Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Procurement Of 47.5 Kg Lpg Cylinders
|
| Description |
Procurement Of 47.5 Kg Lpg Cylinders
|
| Organisation | Hindustan Petroleum Corporation Limited | Public Sector Undertakings |
| Tender Id | 130400 |
|
Reference Number |
2400019263-HD-09050 |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | - |
| Place | MULTIPULE CITY |
| Link |
View Original Tender Notice
http://tenders.hpcl.co.in/tenders/tender_prog/Tenders_details.asp?id=130400 |
| Start Date | February 18, 2025 15:30 |
| End Date |
Expired
11/03/2025
Expired 579 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Supply of 20 no. sf6 gas cylinders, each of 50 kg gas capacity, for 400 kv gis along with buy back of 20 nos. empty cylinders at slbhes, srisailam dam west.
Supply of 20 no. sf6 gas cylinders, each of 50 kg gas capacity, for 400 kv gis along with buy back of 20 nos. empty cylinders at slbhes, srisailam dam west.
Read moreGeneral-statutory testing, reconditioning and certification of h2, co2 and n2 gas cylinders of ktpp stage-i
General-statutory testing, reconditioning and certification of h2, co2 and n2 gas cylinders of ktpp stage-i
Read moreTggenco-ktps-vii stage -sands- procurement of oxygen gas in tggenco company tested cylinders -quotation called for -regarding.
Tggenco-ktps-vii stage -sands- procurement of oxygen gas in tggenco company tested cylinders -quotation called for -regarding.
Read moreTesting and refilling of reference gas cylinders of various analyzers with calibrated reference gases at stpp, jaipur, mancherial, telangana
Testing and refilling of reference gas cylinders of various analyzers with calibrated reference gases at stpp, jaipur, mancherial, telangana
Read moreKtps-vii stage-chp-mm-charges for reconditioning of wagon tippler , side arm charger and stacker cum reclaimer hydraulic cylinders.
Ktps-vii stage-chp-mm-charges for reconditioning of wagon tippler , side arm charger and stacker cum reclaimer hydraulic cylinders.
Read moreTggenco - ktps vii stage - p31 - adm - s and s - supply and refilling of argon gas in tggenco cylinders of each capacity 7.0m3 - quotation called for - reg.
Tggenco - ktps vii stage - p31 - adm - s and s - supply and refilling of argon gas in tggenco cylinders of each capacity 7.0m3 - quotation called for - reg.
Read moreKtps vii stage- adm-ss-periodical testing ,painting ,repairs and reconditioning of 40nos argon gas cylinders in outdoor dtores-ii/ss division during the fy 2026-27
Ktps vii stage- adm-ss-periodical testing ,painting ,repairs and reconditioning of 40nos argon gas cylinders in outdoor dtores-ii/ss division during the fy 2026-27
Read moreFly wheel for transport air compressors model: 1hb4bisnt (kg khosla make) for dry ash handling plant of ktps-v stage
Fly wheel for transport air compressors model: 1hb4bisnt (kg khosla make) for dry ash handling plant of ktps-v stage
Read moreRefilling of carbon dioxide (co2) and nitrogen (n2) gases in the cylinders provided by stpp on value rate contract basis for a period of two years to stpp, jaipur, mancherial, telangana
Refilling of carbon dioxide (co2) and nitrogen (n2) gases in the cylinders provided by stpp on value rate contract basis for a period of two years to stpp, jaipur, mancherial, telangana
Read moreLiquid chlorine cylinders delivery, fixing and arresting of emergency chlorine gas leakages duly engaging 3 nos of 11 ton gvw cargo vehicles equipped with hydraulic crane to load, unload and transport the chlorine tonners along with skilled and semi skilled labour at various reservoirs chlroination destinations approx 300 nos under the distribution system of hmwssb for a period of two years under central chlorination cell qat wing.
Liquid chlorine cylinders delivery, fixing and arresting of emergency chlorine gas leakages duly engaging 3 nos of 11 ton gvw cargo vehicles equipped with hydraulic crane to load, unload and transport the chlorine tonners along with skilled and semi skilled labour at various reservoirs chlroination destinations approx 300 nos under the distribution system of hmwssb for a period of two years under central chlorination cell qat wing.
Read moreof your Industry type