Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
22/2025 26/Ee I/Ae I/Shimla
|
Description |
Supply, Installation, Testing Commissioning Of Sewage Treatment Plant (Stp) Based On Sequential Batch Reactor (Sbr) Technology Of 25 Kld Capacity Including Allied Work Of Gpra At Prospect Hill, Shmla (H.P.). Sh: Operation Maintenance Of Sewage Treatment Plant (Stp).
|
Organisation | Central Public Works Department (CPWD) | Central Govt. Ministry/Department |
Tender Id | 111115 |
Reference Number |
22/2025-26/EE-I/AE-I/Shimla |
Tender Fee | 0 |
EMD | 10688 |
Tender Value | |
Place | |
Link | https://etender.cpwd.gov.in/cppcpwdtenderview.html?tid=637077642463707764243131313131352432322f323032352d32362f45452d492f41452d492f5368696d6c61 |
Start Date | May 02, 2025 19:22 |
End Date |
09/05/2025 ( Expired 47 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Survey design supply construction erection and commissioning of 1 no sewage treatment plant stp cum etp based on mbr technology of capacity 125 kld with oandm of 5 years in tb sanatorium amritsar
Survey design supply construction erection and commissioning of 1 no sewage treatment plant stp cum etp based on mbr technology of capacity 125 kld with oandm of 5 years in tb sanatorium amritsar
Read moreInstallation of faecal sludge and treatment plant of 10 kld capacity based on bio digester aided constructed wetland (bac) technology at karimpur-ii block, nadia
Installation of faecal sludge and treatment plant of 10 kld capacity based on bio digester aided constructed wetland (bac) technology at karimpur-ii block, nadia
Read moreInstallation of faecal sludge and treatment plant of 6 kld capacity based on bio digester aided constructed wetland (bac) technology at nabadwip block, nadia
Installation of faecal sludge and treatment plant of 6 kld capacity based on bio digester aided constructed wetland (bac) technology at nabadwip block, nadia
Read moreConstruction and installation of advanced fstp of 6 kld capacity based on bac fstp on a dbot model with 5 years operation and maintenance (oandm) at gopalpur g.p under kanksa development block in the district of paschim bardhaman
Construction and installation of advanced fstp of 6 kld capacity based on bac fstp on a dbot model with 5&#x0d years operation and maintenance (oandm) at gopalpur g.p under kanksa development block in the district of&#x0d paschim bardhaman
Read moreDesign, supply, installation, testing and commissioning including 5 years operation and maintenance of grid connected rooftop and ground mounted solar photovoltaic power plants of capacity 50kwp and 175kwp, based on ies-bis certified monoperc solar
Design, supply, installation, testing and commissioning including 5 years operation and maintenance of grid connected rooftop and ground mounted solar photovoltaic power plants of capacity 50kwp and 175kwp, based on ies-bis certified monoperc solar
Read moreEng. pro. const. and comm. epc and performance followed by o and m of stp of 40 mld capacity based on sequential batch reactor sbr technology near chandlai lake for bambala area, sanganer sewerage work under ee phe i jda jaipur
Eng. pro. const. and comm. epc and performance followed by o and m of stp of 40 mld capacity based on sequential batch reactor sbr technology near chandlai lake for bambala area, sanganer sewerage work under ee phe i jda jaipur
Read moreOperation and maintenance work of 02 mld sewage treatment plant based on mbbr technology for 5 years at bakh almora
Operation and maintenance work of 02 mld sewage treatment plant based on mbbr technology for 5 years at bakh almora
Read moreSstpp khandwa- proposal for installation of effluent treatment plant (etp) of 10 kld capacity including drawing, design, supply, construction, commissioning along with total four years of operation and maintenance (one year free and three years ....
Sstpp khandwa- proposal for installation of effluent treatment plant (etp) of 10 kld capacity including drawing, design, supply, construction, commissioning along with total four years of operation and maintenance (one year free and three years ....
Read moreSurvey site investigationdetailed design construction procurement and installation of required machinery equipment and instruments testing commissioning o and m of 10 years of 5 mld capacity zld based cetp at kalibeti khurdha on turnkey basis
Survey site investigationdetailed design construction procurement and installation of required machinery equipment and instruments testing commissioning o and m of 10 years of 5 mld capacity zld based cetp at kalibeti khurdha on turnkey basis
Read moreDesigning, installation, commissioning and operation of 105 kld stp and 55 kld etp at kpd (including removal of existing plant) asreplacement work.
Designing, installation, commissioning and operation of 105 kld stp and 55 kld etp at kpd (including removal of existing plant) asreplacement work.
Read moreof your Industry type