Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Investigation Survey On Gis Basis And Construction Of 6 Mld Stp With Cotreatment Including Mps I And D Of Drains And Structure Ips Rising Main Treated Effluent Line With Scada Etc
|
| Description |
Investigation Survey On Gis Basis And Construction Of 6 Mld Stp With Cotreatment Including Mps I And D Of Drains And Structure Ips Rising Main Treated Effluent Line With Scada Etc
|
| Organisation | U P Jal Nigam (HQ), Lucknow | State Govt. and UT |
| Tender Id | 2025_UPJNM_1001594_1 |
|
Reference Number |
92/M-16/16 Dated 30-01-2025 |
| Tender Fee | 23600 |
| EMD | 13.4 Lakh |
| Tender Value | - |
| Place | NAGAR PALIKA PARISHAD AONLA |
| Link |
View Original Tender Notice
https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1879443 |
| Start Date | May 08, 2025 20:30 |
| End Date |
Expired
09/06/2025
Expired 491 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Operation and maintenance of 58 mld stp 09 nos ips and 2 nos mps in moradabad city
Operation and maintenance of 58 mld stp 9 nos ips and 2 nos mps in moradabad city near gulabbadi distt moradabad including labour consumables minor and major repair of civil and electrical mechanical works excluding diesel and mobile oil and disposa
Read moreIntercepting sewer line gravity main treated effluent main 10.00 mld sewage treatment plant at nagar palika parishad mahoba district mahoba
Intercepting sewer line gravity main treated effluent main 10.00 mld sewage treatment plant at nagar palika parishad mahoba district mahoba
Read moreRoutine operation and preventive maintenance work of 120 mld stp, teps, mps goithaha and narokhar ips at varanasi as is where is basis
Routine operation and preventive maintenance work of 120 mld stp, teps, mps goithaha and narokhar ips at varanasi as is where is basis
Read moreProviding laying of sewer construction of ips mps laying of rising main and construction installing and commissioning of 5.5 mld stp plant cum 17 kld fstp based on and all other works contingent there to at gharuan distt sas nagar sbm 2 scheme
Providing laying of sewer construction of ips mps laying of rising main and construction installing and commissioning of 5.5 mld stp plant cum 17 kld fstp based on and all other works contingent there to at gharuan distt sas nagar sbm 2 scheme
Read moreProviding laying cutting testig of sewer rcc np 3 with hdpe lining and rising main d i k 9 pipe cont m h chamber hatch box mps and survey design supply and soil testing const inst comm of 20 mld stp cum 60 kld fstp inclluding o and m gurdaspur
Providing laying cutting testnig of sewer rcc np 3 with hdpe lining and rising main d i k 9 pipe cont m h chamber hatch box mps and survey design supply and soil testing const inst comm of 20 mld stp cum 60 kld fstp including o and m gurdaspur
Read moreInvestigation survey on gis basis and construction of 10.20 mld stp with cotreatment including mps i and d of drains and structure rising main treated effluent line with scada etc
Investigation survey on gis basis and construction of 10.20 mld stp with 19.20 co treatment including mps i and d of drains and structure rising main treated effluent line with scada etc
Read moreInvestigation survey on gis basis and construction of 8 mld stp with 20 kld cotreatment including mps i and d of drains and structure rising main treated effluent line with scada etc
Investigation survey on gis basis and construction of 8 mld stp with 20 kld cotreatment including mps i and d of drains and structure rising main treated effluent line with scada etc
Read moreInvestigation survey on gis basis and construction of 8 mld stp with 20 kld cotreatment including mps i and d of drains and structure rising main treated effluent line with scada etc in bisalpur npp
Investigation survey on gis basis and construction of 8 mld stp with 20 kld cotreatment including mps i and d of drains and structure rising main treated effluent line with scada etc
Read moreInvestigation survey on g i s basis and construction of stp with cotreatment including mps i and d of drains and structure rising main treated effluent line with scada etc in faridpur nagar palika parishad bareilly
Investigation survey on g i s basis and construction of 10.20 mld stp with 19.20 kld cotreatment including mps i nd d of drains and structure rising main treated effluent line with scada etc in faridpur nagar palika parishad bareilly &#x0d
Read moreConstruction of 2mld intermediate pumping station (ips), laying of di rising main from proposed ips to stp, construction of treated effluent sump
Construction of 2mld intermediate pumping station (ips), laying of di rising main from proposed ips to stp, construction of treated effluent sump and laying of di rising main from stp to drain no.2, dismantling of existing ohsr and existing pump cham
Read moreof your Industry type