Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
General Electrical Alteration Of Pwd Electrical Wing Section 2 Kottayam Inconnection With Civil Rennovation Work Alteration Work General Electrical Work
|
Description |
General Electrical Alteration Of Pwd Electrical Wing Section2 Kottayam Inconnection With Civil Renovation Work Alteration Work General Electrical Work
|
Organisation | Government of Kerala |
Tender Id | 2023_PWD_604570_1 |
Reference Number |
ESDK_ET_59_2023_2024 |
Tender Fee | 555 |
EMD | 2116 |
Tender Value | |
Place | kottayam |
Link | https://etenders.kerala.gov.in |
Start Date | September 19, 2023 21:00 |
End Date |
26/09/2023 ( Expired 643 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Consultancy services for authoritys engineer for supervision of work of upgradation of shahgarh buxwaha narsinghgarh damoh section of nh-34 (from ch 113/00 to ch 176/500) to 2lane with paved shoulders in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation of shahgarh buxwaha narsinghgarh damoh section of nh-34 (from ch 113/00 to ch 176/500) to 2lane with paved shoulders in the state of madhya pradesh on epc mode
Read moreConsultancy services for authoritys engineer for supervision of work of up-gradation and construction to 2l with ps of chanderi-pichhore road section of nh-346, design length-55.150 chanderi link bypass in the state of madhya pradesh
Consultancy services for authoritys engineer for supervision of work of up-gradation and construction to 2l with ps of chanderi-pichhore road section of nh-346, design length-55.150 chanderi link bypass in the state of madhya pradesh
Read moreConstruction of two lane with paved shoulder from design km 45.325 (ex km 48.870) near basinda village to design km 90.010 (ex km 97.903) near roshni village section of nh-347b of betul-khandwa package-2 in the state of madhya on ham
Construction of two lane with paved shoulder from design km 45.325 (ex km 48.870) near basinda village to design km 90.010 (ex km 97.903) near roshni village section of nh-347b of betul-khandwa package-2 in the state of madhya on ham
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Read moreInstallation and re-fixing of new paver block, inserting of beem, maintenance and other civil work of kalika garden situated at scheme no. 136 a-2 under ward no. 34 zone no.07
Installation and re-fixing of new paver block, inserting of beem, maintenance and other civil work of kalika garden situated at scheme no. 136 a-2 under ward no. 34 zone no.07
Read moreInstallation and re-fixing of new paver block, inserting of beem, maintenance and other civil work of ekta garden situated at scheme no. 136 a-2 under ward no. 34 zone no.07
Installation and re-fixing of new paver block, inserting of beem, maintenance and other civil work of ekta garden situated at scheme no. 136 a-2 under ward no. 34 zone no.07
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreElectrical works associated with routine maintenance work of electric power distribution section at iit kharagpur.
Electrical works associated with routine maintenance work of electric power distribution section at iit kharagpur.
Read moreArc for work of construction and commissioning of 200 mm dia tubewell with pljt of pipeline with 2 years of dlp under sub division neemrana under jurisdiction of ee phed behror district kotputli-behror.
Arc for work of construction and commissioning of 200 mm dia tubewell with pljt of pipeline with 2 years of dlp under sub division neemrana under jurisdiction of ee phed behror district kotputli-behror.
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreof your Industry type