Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Supply Of Stuffing Box For Ball Tube Mills 4772 For Unit 9 And 10 Of Ktps V Stage
|
| Description |
Supply Of Stuffing Box For Ball Tube Mills 4772 For Unit 9 And 10 Of Ktps V Stage
|
| Organisation | TELANGANA POWER GENERATION CORPORATION LIMITED-CE KTPS V & VI STAGE |
| Tender Id | Login to view |
|
Reference Number |
Login to view |
| Tender Fee | - |
| EMD | - |
| Tender Value | 0 |
| Place | Telangana |
| Link | Login to view |
| Start Date | August 29, 2026 19:00 |
| End Date |
Open
23/10/2026
12 days left |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Supply of screw conveyor assemblies for ball tube mills bbd 4772 in unit-9 and 10
Supply of screw conveyor assemblies for ball tube mills bbd 4772 in unit-9 and 10
Read moreSupply of transition piece in feed pipe for ball tube mills bbd 4772 in unit-9 and 10
Supply of transition piece in feed pipe for ball tube mills bbd 4772 in unit-9 and 10
Read moreRefrigerant r-22 gas for a.c system for ktps-v stage
Refrigerant r-22 gas for a.c system for ktps-v stage
Read moreSpares for silo vent fan in dry ash handling plant ktps- v stage
Spares for silo vent fan in dry ash handling plant ktps- v stage
Read moreCeramic fluidizing pads for dry fly ash handling plant of ktps-v stage
Ceramic fluidizing pads for dry fly ash handling plant of ktps-v stage
Read moreSupply of bearings for esp actuators aphs of unit-ix and for mrgb for ball tube mills bbd 4772
Supply of bearings for esp actuators aphs of unit-ix and for mrgb for ball tube mills bbd 4772
Read moreKtps-v stage- bm- provide skilled labor, specifically ibr welders and grinders, to replace the boiler tubes in unit-x of the ktps-v stage during the annual overhaul period for the year 2026-27-reg
Ktps-v stage- bm- provide skilled labor, specifically ibr welders and grinders, to replace the boiler tubes in unit-x of the ktps-v stage during the annual overhaul period for the year 2026-27-reg
Read moreSpares suitable for aira/marck make actuator operated 50nb ball valves for air lock vessels in ash handling system, ktps-vi stage
Spares suitable for aira/marck make actuator operated 50nb ball valves for air lock vessels in ash handling system, ktps-vi stage
Read moreFly wheel for transport air compressors model: 1hb4bisnt (kg khosla make) for dry ash handling plant of ktps-v stage
Fly wheel for transport air compressors model: 1hb4bisnt (kg khosla make) for dry ash handling plant of ktps-v stage
Read moreManufacture and supply of 600mt of hi-chrome grinding media balls of sizes 50mm and 40mm for ktps-v stage
Manufacture and supply of 600mt of hi-chrome grinding media balls of sizes 50mm and 40mm for ktps-v stage
Read moreof your Industry type