Tender Details
Particulars | Details |
---|---|
Title |
General Electrical Alteration Of Pwd Electrical Wing Section 2 Kottayam Inconnection With Civil Rennovation Work Alteration Work General Electrical Work
|
Description |
General Electrical Alteration Of Pwd Electrical Wing Section2 Kottayam Inconnection With Civil Renovation Work Alteration Work General Electrical Work
|
Organisation | Government of Kerala |
Tender Id | 2023_PWD_604570_1 |
Reference Number |
ESDK_ET_59_2023_2024 |
Tender Fee | 555 |
EMD | 2116 |
Tender Value | |
Place | kottayam |
Link | https://etenders.kerala.gov.in |
Start Date | September 19, 2023 21:00 |
End Date |
26/09/2023 ( Expired 606 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of two lane with paved shoulder from design km 45.325 (ex km 48.870) near basinda village to design km 90.010 (ex km 97.903) near roshni village section of nh-347b of betul-khandwa package-2 in the state of madhya on ham
Construction of two lane with paved shoulder from design km 45.325 (ex km 48.870) near basinda village to design km 90.010 (ex km 97.903) near roshni village section of nh-347b of betul-khandwa package-2 in the state of madhya on ham
Read moreWork of augmentation of existing 18 no. 33 kv sub-stations along with augmentation of associated 33 kv lines and civil works on turnkey basis within the jurisdiction of uhbvn under rdss.
Work of augmentation of existing 18 no. 33 kv sub-stations along with augmentation of associated 33 kv lines and civil works on turnkey basis within the jurisdiction of uhbvn under rdss.
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreSitc of dewatering pump, invertor with battery, cleaning of outlet chamber for primary clarifier no. 2, laying of new pvc pipe line from rotameter outlet to cct tank and other work at 80 mld dinapur stp, varanasi.
Sitc of dewatering pump, invertor with battery, cleaning of outlet chamber for primary clarifier no. 2, laying of new pvc pipe line from rotameter outlet to cct tank and other work at 80 mld dinapur stp, varanasi.
Read moreConstruction of 220kv and 132kv transmission lines associated with 220kv gss betina (dist jaisalmer) in raj incl. survey, supply of all equipment/materials, erection (incl. civil work), testing and commissioning (turnkey project) bn9019002503
Construction of 220kv and 132kv transmission lines associated with 220kv gss betina (dist jaisalmer) in raj incl. survey, supply of all equipment/materials, erection (incl. civil work), testing and commissioning (turnkey project) bn9019002503
Read moreRoutine maintenance and incident management work of from sitarganj km 0 000 to tanakpur km 52 200 under nhdp iv on epc mode of two lane with paved shoulders of section of old nh 125 new nh 09 in the state of uttarakhand
Routine maintenance and incident management work of from sitarganj km 0 000 to tanakpur km 52 200 under nhdp iv on epc mode of two lane with paved shoulders of section of old nh 125 new nh 09 in the state of uttarakhand
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of mandla - nainpur section of nh 543 from km 190/400 to km 236/500 to 2l with ps configuration in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of mandla - nainpur section of nh 543 from km 190/400 to km 236/500 to 2l with ps configuration in the state of madhya pradesh on epc mode
Read moreKswmp valanchery municipality upgradation of mcf at ward 4 mcf upgradation general civil work
Kswmp valanchery municipality upgradation of mcf at ward 4 mcf upgradation general civil work
Read moreConstrcution of 200 feet wide concrete road from malerkotla road to sidhwan canal lohara bridge missing link 2 part c, ludhiana. including civil, public health, horticulture and electrical works including 05 years 1 plus 4 maintenance.
Constrcution of 200 feet wide concrete road from malerkotla road to sidhwan canal lohara bridge missing link 2 part c, ludhiana. including civil, public health, horticulture and electrical works including 05 years 1 plus 4 maintenance.
Read moreof your Industry type