Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Repair Of Cupboard, Wood Work And Flooring In Room No. 17, 18, 19, 20, 29, 30, 31, 32 And 33 At University Guest House, University Of Delhi.
|
| Description |
Repair Of Cupboard, Wood Work And Flooring In Room No. 17, 18, 19, 20, 29, 30, 31, 32 And 33 At University Guest House, University Of Delhi.
|
| Organisation | Central Public Procurement Portal 1 |
| Tender Id | 2023_DU_773653_1 |
|
Reference Number |
CEET-5156 |
| Tender Fee | 500 |
| EMD | 19727 |
| Tender Value | - |
| Place | Engineering Department |
| Link |
View Original Tender Notice
https://eprocure.gov.in |
| Start Date | September 27, 2023 23:30 |
| End Date |
Expired
09/10/2023
Expired 1102 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Providing and fixing floor tile, plaster work, cupboard, distempering , painting, wood work and other allied work at c-26, (29-31) , university of delhi
Providing and fixing floor tile, plaster work, cupboard, distempering , painting, wood work and other allied work at c-26, (29-31) , university of delhi
Read moreRepair/ maintenance of plaster, wood work in kitchen, tiles work in bathroom/ toilet, painting, distempering and other allied works of vacant flat 5/19 university road and waterproofing of d-14 (29-31) probyn road, university of delhi
Repair/ maintenance of plaster, wood work in kitchen, tiles work in bathroom/ toilet, painting, distempering and other allied works of vacant flat 5/19 university road and waterproofing of d-14 (29-31) probyn road, university of delhi
Read moreReplacement of rusted/damaged power distribution panel, faulty power cable and allied works at pump room 29 - 31, probyn road, university of delhi
Replacement of rusted/damaged power distribution panel, faulty power cable and allied works at pump room 29 - 31, probyn road, university of delhi
Read moreWater proofing treatment (brick bat coba), finishing wall, sanitary work, replacement of water tank and other misc. work at d-2, c-7 servant quarter (29-31) probyn road and 7/3 university road, university of delhi
Water proofing treatment (brick bat coba), finishing wall, sanitary work, replacement of water tank and other misc. work at d-2, c-7 servant quarter (29-31) probyn road and 7/3 university road, university of delhi
Read moreKota stone flooring in staircase c-81 to c-88 and water proofing (brick bat coba),repair of ceiling plaster,wood work in kitchen, sanitary work in bathroom toilets and finishing work in c-84(new allotment),repair of ceiling plaster in staircase c-41
Kota stone flooring in staircase c-81 to c-88 and water proofing (brick bat coba),repair of ceiling plaster,wood work in kitchen, sanitary work in bathroom toilets and finishing work in c-84(new allotment),repair of ceiling plaster in staircase c-41
Read moreBus hiring service - regular basis - outstation 24*7 9-12, 13-15, 16-18, 19-21, 22-24, 25-27, 28-30, 31-33, 34-36, 37-39 non deluxe (ndx) 2400 km(s) diesel 2021
Bus hiring service - regular basis - outstation 24*7 9-12, 13-15, 16-18, 19-21, 22-24, 25-27, 28-30, 31-33, 34-36, 37-39 non deluxe (ndx) 2400 km(s) diesel 2021
Read moreRepair of barbed wire fencing and painting of aluminum paint on barbed wire fencing along 75 mtr wide road central verge, road no. 13 and 17, between sector-28, 29 and 32, 33, yeida wc-h
Repair of barbed wire fencing and painting of aluminum paint on barbed wire fencing along 75 mtr wide road central verge, road no. 13 and 17, between sector-28, 29 and 32, 33, yeida wc-h
Read more(re-invite) supply and replacement of defective electric operated boom complete set and replacement of defective auto boom locking arrangement for existing lifting barriers.(lc no: 6,10, 11, 17, 23, 24,25, 27, 30, 31, 32, 40, 41, 42, 42a, 43 and 49. total = 17 gates) in den(e)section.
(re-invite) supply and replacement of defective electric operated boom complete set and replacement of defective auto boom locking arrangement for existing lifting barriers.(lc no: 6,10, 11, 17, 23, 24,25, 27, 30, 31, 32, 40, 41, 42, 42a, 43 and 49. total = 17 gates) in den(e)section.
Read moreWaterproof plywood 8x4 feet x 19mm thick,waterproof plywood 8x4 feet x 25mm thick,three-fourths inch wood screws,1 inch wood screws,mica sheet 8x4 feet and half white colour,mica sheet 8x4 feet and teak wood colour,zero degree hinges,4 inches ss handle,three-fourths inch head less nails,1 inch head less nails,1 inch nail,1 half inch x one-fourth inch teak wood beading 7 feet height,1 half inch wall mounting screw with wood rawal plug,fevical or sh,teak wood finish edge tape 19mm,half white finish edge tape 19mm,probond fevicol,2 inch cupboard lock,4 inches ss tower bolt,4 inches ss door hinges,vinyal flooring sheet - wood pattern,stainless steel 304 mosquito wire mesh, 15 mesh, 0.4mm hole, 1mm thick
Waterproof plywood 8x4 feet x 19mm thick,waterproof plywood 8x4 feet x 25mm thick,three-fourths inch wood screws,1 inch wood screws,mica sheet 8x4 feet and half white colour,mica sheet 8x4 feet and teak wood colour,zero degree hinges,4 inches ss handle,three-fourths inch head less nails,1 inch head less nails,1 inch nail,1 half inch x one-fourth inch teak wood beading 7 feet height,1 half inch wall mounting screw with wood rawal plug,fevical or sh,teak wood finish edge tape 19mm,half white finish edge tape 19mm,probond fevicol,2 inch cupboard lock,4 inches ss tower bolt,4 inches ss door hinges,vinyal flooring sheet - wood pattern,stainless steel 304 mosquito wire mesh, 15 mesh, 0.4mm hole, 1mm thick
Read moreRailway track crossing by pipe pushing method at km/tp-66/27-29 and km/tp-66/28-30 between stations mxy and dxn of east central railway (bomb minor at km. 2.925) and km/tp-64/29-31 and km/tp-64/30-32 between stations mxy and wdm of east central railw
Railway track crossing by pipe pushing method at km/tp-66/27-29 and km/tp-66/28-30 between stations mxy and dxn of east central railway (bomb minor at km. 2.925) and km/tp-64/29-31 and km/tp-64/30-32 between stations mxy and wdm of east central railw
Read moreof your Industry type