Tender Details

Particulars Details
Title
Onsite Repairing And Overhauling Of 01 No. 1000 Gpm Pump, 150 Meter Head, 5 Chr, Make Mn P And Alignment Of Pump With The Three Phase Induction Motor In Mine W.R.T. Karo Ocp, Bn K Area
Description
Onsite Repairing And Overhauling Of 01 No. 1000 Gpm Pump, 150 Meter Head, 5 Chr, Make Mn P And Alignment Of Pump With The Three Phase Induction Motor In Mine W.R.T. Karo Ocp, Bn K Area
Organisation Central Coalfields Limited | Public Sector Undertakings
Tender Id 2024_CCL_311395_1
Reference
Number
P.E. (EnM)/ Karo OCP/ e-tender/ 2024-25/ 13
Tender Fee 0
EMD 2700
Tender Value
Place Karo OCP
Link https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=322701
Start Date June 28, 2024 16:30
End Date

05/07/2024 ( Expired 338 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Repairing of 2000 gpm pump make flow more sl. no. missing, local sl. no. dbb/pump/2, 150 mtr head running under dakra project, nk area

Repairing of 2000 gpm pump make flow more sl. no. missing, local sl. no. dbb/pump/2, 150 mtr head running under dakra project, nk area

Read more
Repairing and replacement of 01 no. pump, make- grw, head 150 mtr. sl. no. hs-2546, head- 150 meter running at tetariakhar ocp under rajhara area.

Repairing and replacement of 01 no. pump, make- grw, head 150 mtr. sl. no. - hs-2546, head- 150 meter running at tetariakhar ocp under rajhara area.

Read more
Dismantling, extension cum laying of the 8 inch dia m.s. pipes of the 2000 g.p.m. pump motor set, supplying water to the village pond in mine, w.r.t. karo ocp, under bnk area

Dismantling, extension cum laying of the 8 inch dia m.s. pipes of the 2000 g.p.m. pump motor set, supplying water to the village pond in mine, w.r.t. karo ocp, under bnk area

Read more
Onsite overhauling and repairing of the transformer 3.3 kv by 440 v, 100 kva, name plate missing transformer installed at the substation under karo ocp, bnk area.

Onsite overhauling and repairing of the transformer 3.3 kv by 440 v, 100 kva, name plate missing transformer installed at the substation under karo ocp, bnk area.&#x0d

Read more
Complete overhauling and repairing of 01 no. 2000 gpm pump, name plate missing, 3chr, make mnp and onsite commissioning of the pump on the base plate and alignment with the three phase induction motor in mine w.r.t. karo ocp, bnk area

Complete overhauling and repairing of 01 no. 2000 gpm pump, name plate missing, 3chr, make mnp and onsite commissioning of the pump on the base plate and alignment with the three phase induction motor in mine w.r.t. karo ocp, bnk area&#x0d

Read more
Dismantling and laying of 8 inch dia m.s. pipeline required for extension of delivery pipeline of the 2000 g.p.m. pump motor set installed at the a patch in mine, involved in dewatering of the a patch, w.r.t. karo ocp, under bnk area

Dismantling and laying of 8 inch dia m.s. pipeline required for extension of delivery pipeline of the 2000 g.p.m. pump motor set installed at the a patch in mine, involved in dewatering of the a patch, w.r.t. karo ocp, under bnk area&#x0d

Read more
Repairing maintenance and complete overhauling of 01 no 2000gpm, 150 mtr head, multistage plurovan ii model, m and p make pump sl. no-81316960/20/11 at parej east open cast project hazaribagh area.

Repairing maintenance and complete overhauling of 01 no 2000gpm, 150 mtr head, multistage plurovan ii model, m and p make pump sl. no-81316960/20/11 at parej east open cast project hazaribagh area

Read more
Complete repairing overhauling of 500 gpm pump 5 stage rkb/ mla of kugp make kbl head 150 meter sl no. 29v2ab670/0040 and b) 500 gpm pump 5 stage rkb/ mla of kugp make kbl head 150 meter local sl no.kugp/rkb003 at kugp

Complete repairing overhauling of 500 gpm pump 5 stage rkb/ mla of kugp make kbl head 150 meter sl no. 29v2ab670/0040 and b) 500 gpm pump 5 stage rkb/ mla of kugp make kbl head 150 meter local sl no.kugp/rkb003 at kugp

Read more
Repairing and overhauling of rkb 150 34k4 type make kbl, 1000 gpm, 150m head pump for quarry sump for upcoming monsoon at gidi- c colliery under argada area.

Repairing and overhauling of rkb 150 34k4 type make kbl, 1000 gpm, 150m head pump for quarry sump for upcoming monsoon at gidi- ccolliery under argada area.

Read more
Repairing of pl ii pump 1200 gpm, 150 mtr head 5 stage pump at dahibari ocp, cv area no xii

Repairing of pl ii pump 1200 gpm, 150 mtr head 5 stage pump at dahibari ocp, cv area no xii

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise