Tender Details
Particulars | Details |
---|---|
Title |
Restoration Of Temporary Di Channel Of Nogli Power House(2.5 Mw) Intake Rd204 To 234 Meter Damaged Due To Heavy Rain / Flood In Nogli Khad During 07/2023 Under Ganvi Power House Division Jeori.
|
Description |
Restoration Of Temporary Di&Amp#X0d
Channel Of Nogli Power House(2.5&Amp#X0d
Mw) Intake Rd204 To 234 Meter&Amp#X0d
Damaged Due To Heavy Rain / Flood In&Amp#X0d
Nogli Khad During 07/2023 Under Ganvi&Amp#X0d
Power House Division Jeori.
|
Organisation | HPSEBL | State Govt. and UT |
Tender Id | 2024_HPSEB_85260_1 |
Reference Number |
HPSEBL/GPHD/DB-9/2023-24-119 |
Tender Fee | 590 |
EMD | 9980 |
Tender Value | |
Place | Nogli |
Link | https://hptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=126828 |
Start Date | February 06, 2024 23:30 |
End Date |
13/02/2024 ( Expired 482 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
07/2025-26/edcr replacement of 33 kv, 11 kv, l.t. lines, transformers of different capacity etc. damaged due to heavy rain and storm (devia apda) during upcoming summer season for the year 2025-26 under the jurisdiction of edd-bilaspur, rampur
07/2025-26/edcr replacement of 33 kv, 11 kv, l.t. lines, transformers of different capacity etc. damaged due to heavy rain and storm (devia apda) during upcoming summer season for the year 2025-26 under the jurisdiction of edd-bilaspur, rampur
Read moreTender for permanent restoration repair of temporary restored 63 kva lwss sanyari tepra and 25 kva hrt pump sstn damaged due to heavy strom /ain fall on dated 17/04/2025 in e section bhrarighat, under electrical sub-division, hpsebl, dralaghat
Tender for permanent restoration repair of temporary restored 63 kva lwss sanyari tepra and 25 kva hrt pump sstn damaged due to heavy strom /ain fall on dated 17/04/2025 in e section bhrarighat, under electrical sub-division, hpsebl, dralaghat
Read moreHpsebl/ceg/sec/24-25-9
Restoration of di weir damaged due to flash flood at intake of rongtong hep (2.00 mw) under civil mtc division bhabanagar.
Read moreTemporary di of water of nogli khad into power house water conductor system (open channel) w.e.f. 01.04.2025 to 31.07.2025.(122 days).
Temporary di of water of nogli khad into power house water conductor system (open channel) w.e.f. 01.04.2025 to 31.07.2025.(122 days).
Read moreRestoration of approach road to switchyard from outfall of trc to upstream ganvi-ii power house rd 60.00 to 70.00 m damaged due to heavy flood in ganvi khad on intervening night of 31.07.2024 and 01.08.2024 under ganvi power house division jeori
Restoration of approach road to switchyard from outfall of trc to upstream ganvi-ii power house rd 60.00 to 70.00 m damaged due to heavy flood in ganvi khad on intervening night of 31.07.2024 and 01.08.2024 under ganvi power house division jeori
Read moreRestoration of wire crates/stone masonary/pannel fencing left side of ganvi khad from entry gate to trc outfall of ganvi stage-ii rd 25.00 to 50.00 m hich was damaged due to heavy flood in ganvi khad on intervening night of 31.07.2024 and 01.08.202
Restoration of wire crates/stone masonary/pannel fencing left side of ganvi khad from entry gate to trc outfall of ganvi stage-ii rd 25.00 to 50.00 m hich was damaged due to heavy flood in ganvi khad on intervening night of 31.07.2024 and 01.08.202
Read moreRestoration of wire crates/stone masonary/pannel fencing left side of ganvi khad from entry gate to trc outfall of ganvi stage-ii rd 0.00 to 25.00 m which was damaged due to heavy flood in ganvi khad on intervening night of 31.07.2024 and 01.08.202
Restoration of wire crates/stone masonary/pannel fencing left side of ganvi khad from entry gate to trc outfall of ganvi stage-ii rd 0.00 to 25.00 m which was damaged due to heavy flood in ganvi khad on intervening night of 31.07.2024 and 01.08.202
Read moreRepair/overhauling of trench weir gate and power channel gate damaged due to heavy flood in ganvi khad on the intervening night of 31.07.2024 and 01.08.2024
Repair/overhauling of trench weir gate and power channel gate damaged due to heavy flood in ganvi khad on the intervening night of 31.07.2024 and 01.08.2024
Read moreRestoration of approach road to switchyard from outfall of trc to upstream ganvi-ii power house rd 45.00 to 60.00 m damaged due to heavy flood in ganvi khad on intervening night of 31.07.2024 and 01.08.2024 under ganvi power house division jeori
Restoration of approach road to switchyard from outfall of trc to upstream ganvi-ii power house rd 45.00 to 60.00 m damaged due to heavy flood in ganvi khad on intervening night of 31.07.2024 and 01.08.2024 under ganvi power house division jeori
Read moreRestoration of approach road to ganvi-l power house/prtection of switchyard by providing cement concrete wall/stone pitching left bank of ganvi khad downstream of bailey bridge between rd 190.00m to 210.00m which was damaged due to heavy flood in gan
Restoration of approach road to ganvi-l power house/prtection of switchyard by providing cement concrete wall/stone pitching left bank of ganvi khad downstream of bailey bridge between rd 190.00m to 210.00m which was damaged due to heavy flood in gan
Read moreof your Industry type