Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of 2 Mld Intermediate Pumping Station (Ips), Laying Of Di Rising Main From Proposed Ips To Stp, Construction Of Treated Effluent Sump
|
| Description |
Construction Of 2 Mld Intermediate Pumping Station (Ips), Laying Of Di Rising Main From Proposed Ips To Stp, Construction Of Treated Effluent Sump And Laying Of Di Rising Main From Stp To Drain No.2, Dismantling Of Existing Ohsr And Existing Pump Cham
|
| Organisation | Haryana Government | State Govt. and UT |
| Tender Id | 2026_HRY_520159_1 |
|
Reference Number |
20261CFEE69C 4BBB 45E9 AFAB C9459EEC3C6C574PUH |
| Tender Fee | 16000 |
| EMD | 5.29 Lakh |
| Tender Value | - |
| Place | BAPOLI |
| Link |
View Original Tender Notice
https://etenders.hry.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=599049 |
| Start Date | May 07, 2026 23:30 |
| End Date |
Expired
14/05/2026
Expired 156 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
P/l 900 mm dia treated effluent rising main from 900 mm dia twin rising main near ppcl bawana to harewali- minor along western jamuna canal. nit-07
Nit no. 07(2026-27) ee(pr)sr-i
Read moreConstruction of treated sewage pumping station, drain outfall for disposal of treated sewage from 9 mld stp and o&m of above work for 15 years at naugachiya.
Construction of treated sewage pumping station, drain outfall for disposal of treated sewage from 9 mld stp and o&m of above work for 15 years at naugachiya.
Read moreConstruction of water supply sump wells and sewerage infrastructure including sps, stp and treated wastewater sps for ujjain simhasth mela area (blocks 1, 2, 3 and 4 including gonsa area), along with operation and maintenance works
Construction of water supply sump wells and sewerage infrastructure including sps, stp and treated wastewater sps for ujjain simhasth mela area (blocks 1, 2, 3 and 4 including gonsa area), along with operation and maintenance works
Read moreDg - lote-parshuram...m and r to eds lote parshuram indl. area.. urgent replacement of damaged 200mm dia hdpe effluent collection pipeline by 200mm dia effluent pumping main from plot no. a-5-2 to plot no. p-36 of a sump in lote parshuram indl. are
Urgent replacement of damaged 200mm dia hdpe effluent collection pipeline by 200mm dia effluent pumping main from plot no. a-5-2 to plot no. p-36 of a sump in lote parshuram indl. area
Read moreProviding laying of sewer construction of ips mps laying of rising main and construction installing and commissioning of 5.5 mld stp plant cum 17 kld fstp based on and all other works contingent there to at gharuan distt sas nagar sbm 2 scheme
Providing laying of sewer construction of ips mps laying of rising main and construction installing and commissioning of 5.5 mld stp plant cum 17 kld fstp based on and all other works contingent there to at gharuan distt sas nagar sbm 2 scheme
Read moreEarthwork for excavation of trenches for laying of hdpe ugps construction of pump room construction of sump well pumping system and electric work in pump room complete at stp kot shamir tehsil and district bathinda
Earthwork for excavation of trenches for laying of hdpe ugps construction of pump room construction of sump well pumping system and electric work in pump room complete at stp kot shamir tehsil and district bathinda
Read moreConstruction of 2mld intermediate pumping station (ips), laying of di rising main from proposed ips to stp, construction of treated effluent sump and laying of di rising main from stp to drain no.2, dismantling of existing ohsr and existing pump cham
Construction of 2mld intermediate pumping station (ips), laying of di rising main from proposed ips to stp, construction of treated effluent sump and laying of di rising main from stp to drain no.2, dismantling of existing ohsr and existing pump cham
Read moreOnstruction of 2mld intermediate pumping station (ips), laying of di rising main from proposed ips to stp, construction of treated effluent sump and laying of di rising main from stp to drain no.2, dismantling of existing ohsr and existing pump cham
Construction of 2mld intermediate pumping station (ips), laying of di rising main from proposed ips to stp, construction of treated effluent sump and laying of di rising main from stp to drain no.2, dismantling of existing ohsr and existing pump cham
Read moreMeasurement of discharge in drains/ips(intermediate pumping station)/stp/canal/nallah etc. at faridabad.
Measurement of discharge in drains/ips(intermediate pumping station)/stp/canal/nallah etc. at faridabad
Read moreConstruction of intermediate pumping stations ips including pl of sewer network rising main and allied works at baramulla
Construction of intermediate pumping stations ips including pl of sewer network rising main and allied works at baramulla
Read moreof your Industry type