section Of Rajrappa Washery Project
Description
Dismantling, Overhauling And Re Installation Of Gear Box Of Crushers, Apron Feeders, Belt Conveyers Under Raw Coal Section Of Rajrappa Washery Project
Organisation Central Coalfields Limited | Public Sector Undertakings
Tender Id 2024_CCL_306556_1
Reference
Number
SO(W)/Rjp/24-25/Et/6dt 13.04.2024
Tender Fee 0
EMD 13500
Tender Value -
Place rajrappa washery
Link
View Original Tender Notice

https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=317668

Start Date April 15, 2024 23:30
End Date
Expired 25/04/2024

Expired 903 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Supply of belt for 36 in gravimetric raw coal feeders of units 1 and 2/stg-i/btps

Supply of belt for 36 in gravimetric raw coal feeders of units 1 and 2/stg-i/btps

Read more
Hammer cross pein 220 grams 250 grams with handle,chuck drill 12 mm capacity with key,drills guage straight shank letter sizes a to z with guage,drills guage straight shank wire size 1 to 60 with guage,drill gauge 1 point 5 to 12 point 5 mm in steps of 0 point 5 mm,pipe mild steel ms 150nb sch 40 erw is 1239,pipe galvenized iron gi 25mm sch 40 erw,gear spur old damaged to fit 50 mm shaft dia,carrier for mounting components such as pb and relay boxes,tools bits hss 10 mm square,square engineers 6 inch 15 cm blade,rule steel 15 cm graduated both english and metric units,punch dot slot dia 10 100 mm,card file,guage belt tensioner gauge,fuel injection pump dismantling tool kit universal vice,arbor press hand operated 2 ton capacity,spindle key for opening cylinder valve,hammer sledge double faced 4 kg,multi angle magnetic clamp set metal base 18 x10 x 10 cm,welding helmet auto darkening type,table for arc welding all metal with positioner 122 cm x 92 cm x 60 cm,swagging and flooring tool kit 45 degree tubing 1 by

Hammer cross pein 220 grams 250 grams with handle,chuck drill 12 mm capacity with key,drills guage straight shank letter sizes a to z with guage,drills guage straight shank wire size 1 to 60 with guage,drill gauge 1 point 5 to 12 point 5 mm in steps of 0 point 5 mm,pipe mild steel ms 150nb sch 40 erw is 1239,pipe galvenized iron gi 25mm sch 40 erw,gear spur old damaged to fit 50 mm shaft dia,carrier for mounting components such as pb and relay boxes,tools bits hss 10 mm square,square engineers 6 inch 15 cm blade,rule steel 15 cm graduated both english and metric units,punch dot slot dia 10 100 mm,card file,guage belt tensioner gauge,fuel injection pump dismantling tool kit universal vice,arbor press hand operated 2 ton capacity,spindle key for opening cylinder valve,hammer sledge double faced 4 kg,multi angle magnetic clamp set metal base 18 x10 x 10 cm,welding helmet auto darkening type,table for arc welding all metal with positioner 122 cm x 92 cm x 60 cm,swagging and flooring tool kit 45 degree tubing 1 by

Read more
Dismantling fabrication erection n alignment of belt structure of 1204 n 1304 belt and trolley under loading section of rajrappa washery project.

Dismantling fabrication erection n alignment of belt structure of 1204 n 1304 belt and trolley under loading section of rajrappa washery project.

Read more
Repairing n reshelling of non- driving drum of 1400mm defferent belt conveyor under raw coal section of rajrappa washery project.

Repairing n reshelling of non- driving drum of 1400mm defferent belt conveyor under raw coal section of rajrappa washery project.

Read more
Dismantling, repairing, fabrication, erection and alignment of reject belt conveyor hopper, liner platform of ps 5 at rajrappa washery project

Dismantling, repairing, fabrication, erection and alignment of reject belt conveyor hopper, liner platform of ps 5 at rajrappa washery project.

Read more
Repairing of sizing screens and replacement of 1400mm p/n, n/n belt under raw coal section of rajrappa washery project

Repairing of&#x0d sizing screens and replacement of 1400mm p/n, n/n belt under raw coal section of rajrappa washery project.

Read more
Replacement of apron pan, chain link, roller, track roller and repairing of roll cylinder of secondary cusher under raw coal section of rajrappa washery project

Replacement of apron pan, chain link, roller, track roller and repairing of roll cylinder of secondary cusher under raw coal section of rajrappa washery project

Read more
Dismantling, fabrication, erection and alignment of deck plates belt structures, repairing of roller frames related to belt conveyors under loading section of rajrappa washery project.

Dismantling, fabrication, erection and alignment of deck plates belt structures, repairing of roller frames related to belt conveyors under loading section of rajrappa washery project.

Read more
Repairing / reconditioning of the motor controlling pannel of apron feeder,primary crusher and belt conveyor b side and repairing all the locks of mcc panels door installed at raw coal of rajrappa washery project.

Repairing / reconditioning of the motor controlling panel of apron feeder,primary crusher and belt conveyor b side and repairing all the locks of mcc panels door installed at raw coal of rajrappa washery project.

Read more
Replacement of crusher segments and erection fabrication and alignment of belt conveyors structures and strengthening under raw coal section of rajrappa washery project

Replacement of crusher segments and erection fabrication and alignment of belt conveyors structures and strengthening under raw coal section of rajrappa washery project

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise