Tender Details

Particulars Details
Title
De Silting And Cleaning Of Clear Water Reservoir Of Capacity 2.50 Mgd Under Ph Ii Wtp Kalabgoor Section, Sd I, Kalabgoor, Td Ii, Patancheru (Reservation Earmarked For Schedule Castes) (As Per G.O.Ms.No.59 Dt: 21 05 2018)
Description
De Silting And Cleaning Of Clear Water Reservoir Of Capacity 2.50 Mgd Under Phase Ii Wtp Kalabgoor Section, Sd I, Kalabgoor, Transmission Division Ii, Patancheru (Reservation Earmarked For Schedule Castes) (As Per G.O.Ms.No.59, Dt: 21.05.2018)
Organisation Information Technology Electronics and Communication Department Telangana | State Govt. and UT
Tender Id 570541
Reference
Number
eTender Notice EP No.81/CGM (E)/TC/T1/TD-II/2024-25, dated:20.01.2025.
Tender Fee 360
EMD 10166
Tender Value
Place TS
Link http://eprocurement.telangana.gov.in/
Start Date January 20, 2025 22:30
End Date

27/01/2025 ( Expired 83 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Supply, delivery and laying of filter sand media,grit and pebbles including removing of old media grit ac pipes, plastering to internal walls, epoxy painting to the internal surfaces of the filter beds, relaying of new sand media , grit and pebbles with replacement of damaged top/bottom and side ms channels with new ms channels, replacement of lateral ac/cpvc etc., for filter beds nos. 1,2,3,4,5 and 9 plastering and water proofing to roof top of wtp building at ph-i, wtp rajampet,sd-i, td-ii

Supply, delivery and laying of filter sand media, grit and pebbles including removing of old media grit ac pipes, plastering to internal walls, epoxy painting to the internal surfaces of the filter beds, relaying of new sand media, grit and pebbles with replacement of damaged top/bottom and side ms channels with new ms channels, replacement of lateral ac/cpvc etc., for filter beds nos 1,2,3,4,5 and 9 plastering and water proofing to roof top of wtp building at phase-i, wtp rajampet under sub-division no.i, kalabgoor, transmission division no.ii, patancheru

Read more
De-silting and cleaning of clear water reservoir of capacity 0.3 mgd under ph-i wtp rajampet, sd-i, kalabgoor, td-ii, patancheru (reservation earmarked for schedule tribes) (as per g.o.ms.no.59 dt: 21-05-2018)

De-silting and cleaning of clear water reservoir of capacity 0.3 mgd under phase-i wtp rajampet section, sd-i, kalabgoor, transmission division ii, patancheru (reservation earmarked for schedule tribes) (as per g.o.ms.no.59, dt: 21.05.2018).

Read more
De-silting and cleaning of clear water reservoir of capacity 0.7 mgd under ph-ii wtp kalabgoor section, sd-i, kalabgoor, td-ii, patancheru (reservation earmarked for waddera) (as per g.o.ms.no.59 dt: 21-05-2018)

De-silting and cleaning of clear water reservoir of capacity 0.7 mgd under phase-ii wtp kalabgoor section, sd-i, kalabgoor, transmission division ii, patancheru (reservation earmarked for waddera) (as per g.o.ms.no.59, dt: 21.05.2018).

Read more
De-silting and cleaning of clear water reservoir of capacity 2.50 mgd under ph-ii wtp kalabgoor section, sd-i, kalabgoor, td-ii, patancheru (reservation earmarked for schedule castes) (as per g.o.ms.no.59 dt: 21-05-2018)

De-silting and cleaning of clear water reservoir of capacity 2.50 mgd under phase-ii wtp kalabgoor section, sd-i, kalabgoor, transmission division ii, patancheru (reservation earmarked for schedule castes) (as per g.o.ms.no.59, dt: 21.05.2018)

Read more
Hiring of shovel 0.85 cum 110 hp hitachi ex-200 for cleaning up the natural stream (garela vagu) passing to the peddapur campus upto erigepally bridge and also from phase-iii and iv over flow and sludge water drain to garela vagu for avoiding the backwater flow into the pump houses and filters and also for enabling the storm water to flow easily coming from the peddapur campus under peddapur section, sd-ii, peddapur, om division viii, patancheru (reservation earmarked for schedule castes)

Hiring of shovel 0.85 cum 110 hp hitachi ex-200 for cleaning up the natural stream (garela vagu) passing to the peddapur campus upto erigepally bridge and also from phase-iii and iv over flow and sludge water drain to garela vagu for avoiding the backwater flow into the pump houses and filters and also for enabling the storm water to flow easily coming from the peddapur campus under peddapur section, sub division no-ii, peddapur, o and m division no. viii, patancheru. (reservation earmarked for schedule castes) (as per g.o.ms.no.59, dt: 21.05.2018).

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise