Tender Details
Particulars | Details |
---|---|
Title |
Horizontal Heavy Duty Slurry Pump 2 X 1.5,Horizontal Heavy Duty Slurry Pump 3 X 2,Horizontal Heavy
|
Description |
|
Organisation | Department of Atomic Energy | PMO |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | |
EMD | |
Tender Value | 2 Crore |
Place | |
Link |
AAAAAAAAAA Login to view |
Start Date | May 27, 2025 22:00 |
End Date |
17/06/2025 ( 19 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Procurement of oil cooler for ash slurry pump for ahd gadarwara
Procurement of oil cooler for ash slurry pump for ahd gadarwara
Read moreRectification work of 3 wss under package-2 to kadanad gramapanchayathin kottayamdistrict
Rectification work of 3 wss under package-2 to kadanad gramapanchayathin kottayamdistrict
Read moreNew connectivity of road from 1. l424-coloni-1 to boro kangrai, l- 2.637 km , package- tr0315-p4 , block- dasda. 2. l422-shaliram para and aniram para, l- 2.662 km, package- tr0322-p4 , block- dasda. 3. l426-sailaram and daranimohan para, l- 1.205 k
Pm-janman works
Read more(i) cont. of h.l. bridge with approach road over chas nala at 5th km of dhanbad-pathardih-sindri road (2 x 14.6m and (ii) cont. of h.l. bridge with approach road over chas nala at 7th km of dps road (1 x 14.6m) under plan head for the year 2025-26.
(i) cont. of h.l. bridge with approach road over chas nala at 5th km of dhanbad-pathardih-sindri road (2 x 14.6m and (ii) cont. of h.l. bridge with approach road over chas nala at 7th km of dps road (1 x 14.6m) under plan head for the year 2025-26.
Read moreUpgradation of muktsar-abohar road via panniwala (mktodr-32) rd 0.00-19.20, 28.00-37.70 equal to 28.90 km including maintenance of road for 3 year (1 year defect liability period plus 2 year maintenance period)
Upgradation of muktsar-abohar road via panniwala (mktodr-32) rd 0.00-19.20, 28.00-37.70 equal to 28.90 km including maintenance of road for 3 year (1 year defect liability period plus 2 year maintenance period)
Read moreAs per attached eoi documents 1,as per attached eoi documents 2,as per attached eoi documents 3,as
Read more
Overhauling of hp, lp valves, nrvs, actuators, l.p.and h.p. heaters, ejectors, drain coolers and toc and 4-way,2-way valves of unit no.-3 of 3x210 mw, atps, anpara
Overhauling of hp, lp valves, nrvs, actuators, l.p.and h.p. heaters, ejectors, drain coolers and toc and 4-way,2-way valves of unit no.-3 of 3x210 mw, atps, anpara
Read moreof your Industry type