| Particulars | Details |
|---|---|
| Title |
Shifting Of Htoh Line Along The Roadside Of Purulia Barakar Road At Gosala More Due To Construction Of Rob Bridge And Widening Of Road Over Railway Crossing Under Purulia Division
|
| Description |
Shifting Of Htoh Line Along The Roadside Of Purulia Barakar Road At Gosala More Due To Construction Of Rob Bridge And Widening Of Road Over Railway Crossing Under Purulia Division
|
| Organisation | WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD | State Govt. and UT |
| Tender Id | 2026_WBSED_1025706_1 |
|
Reference Number |
PRLD/E-TENDER/2026-27/01/525 |
| Tender Fee | 0 |
| EMD | 19126 |
| Tender Value | - |
| Place | Purulia Division Office, Purulia |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=2520316 |
| Start Date | May 29, 2026 16:30 |
| End Date |
Expired
12/06/2026
Expired 124 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Shifting of water supply pipe lines and sewer line due to construction of rob at level crossing
Shifting of water supply pipe lines and sewer line due to construction of rob at level crossing
Read moreDeposit-utility shifting of pipe line under wss to kunhimangalam phase ii- due to rob construction at ezhimala railway crossing
Deposit-utility shifting of pipe line under wss to kunhimangalam phase ii- due to rob construction at ezhimala railway crossing
Read moreModification in 66 kv transmission line due to construction of two lane rob in lieu of level crossing no. 560 at km 1467/14-16 in agra - palwal section
For complete deion and other details, please refer to tender
Read moreWidening and strengthening, reconstruction work of rani road, rob barmasiya to kusumatand (mukunda) more via jhariya vihar colony belgariya road (length-7.612 km) in dhanbad district on deposit basis
Widening and strengthening, reconstruction work of rani road, rob barmasiya to kusumatand (mukunda) more via jhariya vihar colony belgariya road (length-7.612 km) in dhanbad district on deposit basis
Read moreProviding and laying c.i. pipe for water supply due to widening of the railway track from kharwat railway crossing to chp at churcha(ro) sub area of baikunthpur area
Providing and laying c.i. pipe for water supply due to widening of the railway track from kharwat railway crossing to chp at churcha(ro) sub area of baikunthpur area
Read moreShifting di and re-errection of existing electrical infrastructure of 11 kv htoh line ltoh lines due to widening and strengthening of pwd road from bhutasarasingi to mathasarasingi from 0 000 to 10 132 km at for different viz- arakhapur, barap
Electrical shifting work
Read moreWork for taking out of di pipes and relaying of the same at tenga road (from college more to paper mill ) due to widening of pwd road within jhargram municipality
Work for taking out of di pipes and relaying of the same at tenga road (from college more to paper mill ) due to widening of pwd road within jhargram municipality
Read moreLaying of pipeline in connection with shifting of bothside (rising main and distribution) water supply pipeline for widening of road from nimatala more to talpukur rail crossing within tamralipta municipality
Laying of pipeline in connection with shifting of bothside (rising main and distribution) water supply pipeline for widening of road from nimatala more to talpukur rail crossing within&#x0d tamralipta municipality&#x0d
Read moreInstallation of street lights at taladanda canal right embankment road from nayabazar junction to matagajpur nua bandha level crossing from 5/200 to 8/000 km, cuttack under state plan due to widening and strengthening of above road.
Installation of street lights at taladanda canal right embankment road from nayabazar junction to matagajpur nua bandha level crossing from 5/200 to 8/000 km, cuttack under state plan due to widening and strengthening of above road.
Read moreUtility shifting of existing rising main pipe line of 450mm dia d.i. pipe between durga soren chowk to namkum rob due to widening existing road into four lane road by road construction department road division, ranchi rural, under d.w.and s. sw. dist
Utility shifting of existing rising main pipe line of 450mm dia d.i. pipe between durga soren chowk to namkum rob due to widening existing road into four lane road by road construction department road division, ranchi rural, under d.w.and s. sw. dist
Read moreof your Industry type