Tender Details
Particulars | Details |
---|---|
Title |
Strengthening Of Nh 67 From Km 740/150 To 742/195 And Km 743/005 To Km 749/850 Of Nh 67 In Sps Nellore District In The State Of Andhra Pradesh For The Year 2024 25 On Epc Mode
|
Description |
Strengthening Of Nh 67 From Km 740/150 To 742/195 And Km 743/005 To Km 749/850 Of Nh 67 In Sps Nellore District In The State Of Andhra Pradesh For The Year 2024 25 On Epc Mode
|
Organisation | Ministry of Road Transport and Highways | Central Govt. Ministry/Department |
Tender Id | 2025_MoRTH_846660_1 |
Reference Number |
SENHVJA/22/2024-25 Dated.28.01.2025 |
Tender Fee | 11800 |
EMD | 13.75 Lakh |
Tender Value | |
Place | Andhra Pradesh |
Link | https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=890004 |
Start Date | January 30, 2025 22:30 |
End Date |
17/03/2025 ( Expired 64 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreConst. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Read moreConstruction of rob with approaches in lieu of railway crossing lc 20 on nh 161h at km 24.913 in the state of maharashtra on epc mode
Construction of rob with approaches in lieu of railway crossing lc 20 on nh 161h at km 24.913 in the state of maharashtra on epc mode
Read moreReconstruction of distressed minor bridge over dhari jhora at km 617.945 of nh-31 -new nh-17 under nh division ix in the district of jalpaiguri, west bengal on epc mode job-568.
Reconstruction of distressed minor bridge over dhari jhora at km 617.945 of nh-31 -new nh-17 under nh division ix in the district of jalpaiguri, west bengal on epc mode job-568.
Read moreDevelopment of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Read moreConstruction of limited height subway (lhs)/rub near proposed at km 503/0-1 (lc no-85) on nh-89 (ajmer nagaur section) in the state of rajasthan on epc mode
Construction of limited height subway (lhs)/rub near proposed at km 503/0-1 (lc no-85) on nh-89 (ajmer nagaur section) in the state of rajasthan on epc mode
Read moreStrengthening/ overlaying of the existing bituminous surface in thanjavur - trichy section from km 128.480 to km 136.490 of nh-83 (nh-67) in the state of tamil nadu on item rate (percentage) basis
Strengthening/ overlaying of the existing bituminous surface in thanjavur - trichy section from km 128.480 to km 136.490 of nh-83 (nh-67) in the state of tamil nadu on item rate (percentage) basis
Read moreConsultancy services for authoritys engineer for supervision of construction of four lane of chausa_buxar bypass from km 45.000 to km 65.915 (package 2) of nh 319a in the state of bihar on epc mode.
Consultancy services for authoritys engineer for supervision of construction of four lane of chausa_buxar bypass from km 45.000 to km 65.915 (package 2) of nh 319a in the state of bihar on epc mode.
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Read moreRectification of blackspot through long term measures by construction of 3-lane unidirectional vup with service road near roladungri at km 326.570 (black spot id gj-02-129) on nh-48 in the state of gujarat on epc mode
Rectification of blackspot through long term measures by construction of 3-lane unidirectional vup with service road near roladungri at km 326.570 (black spot id gj-02-129) on nh-48 in the state of gujarat on epc mode
Read moreof your Industry type