Tender Details
Particulars | Details |
---|---|
Title |
Onsite Repairing And Overhauling Of 01 No. 1000 Gpm Pump, 150 Meter Head, 5 Chr, Make Mn P And Alignment Of Pump With The Three Phase Induction Motor In Mine W.R.T. Karo Ocp, Bn K Area
|
Description |
Onsite Repairing And Overhauling Of 01 No. 1000 Gpm Pump, 150 Meter Head, 5 Chr, Make Mn P And Alignment Of Pump With The Three Phase Induction Motor In Mine W.R.T. Karo Ocp, Bn K Area
|
Organisation | Central Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_CCL_311395_1 |
Reference Number |
P.E. (EnM)/ Karo OCP/ e-tender/ 2024-25/ 13 |
Tender Fee | 0 |
EMD | 2700 |
Tender Value | |
Place | Karo OCP |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=322701 |
Start Date | June 28, 2024 16:30 |
End Date |
05/07/2024 ( Expired 291 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Repairing of 01 nos. 2000gpm, 150 mtr. head, 2chr pump, make flowmore, repairing of 01 no. 1000gpm, 150mtr. head, 3 stage pump, make mnp of rajrappa project
Repairing of 01 nos. 2000gpm, 150 mtr. head, 2chr pump, make flowmore, repairing of 01 no. 1000gpm, 150mtr. head, 3 stage pump, make mnp of rajrappa project
Read more(a). repairing of 2000gpm, 150 mtrs. head, make-flowmore model horizontal, sl.no- 17042951 installed at gvp phase-ii ocp (b). repairing of rkb 250, 200 mtrs. head 2000 gpm, sl.no.-12972150004 make-kirlosker pump of gvp phase-ii ocp, (c). repairing wo
(a). repairing of 2000gpm, 150 mtrs. head, make-flowmore model horizontal, sl.no- 17042951 installed at gvp phase-ii ocp (b). repairing of rkb 250, 200 mtrs. head 2000 gpm, sl.no.-12972150004 make-kirlosker pump of gvp phase-ii ocp, (c). repairing wo
Read moreRepairing of one no. of 540 cum/hr, 150 mtr. head, model fm 590 bd, make flowmore pump, sl. no. 17042951-20-06 of kdh ocp, nk area
Repairing of one no. of 540 cum/hr, 150 mtr. head, model fm 590 bd, make flowmore pump, sl. no. 17042951-20-06 of kdh ocp, nk area
Read moreRepairing /reconditioning /overhauling of 1000 gpm , 8 stage 280 mtr head, rkb pump make kirloskar under urimari ocp
Repairing/reconditioning/overhauling of 1000 gpm ,8 stage 280 mtr head, rkb pump make kirloskar of potanga quarry
 under urimari ocp.
Read moreAnnual contract for dismantling, shifting and re-commissioning etc and day to day running maintenance of 3 nos 500gpm pump-motor at phase ii colony and 4 nos 500 gpm pump-motor at kmp colony at akk ocp bnk area for a period of one years.
Annual contract for dismantling, shifting and re-commissioning etc and day to day running maintenance of 3 nos 500gpm pump-motor at phase ii colony and 4 nos 500 gpm pump-motor at kmp colony at akk ocp bnk area for a period of one years.
Read moreRepairing of 01 nos 500gpm, 100m head, dsm 125/40 kbl make, and 01 no 500gpm, 5chr, 125/100 type, 150m, mnp make pump for water tanker filling point or mines dewatering purpose at topa project under kuju area.
Repairing of 01 nos 500gpm, 100m head, dsm 125/40 kbl make, and 01 no 500gpm, 5chr, 125/100 type, 150m, mnp make pump for water tanker filling point or mines dewatering purpose at topa project under kuju area.
Read moreMaking of portable sheds, with internal electric wiring for the three nos. of 2000 g.p.m. pump motor sets, installed in mine, w.r.t. karo ocp, bnk area
Making of portable sheds, with internal electric wiring for the three nos. of 2000 g.p.m. pump motor sets, installed in mine, w.r.t. karo ocp, bnk area
Read moreRepairing/rewinding of 700kw/6.6kv, 1492 rpm, 3 phase squirrel cage ht induction motor, sl. no. 3f660696/5 and 3f660696/1 make - marathon electric motor of integrated l-b-l ocp, lakhanpur area, mcl.
Repairing/rewinding of 700kw/6.6kv, 1492 rpm, 3 phase squirrel cage ht induction motor, sl. no. 3f660696/5 and 3f660696/1 make - marathon electric motor of integrated l-b-l ocp, lakhanpur area, mcl.
Read moreMaintenance repairing and complete overhauling 02 nos 1000gpm pump having specification 1000gpm ,150mtr head multistage kirloskar make rkb 150/34 model and 1000gpm , 100 mtr. head split casing m and p make dst 150/200 model at peocp hzb. area.
Maintenance repairing and complete overhauling 02 nos 1000gpm pump having specification 1000gpm ,150mtr head multistage kirloskar make rkb 150/34 model and 1000gpm , 100 mtr. head split casing m and p make dst 150/200 model at peocp hzb. area.
Read moreRepairing, maintenance and complete overhauling with spares of one no 2000 gpm 150 mtr head 2 stage flowmore make centrifugal pump sl no-17042951 at peocp,hazaribagh area.
Repairing, maintenance and complete overhauling with spares of one no 2000 gpm 150 mtr head 2 stage flowmore make centrifugal pump sl no-17042951 at peocp,hazaribagh area.
Read moreof your Industry type