Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Permanent Restoration Works To Sriramankulam Tank Bund Of Muthoor Village In Palayamkottai Taluk Of Tirunelveli District.
|
Description |
Permanent Restoration Works To Sriramankulam Tank Bund Of Muthoor Village In Palayamkottai Taluk Of Tirunelveli District.
|
Organisation | Engineer-in-Chief and Chief Engineer (General) WRD Chennai | State Govt. and UT |
Tender Id | 2024_WRD_420268_1 |
Reference Number |
5SE/TBC/TNY/2023-2024(10) |
Tender Fee | 0 |
EMD | 54000 |
Tender Value | |
Place | Tirunelveli District |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=505477 |
Start Date | February 15, 2024 14:30 |
End Date |
21/02/2024 ( Expired 499 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of overhead tanks, water distribution network and metering for safe drinking water with house to house connections covering 36 mouzas in nandigram-i and ii blocks of purba medinipur- wbdwsip/dww/em/03/2025-26
Construction of overhead tanks, water distribution network and metering for safe drinking water with house to house connections covering 36 mouzas in nandigram-i and ii block of purba medinipur district with 2 yrs. o and m wbdwsip/dww/em/03/2025-26
Read moreBalance works of rehabilitation and upgradation of nh-43 (new nh-30) from km 162.120 to km 173.500 length 11.380 km. (keshkal bypass) 4-lane with paved shoulder in the state of chhattisgarh under nhdp-iv through epc.
Balance works of rehabilitation and upgradation of nh-43 (new nh-30) from km 162.120 to km 173.500 length 11.380 km. (keshkal bypass) 4-lane with paved shoulder in the state of chhattisgarh under nhdp-iv through epc.
Read moreConstruction of road kibithu kundao from km 0.000 to km 52.000 design length 0.000 to 19.557 kms green field alignment to nhsl specifications under project udayak in anjaw district of arunachal pradesh state on epc mode
Construction of road kibithu kundao from km 0.000 to km 52.000
 design length 0.000 to 19.557 kms green field alignment to nhsl
 specifications under project udayak in anjaw district of arunachal
 pradesh state on epc mode
Read moreDevelopment, operation and maintenance of the multi modal logistics park (mmlp) hyderabad at parkibanda village in manoharabad mandal of medak district, in the state of telangana through public private partnership on dbfot basis
Development, operation and maintenance of the multi modal logistics park (mmlp) hyderabad at parkibanda village in manoharabad mandal of medak district, in the state of telangana through public private partnership on dbfot basis
Read moreDevelopment operation and maintenance of the mmlp pune at village pawalewadi maval taluka district pune in maharashtra through ppp on dbfot basis
Development operation and maintenance of the mmlp pune at village pawalewadi maval taluka district pune in maharashtra through ppp on dbfot basis
Read more1.civil works for creating storage facility to stack cable material,other electrical materials in between 132kv switchyard and mtdd lab and floor repairing 2.closing the chambers at corridor area of old building at ipr campus,bhat, gandhinagar382428
1.civil works for creating storage facility to stack cable material,other electrical materials in between 132kv switchyard and mtdd lab and floor repairing 2.closing the chambers at corridor area of old building at ipr campus,bhat, gandhinagar382428
Read moreWidening re construction to four lane from km 0.000 to km 15.870 near miriyan telangana karnataka border chincholi section of nh 167n in kalaburagi district in the state of karnataka on ham under annual plan 2023 24
Widening re construction to four lane from km 0.000 to km 15.870 near miriyan telangana karnataka border chincholi section of nh 167n in kalaburagi district in the state of karnataka on ham under annual plan 2023 24
Read moreShort term maintenance contract work for ch- 46.220km to 72.00 km of nh-727h in district sitapur in the state of uttar pradesh
Short term maintenance contract work for ch- 46.220km to 72.00 km of nh-727h in district sitapur in the state of uttar pradesh
Read moreShort term maintenance contract work for ch-38.853km to 40.00km of nh-330d in district sitapur in state of uttar pradesh.
Short term maintenance contract work for ch-38.853km to 40.00km of nh-330d in district sitapur in state of uttar pradesh.
Read moreConstruction of two lane with paved shoulder from design km 45.325 (ex km 48.870) near basinda village to design km 90.010 (ex km 97.903) near roshni village section of nh-347b of betul-khandwa package-2 in the state of madhya on ham
Construction of two lane with paved shoulder from design km 45.325 (ex km 48.870) near basinda village to design km 90.010 (ex km 97.903) near roshni village section of nh-347b of betul-khandwa package-2 in the state of madhya on ham
Read moreof your Industry type