Tender Details

About Tender

🚂 Construction Opportunity: Boundary Wall Projects For South Western Railway 🧱 The Ministry Of Railways, Specifically The South Western Railway Division, Is Seeking Contractors For The Construction Of Boundary Walls At Various Stations. 🛣️ 📍 Location: Hubli 📅 Deadline: May 27, 2024, 11:00 Am The Project Includes The Construction Of Boundary Walls Along The Track Approaches At Bntl & Majn Stations For A Total Length Of 2500 Meters Under Sw I, And At Ap & Ntw Stations For A Total Length Of 2200 Meters Under Sw Ii. Interested Contractors Must Submit An Earnest Money Deposit (Emd) Of Inr 347,800. 💵 For Detailed Tender Information, Please Refer To The Official Tender Document. Keywords: Construction, Boundary Wall, South Western Railway, Ministry Of Railways, Government Tender, Hubli, Infrastructure Project
Particulars Details
Title
Sw I: Aden/Sklr Sub Div: Construction Of Boundary Wall Along The Track Approaches Of Bntl &Amp Majn Stations For A Length Of 2500mtrs. Sw Ii: Aden/Mys Sub Div: Construction Of Boundary Wall Along The Track Approaches Of Ap &Amp Ntw Stations For A Length Of 2200mtrs.
Description
For Complete Deion And Other Details, Please Refer To Tender
Organisation Ministry of Railways | Central Govt. Ministry/Department
Tender Id 74785091
Reference
Number
08MYS24of03-05-24itemno2
Tender Fee 0
EMD 3.48 Lakh
Tender Value -
Place Hubli
Link
View Original Tender Notice

https://www.ireps.gov.in/ireps/works/pdfdocs/052024/74785091/viewNitPdf_4548386.pdf

Start Date May 03, 2024 18:26
End Date
Expired 27/05/2024

Expired 871 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Nad-kota section: improvement to track drainage system by provision of rcc drain along the track between alaniya-daddevi stations under the jurisdiction of aden-rma.

Nad-kota section: improvement to track drainage system by provision of rcc drain along the track between alaniya-daddevi stations under the jurisdiction of aden-rma.

Read more
Aden/sklr sub divn- re-guaging of track including renewal of worn out fastenings over curves and greasing of rails in curves with railways grease between sklr-sbhr stations for a period of two years

Aden/sklr sub divn- re-guaging of track including renewal of worn out fastenings over curves and greasing of rails in curves with railways grease between sklr-sbhr stations for a period of two years

Read more
Avc-kty section: reconstruction of existing retaining wall parallel to track at rob nos. 207, 208, 263, and 264, and provision of crash barriers on rob approaches at rob nos. 207, 208, 219, 233, 263, and 264 in aden/dvg sub-division.

Avc-kty section: reconstruction of existing retaining wall parallel to track at rob nos. 207, 208, 263, and 264, and provision of crash barriers on rob approaches at rob nos. 207, 208, 219, 233, 263, and 264 in aden/dvg sub-division.

Read more
Construction of foundation, substructure and superstructure of important bridge no. 18 comprising 4 x 30.5 m + 3 x 45.70 m + 2 x 30.50 m + 2 x 45.70 m + 4 x 30.50 m open web girder spans, including pile foundation and 800 m approaches, for single-line railway track conforming to rdso 25 t axle load standard and substructure designed for 32.5 t loading over river barakar between barakar and kumardubi stations from km 229/30 to km 230/16 (f/hwh), of eastern railway

Construction of foundation, substructure and superstructure of important bridge no. 18 comprising 4 x 30.5 m + 3 x 45.70 m + 2 x 30.50 m + 2 x 45.70 m + 4 x 30.50 m open web girder spans, including pile foundation and 800 m approaches, for single-line railway track conforming to rdso 25 t axle load standard and substructure designed for 32.5 t loading over river barakar between barakar and kumardubi stations from km 229/30 to km 230/16 (f/hwh), of eastern railway

Read more
Construction of foundation, substructure and superstructure of important bridge no. 18 comprising 4 x 30.5 m + 3 x 45.70 m + 2 x 30.50 m + 2 x 45.70 m + 4 x 30.50 m open web girder spans, including pile foundation and 800 m approaches, for single-line railway track conforming to rdso 25 t axle load standard and substructure designed for 32.5 t loading over river barakar between barakar and kumardubi stations from km 229/30 to km 230/16 (f/hwh), of eastern railway

Construction of foundation, substructure and superstructure of important bridge no. 18 comprising 4 x 30.5 m + 3 x 45.70 m + 2 x 30.50 m + 2 x 45.70 m + 4 x 30.50 m open web girder spans, including pile foundation and 800 m approaches, for single-line railway track conforming to rdso 25 t axle load standard and substructure designed for 32.5 t loading over river barakar between barakar and kumardubi stations from km 229/30 to km 230/16 (f/hwh), of eastern railway

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise