Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Bifurcation Of Existing 11 Kv Maisammaguda Feeder
|
Description |
Bifurcation Of Existing 11 Kv Maisammaguda Feeder Emanating From 33/11 Kv G.P.Pally Ss By Proposing 1.80 Km Of New 11 Kv Feeder From The Same Ss With Stringing Of 1.8 Km Of 55 Sqmm. Aaa Conductor On 11mts And 9.1 Mtr Pscc Poles And Laying Of 190 Mtrs (D.Run) Of 11 Kv Xlpe 3 X185 Sqmm Ug Cable Duly Erecting Additional 1 No. 11 Kv Bay And Breaker At 33/11 Kv G.P.Pally Ss In G.P.Pally Section Providing Of New 11 Kv Feeder From 33/11 Kv Hmt Ss With Stringing Of 2345 Mtrs Of 11 Kv 3 X18570 Sq.Mm. Ab Cable Over Now Proposed 24 No Of 9.1mtr Pscc Poles And Existing 100 Poles Along With Erection Of 1 No. 11 Kv Bay And Breaker For Bifurcation Existing 11 Kv Padma Nagar Feeder Emanating From 33/11 Kv Subhash Nagar Ss Of Medchal Sub Division Of Medchal Division And The Work D By Construction Division Of Medchal Circle Under Tand D Improvement To Original Works
|
Organisation | Information Technology Electronics and Communication Department Telangana | State Govt. and UT |
Tender Id | 567326 |
Reference Number |
CE/OP/Medchal Zone -17/A/24-25 |
Tender Fee | 712 |
EMD | 40202 |
Tender Value | |
Place | TS |
Link | http://eprocurement.telangana.gov.in/ |
Start Date | January 09, 2025 01:00 |
End Date |
21/01/2025 ( Expired 158 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgradation, improvement and augmentation of the existing 160 mld salauli water treatment plant upto 240 mld.
Upgradation, improvement and augmentation of the existing 160 mld salauli water treatment plant upto 240 mld.
Read moreIe services during onm period for four laning of nh-365a from kodad (design km 0.00/ existing km.185.00 of nh-65) to khammam (design km.31.800/ existing km.29.400) (design length 31.800 km) in the state of telangana under bharatmala pariyojana on ham
Ie services during onm period for four laning of nh-365a from kodad (design km 0.00/ existing km.185.00 of nh-65) to khammam (design km.31.800/ existing km.29.400) (design length 31.800 km) in the state of telangana under bharatmala pariyojana on ham
Read moreReconstruction of existing major bridge near manik nagar at km.99.225 on nh 50 bidar humnabad section in the state of karnataka under annual plan 2024 25 on epc mode
Reconstruction of existing major bridge near manik nagar at km.99.225 on nh 50 bidar humnabad section in the state of karnataka under annual plan 2024 25 on epc mode
Read moreModification / shifting of 220 kv bamnauli-dial overhead, double circuit transmission line infringing to new proposed track at bijwasan railway station on turnkey basis.
Modification / shifting of 220 kv bamnauli-dial overhead, double circuit transmission line infringing to new proposed track at bijwasan railway station on turnkey basis.
Read moreRehabilitation of existing distressed road section of loni-burhanpur on nh-347c in the state of madhya pradesh on epc mode
Rehabilitation of existing distressed road section of loni-burhanpur on nh-347c in the state of madhya pradesh on epc mode
Read moreConstruction of shed and office cum guard room for separation at trenching ground molimohgaon (augmentation of existing processing facility for solid waste management) mandla dist. mandla (m.p.)
Construction of shed and office cum guard room for separation at trenching ground molimohgaon (augmentation of existing processing facility for solid waste management) mandla dist. mandla (m.p.)
Read moreExpansion of existing fire and gas detection system at process plant, dahej plant ongc
Expansion of existing fire and gas detection system at process plant, dahej plant ongc
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Read moreManufacturing testing supply erection and commissioning of 1 no 33 by 11 kv 5 mva 3 phase power transformer at shanan ph pspcl
Manufacturing testing supply erection and commissioning of 1 no 33 by 11 kv 5 mva 3 phase power transformer at shanan ph pspcl
Read moreof your Industry type