Tender Details
Particulars | Details |
---|---|
Title |
44/Ccm/Pta/2024 25 Dated 23.04.2025
|
Description |
Work Of Supply, Installation, Testing And&Amp#X0d
Commissioning Of H V A C System For Ultra Modern Multi Storey Office Building For Various Offices At 33&Amp#X0d
Kv Power Colony, Sohian Road, Sangrurr
|
Organisation | Department of Power | State Govt. and UT |
Tender Id | 2025_POWER_139395_1 |
Reference Number |
44/CCM/PTA/2024-25 |
Tender Fee | 8260 |
EMD | 3.66 Lakh |
Tender Value | |
Place | Sangrurr |
Link | https://eproc.punjab.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=281926 |
Start Date | April 30, 2025 23:30 |
End Date |
14/05/2025 ( Expired 26 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Supply installation commissioning and testing of 4 tph fully automatic rice mill machinery
Supply installation commissioning and testing of 4 tph fully automatic rice &#x0d mill machinery
Read moreConstruction of 132/33 kv, 2x50 mva gis substation at hathi bhata (ajmer) alongwith associated transmission lines including survey, supply of all equipment/mate rials, erection (including civil works), testing and commissioning.
Construction of&#x0d 132/33 kv, 2x50 mva&#x0d gis substation at&#x0d hathi bhata&#x0d (ajmer)&#x0d alongwith&#x0d associated&#x0d transmission&#x0d lines including&#x0d survey, supply&#x0d of all&#x0d equipment/mate&#x0d rials, erection&#x0d (including civil&#x0d works), testing&#x0d and&#x0d commissioning.
Read moreSupply, installation and commissioning of lhs cable along with accessories and integration with existing fire alarm system for chp
Supply, installation and commissioning of lhs cable along with accessories and integration with existing fire alarm system for chp conveyor belt area under capex 2024-25.&#x0d
Read moreWork of supply, erection, testing and commissioning of 110kv potential transformer for 110kv bus at 220/110/33/11kv tivim substation.
Work of supply, erection, testing and commissioning of 110kv potential transformer for 110kv bus at 220/110/33/11kv tivim substation.&#x0d
Read moreSupply, installation, testing, commissioning of hospital laundy equipment on turnkey basis with 02 years comprehensive warranty on buy-back basis and operation of laundry services for a period of 10 years at aiims, new delhi
Tender for supply, installation, testing, and
 commissioning of hospital laundry equipment on
 turnkey basis with 02 years comprehensive
 warranty on buy-back basis and operation of
 laundry services for a period of 10 years at aiims.
Read moreSupply, installation, integration, testing and commissioning of passenger feedback software
The scope of the work is supply, installation, integration, testing and commissioning of&#x0d passenger feedback software.
Read moreSupply of c type hammered wedge connectors for use in system operation chennai
Supply of &#x0d c type hammered wedge connectors for use in system operation chennai region
Read moreEoi for design, survey, supply, installation, testing, commissioning, operation n maintenance for 25 years from cod for 60 nos. grid connected solar power plants under pm-kusum scheme component a
Eoi for design, survey, supply, installation, testing, commissioning, operation n maintenance for 25 years from cod for 60 nos. grid connected solar power plants under pm-kusum scheme component a&#x0d
Read moreDesign, supply, installation, testing and commissioning of 25 kv overhead equipment (ohe) for elevated corridor of line-10 (saket g block to sangam vihar) and line-5 ext. (inderlok and ashok park main station) of delhi metro mrts phase-iv.
Design, supply, installation, testing and commissioning of 25 kv overhead equipment (ohe) for elevated corridor of line-10 (saket g block to sangam vihar) and line-5 ext. (inderlok and ashok park main station) of delhi metro mrts phase-iv.
Read moreSupply, installation, testing and commissioning of flowmeters for measurement of water discharge in all three turbines at kulhal powerhouse
Supply, installation, testing and commissioning of flowmeters &#x0d for measurement of water discharge in all three turbines at &#x0d kulhal powerhouse
Read moreof your Industry type