Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Jjm Wss To Sreoolanagaram Kanjoor Chengamanad Nedumbasserry Parakkadavu Panchayaths Production Components Package Ii
|
Description |
Laying Of Clear Water Pumping Main From Chowara Wtp To Chengamanadu Ohsr And Construction Of Chengamanadu Ohsr
|
Organisation | Kerala Water Authority | State Govt. and UT |
Tender Id | 2024_KWA_683072_1 |
Reference Number |
27/2024-25/SE/PHC/MVPA |
Tender Fee | 19518 |
EMD | 5 Lakh |
Tender Value | |
Place | KWA, P H Circle,Muvattupuzha |
Link | https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1062747 |
Start Date | July 30, 2024 22:30 |
End Date |
13/08/2024 ( Expired 320 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Development of 4 lane ac greenfield regional expressway on northern side of hyderabad from reddipalle vill (dc. 33.000) to islampur vill (dc. 59.000) for a design length of 26.000 km in telangana under nh(o) on epc mode (package ii)
Development of 4 lane ac greenfield regional expressway on northern side of hyderabad from reddipalle vill (dc. 33.000) to islampur vill (dc. 59.000) for a design length of 26.000 km in telangana under nh(o) on epc mode (package ii)
Read moreIndependent engineer services during oandm period for four laning of rajauli - bakhtiyarpur section of nh - 31 (new nh-20) from km. 54.405 to km 101.630 (package - ii) and 101.630 to 152.520 (package iii) on ham mode in the state of bihar.
Independent engineer services during oandm period for four laning of rajauli - bakhtiyarpur section of nh - 31 (new nh-20) from km. 54.405 to km 101.630 (package - ii) and 101.630 to 152.520 (package iii) on ham mode in the state of bihar.
Read moreIe services during onm stage of 4laned divided carriageway from km.175(mh tg border) to km.308(armur)(package nos.ns-2/bot/ap-6,ap-7,ap-8) on nag hyd sec of nh44) in the state of telangana on bot (annuity) basis under ns corr (nhdp phase-ii)
Ie services during onm stage of 4laned divided carriageway from km.175(mh tg border) to km.308(armur)(package nos.ns-2/bot/ap-6,ap-7,ap-8) on nag hyd sec of nh44) in the state of telangana on bot (annuity) basis under ns corr (nhdp phase-ii)
Read moreBalance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Balance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Read moreIe services for construction of new six lane access controlled capital region ring road from rameswar (nh16) to gobindpur package ii from design ch. km. 40.700 to km. 70.995 in the state of odisha under nh(o) on hybrid annuity mode.
Ie services for construction of new six lane access controlled capital region ring road from rameswar (nh16) to gobindpur package ii from design ch. km. 40.700 to km. 70.995 in the state of odisha under nh(o) on hybrid annuity mode.
Read moreConstruction of new six lane access controlled capital region ring road from rameswar (nh16) to gobindpur package ii from design ch. km. 40.700 to km. 70.995 in the state of odisha under nh(o) on hybrid annuity mode
Construction of new six lane access controlled capital region ring road from rameswar (nh16) to gobindpur package ii from design ch. km. 40.700 to km. 70.995 in the state of odisha under nh(o) on hybrid annuity mode
Read moreO and m of wtp, irp, gwtp etc. of uws/jjm with in dws division dharmanagar 2025-26/sh- providing of bis certification marked alumino ferric in/c loading, carrying to wtp, irp, gwtp unloading, stacking at site of dws sub-division dharmanagar / gr-ii
O and m of wtp, irp, gwtp etc. of uws/jjm with in dws division dharmanagar 2025-26/sh- providing of bis certification marked alumino ferric in/c loading, carrying to wtp, irp, gwtp unloading, stacking at site of dws sub-division dharmanagar / gr-ii
Read morePackage-i civil and hydro-mechanical works of di tunnels pertaining to tato-ii hydro electric project (700 mw), arunachal pradesh
Package-i civil and hydro-mechanical works of di tunnels pertaining to tato-ii hydro electric project (700 mw), arunachal pradesh
Read moreVellore district providing paver block at perumbadi (from perumal house to chinnathambi house) in perumbadi panchayat of gudiyatham block agamt ii 2024-25 package no 03
Vellore district providing paver block at perumbadi (from perumal house to chinnathambi house) in perumbadi panchayat of gudiyatham block agamt ii 2024-25 package no 03&#x0d
Read morePre bid tie up for transmission line package tl02 for 765 kv vindhyachal pool - prayagraj d/c line -part-ii associated with inter-regional (nr-wr) transmission system strengthening to relieve the loading of 765 kv vindhyachal-varanasi d/c line under tbcb route.
Pre bid tie up for transmission line package tl02 for 765 kv vindhyachal pool - prayagraj d/c line -part-ii associated with inter-regional (nr-wr) transmission system strengthening to relieve the loading of 765 kv vindhyachal-varanasi d/c line under tbcb route.
Read moreof your Industry type