Bifurcation Of Existing 11 Kv Maisammaguda Feeder
Description
Bifurcation Of Existing 11 Kv Maisammaguda Feeder Emanating From 33/11 Kv G.P.Pally Ss By Proposing 1.80 Km Of New 11 Kv Feeder From The Same Ss With Stringing Of 1.8 Km Of 55 Sqmm. Aaa Conductor On 11mts And 9.1 Mtr Pscc Poles And Laying Of 190 Mtrs (D.Run) Of 11 Kv Xlpe 3 X185 Sqmm Ug Cable Duly Erecting Additional 1 No. 11 Kv Bay And Breaker At 33/11 Kv G.P.Pally Ss In G.P.Pally Section Providing Of New 11 Kv Feeder From 33/11 Kv Hmt Ss With Stringing Of 2345 Mtrs Of 11 Kv 3 X18570 Sq.Mm. Ab Cable Over Now Proposed 24 No Of 9.1mtr Pscc Poles And Existing 100 Poles Along With Erection Of 1 No. 11 Kv Bay And Breaker For Bifurcation Existing 11 Kv Padma Nagar Feeder Emanating From 33/11 Kv Subhash Nagar Ss Of Medchal Sub Division Of Medchal Division And The Work D By Construction Division Of Medchal Circle Under Tand D Improvement To Original Works
Organisation Information Technology Electronics and Communication Department Telangana | State Govt. and UT
Tender Id 567326
Reference
Number
CE/OP/Medchal Zone -17/A/24-25
Tender Fee 712
EMD 40202
Tender Value
Place TS
Link http://eprocurement.telangana.gov.in/
Start Date January 09, 2025 01:00
End Date

21/01/2025 ( Expired 158 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Upgradation, improvement and augmentation of the existing 160 mld salauli water treatment plant upto 240 mld.

Upgradation, improvement and augmentation of the existing 160 mld salauli water treatment plant upto 240 mld.

Read more
Ie services during onm period for four laning of nh-365a from kodad (design km 0.00/ existing km.185.00 of nh-65) to khammam (design km.31.800/ existing km.29.400) (design length 31.800 km) in the state of telangana under bharatmala pariyojana on ham

Ie services during onm period for four laning of nh-365a from kodad (design km 0.00/ existing km.185.00 of nh-65) to khammam (design km.31.800/ existing km.29.400) (design length 31.800 km) in the state of telangana under bharatmala pariyojana on ham

Read more
Reconstruction of existing major bridge near manik nagar at km.99.225 on nh 50 bidar humnabad section in the state of karnataka under annual plan 2024 25 on epc mode

Reconstruction of existing major bridge near manik nagar at km.99.225 on nh 50 bidar humnabad section in the state of karnataka under annual plan 2024 25 on epc mode

Read more
Modification / shifting of 220 kv bamnauli-dial overhead, double circuit transmission line infringing to new proposed track at bijwasan railway station on turnkey basis.

Modification / shifting of 220 kv bamnauli-dial overhead, double circuit transmission line infringing to new proposed track at bijwasan railway station on turnkey basis.

Read more
Rehabilitation of existing distressed road section of loni-burhanpur on nh-347c in the state of madhya pradesh on epc mode

Rehabilitation of existing distressed road section of loni-burhanpur on nh-347c in the state of madhya pradesh on epc mode

Read more
Construction of shed and office cum guard room for separation at trenching ground molimohgaon (augmentation of existing processing facility for solid waste management) mandla dist. mandla (m.p.)

Construction of shed and office cum guard room for separation at trenching ground molimohgaon (augmentation of existing processing facility for solid waste management) mandla dist. mandla (m.p.)

Read more
Expansion of existing fire and gas detection system at process plant, dahej plant ongc

Expansion of existing fire and gas detection system at process plant, dahej plant ongc

Read more
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham

Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham

Read more
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.

Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.

Read more
Manufacturing testing supply erection and commissioning of 1 no 33 by 11 kv 5 mva 3 phase power transformer at shanan ph pspcl

Manufacturing testing supply erection and commissioning of 1 no 33 by 11 kv 5 mva 3 phase power transformer at shanan ph pspcl