Tender Details

Particulars Details
Title
Complete Overhauling And Repairing Of 01 No. 2000 Gpm Pump, Name Plate Missing, 3 Chr, Make Mn P And Onsite Commissioning Of The Pump On The Base Plate And Alignment With The Three Phase Induction Motor In Mine W.R.T. Karo Ocp, Bn K Area
Description
Complete Overhauling And Repairing Of 01 No. 2000 Gpm Pump, Name Plate Missing, 3 Chr, Make Mn P And Onsite Commissioning Of The Pump On The Base Plate And Alignment With The Three Phase Induction Motor In Mine W.R.T. Karo Ocp, Bn K Area
Organisation Central Coalfields Limited | Public Sector Undertakings
Tender Id 2024_CCL_318367_1
Reference
Number
P.E. (EnM)/ Karo OCP/ e-tender/ 2024-25/ 47
Tender Fee 0
EMD 3400
Tender Value
Place Karo OCP
Link https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=330000
Start Date October 01, 2024 16:30
End Date

10/10/2024 ( Expired 262 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Part repairing, overhauling and maintenance work of the tata make departmental truck bearing no. br20g0880, w.r.t. karo ocp, under bnk area

Part repairing, overhauling and maintenance work of the tata make departmental truck bearing no. br20g0880, w.r.t. karo ocp, under bnk area

Read more
Dismantling of pump from base plate n pipe line and running repairing of dsm -6 pump (1000gpm) (kgw shed) and commissioning the pump wnp, make-kirloskar having punch sl. no. bnk/iwsp/dsm6/kgw/02 on base plate after repair with alignment

Dismantling of pump from base plate n pipe line and running repairing of dsm -6 pump (1000gpm) (kgw shed) and commissioning the pump wnp, make-kirloskar having punch sl. no. bnk/iwsp/dsm6/kgw/02 on base plate after repair with alignment

Read more
Construction of protective boundary through a portion of the pipeline of 2000 g.p.m. pump, in operation in mine, feeding water to the tanker point, by rail poles and work of channel, angle iron, under karo ocp, bnk area

Construction of protective boundary through a portion of the pipeline of 2000 g.p.m. pump, in operation in mine, feeding water to the tanker point, by rail poles and work of channel, angle iron, under karo ocp, bnk area

Read more
Onsite overhauling and repairing of the transformer 3.3 kv by 440 v, 100 kva, name plate missing transformer installed at the substation under karo ocp, bnk area.

Onsite overhauling and repairing of the transformer 3.3 kv by 440 v, 100 kva, name plate missing transformer installed at the substation under karo ocp, bnk area.&#x0d

Read more
Complete overhauling and repairing of 01 no. 2000 gpm pump, name plate missing, 3chr, make mnp and onsite commissioning of the pump on the base plate and alignment with the three phase induction motor in mine w.r.t. karo ocp, bnk area

Complete overhauling and repairing of 01 no. 2000 gpm pump, name plate missing, 3chr, make mnp and onsite commissioning of the pump on the base plate and alignment with the three phase induction motor in mine w.r.t. karo ocp, bnk area&#x0d

Read more
Dismantling, extension cum laying of the 8 inch dia m.s. pipes of the 2000 g.p.m. pump motor set, supplying water to the village pond in mine, w.r.t. karo ocp, under bnk area

Dismantling, extension cum laying of the 8 inch dia m.s. pipes of the 2000 g.p.m. pump motor set, supplying water to the village pond in mine, w.r.t. karo ocp, under bnk area

Read more
On site prive maintenance of one no. 3.3 kv by 440 v, 630 kva (name plate missing) transformer, installed at kargali railway siding, and onsite prive maintenance of six nos. of transformers of capacity 40 kva to 100 kva, under karo ocp, bnk

On site prive maintenance of one no. 3.3 kv by 440 v, 630 kva (name plate missing) transformer, installed at kargali railway siding, and onsite prive maintenance of six nos. of transformers of capacity 40 kva to 100 kva, under karo ocp, bnk

Read more
Dismantling and laying of 8 inch dia m.s. pipeline required for extension of delivery pipeline of the 2000 g.p.m. pump motor set installed at the a patch in mine, involved in dewatering of the a patch, w.r.t. karo ocp, under bnk area

Dismantling and laying of 8 inch dia m.s. pipeline required for extension of delivery pipeline of the 2000 g.p.m. pump motor set installed at the a patch in mine, involved in dewatering of the a patch, w.r.t. karo ocp, under bnk area&#x0d

Read more
(1) making of 04 nos. of motor dala end cover and 04 nos.bearing grease cap of at akwmc for 150hp and 167 hp.(2) fabrication of base plate h.t pump motor to be installed at ocp pump.(3) dismantling of 3000 gpm pump flow more an

(1) making of 04 nos. of &#x0d motor dala end cover and &#x0d 04 nos.bearing grease cap &#x0d of at akwmc for 150hp and &#x0d 167 hp.(2) fabrication of &#x0d base plate h.t pump motor &#x0d to be installed at ocp &#x0d pump.(3) dismantling of &#x0d 3000 gpm pump flow more an

Read more
(a) complete repairing rkb pump of 2000 gpm, make kirloskar, type rkb/250/46k, 4 stage jarangdih colliery. (b) repairing and maintenance works of kirloskar make, 3chr, 2000 gpm, 250x300, multistage, rkb, h.t. pump assembly in respect of jarangdih ocp

(a) complete repairing rkb pump of 2000 gpm, make kirloskar, type rkb/250/46k, 4 stage jarangdih colliery. (b) repairing and maintenance works of kirloskar make, 3chr, 2000 gpm, 250x300, multistage, rkb, h.t. pump assembly in respect of jarangdih ocp

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise