Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Project No. 51/25 Setting Up Of She Lodge And Related Facilities In Connection With Km Mani Thanal Waiting Centre, Kottayam
|
| Description |
Project No. 51/25 Setting Up Of She Lodge And Related Facilities In Connection With Km Mani Thanal Waiting Centre, Kottayam
|
| Organisation | Kerala Electrical and Allied Engineering Co. Ltd | State Govt. and UT |
| Tender Id | 2025_KEL_729462_1 |
|
Reference Number |
KRO/BDC/1820/2025 |
| Tender Fee | 2950 |
| EMD | 49546 |
| Tender Value | |
| Place | KEL MAMALA |
| Link |
View Original Tender Notice
https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1162752 |
| Start Date | January 23, 2025 17:05 |
| End Date |
Expired
30/01/2025
Expired 506 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Read moreConsultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Read moreInvestigation survey on gis basis and construction of 300 kld and 900 kld stp with 4 kld co treatment 19 no leach pit each capacity 10 kld i and d structure and drain work in nagar panchayat amethi distt lucknow up india
Investigation survey on gis basis and construction of 300 kld and 900 kld stp with 4 kld co &#x0d treatment 19 no leach pit each capacity 10 kld i and d structure and drain work in nagar &#x0d panchayat amethi distt lucknow up india
Read more2024-25 uzhavoor block panchayath-take a break- womens rest centre above km mani thanal waiting centre, kottayam district
2024-25 uzhavoor block panchayath-take a break- womens rest centre above km mani thanal waiting centre, kottayam district
Read moreProject no. 163/22- k.m mani thanal waiting centre- phase ii, uzhavoor block panchayath, kottayam
Project no. 163/22- k.m mani thanal waiting centre- phase ii, uzhavoor block panchayath, kottayam
Read moreProject no. 162/23- k.m mani thanal waiting centre- phase i, uzhavoor block panchayath, kottayam
Project no. 162/23- k.m mani thanal waiting centre- phase i, uzhavoor block panchayath, kottayam
Read moreProject no. 163/22- k.m mani thanal waiting centre- phase ii, uzhavoor block panchayath, kottayam
Project no. 163/22- k.m mani thanal waiting centre- phase ii, uzhavoor block panchayath, kottayam
Read moreProject no. 162/23- k.m mani thanal waiting centre phase i, uzhavoor block panchayath, kottayam
Project no. 162/23- k.m mani thanal waiting centre phase i, uzhavoor block panchayath, kottayam
Read moreOwn fund file no- 1276177/25 balance work she lodge completion-finishing work of she lodge (nivasam) -interlocking and landscaping
Own fund file no- 1276177/25 balance work she lodge completion-finishing work of she lodge (nivasam) -interlocking and landscaping
Read moreSetting up of basic facilities at health and wellness centre
Setting up of basic facilities at health and wellness centre
Read moreof your Industry type