Tender Details
Particulars | Details |
---|---|
Title |
Repairing Of Both Side Idler Shaft Fitting, One Nos. Serviceable Idler Shaft Taking Out, Broken Bolt Opening 06 Nos. Of Transmission Guard And Fabrication With Fitment Of Transmission And Front Tilt Guard Of Beml Bd355 Dozer Sl. No. 11902 Of Konar Ex
|
Description |
Repairing Of Both Side Idler Shaft Fitting, One Nos. Serviceable Idler Shaft Taking Out, Broken Bolt Opening 06 Nos. Of Transmission Guard And Fabrication With Fitment Of Transmission And Front Tilt Guard Of Beml Bd355 Dozer Sl. No. 11902 Of Konar
|
Organisation | Central Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_CCL_324547_1 |
Reference Number |
AKKOCP/PE (X)/E-Tender/2024-25/69(A) |
Tender Fee | 0 |
EMD | 3800 |
Tender Value | |
Place | AKK OCP |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=336419 |
Start Date | December 31, 2024 14:30 |
End Date |
10/01/2025 ( Expired 102 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Repairing of damaged canopy, repairing of transmission guard, 02 nos. steel tubes, repairing of silencer assy. and transmission line delivery tube, fabrication of engine stand and repairing of propeller shaft of 60 ton beml dumper, sl. no. - 60787
Repairing of damaged canopy, repairing of transmission guard, 02 nos. steel tubes, repairing of silencer assy. and transmission line delivery tube, fabrication of engine stand and repairing of propeller shaft of 60 ton beml dumper, sl. no. - 60787
Read moreFollowing repairing is to be done in dozer sd32w sl.no.- 104841t-3279.(i)repairing of yoke shaft and yoke broken portion gauging, welding, opening and fitting both side (lhsand rhs).
Following repairing is to be done in dozer sd32w sl.no.- 104841t-3279.(i)repairing of yoke shaft and yoke broken portion gauging, welding, opening and fitting both side (lhsand rhs).
 (ii)repairing of broken and damaged 02 nos. blade arm dismantling
Read moreRepairing of lhs and rhs brake drum replacement from serviceable assly, removing blade stabilizer rod broken bolt material filling and fitting new bolt 4 nos. as per size with welding supporting plate of dozer 11971 of akkocp.
Repairing of lhs and rhs brake drum replacement from serviceable assly, removing blade stabilizer rod broken bolt material filling and fitting new bolt 4 nos. as per size with welding supporting plate of dozer 11971 of akkocp.
Read moreRepairing broken idler yoke shaft (lh and rh), track frame lhs and rhs, radiator grill and engine bottom guard and main arm mounting bracket both side of bd155 dozer sl. no. 13721, cil no. t 3836.
Sdocm/pe(x)/e-tender/24-25/30repairing broken idler yoke shaft (lh and rh), track frame lhs and rhs, radiator grill and engine bottom guard and main arm mounting bracket both side of bd155 dozer sl. no. 13721, cil no. t 3836.
Read moreRepairing of both side brace assly, head cap hole making, 03 broken bolt remove thread making, cap and bushing fitment both side idler shaft broken pieces welding machining track chain cutting fitting welding of dozer-11971 in r/o akkocp
Repairing of both side brace assly, head cap hole making, 03 broken bolt remove thread making, cap and bushing fitment both side idler shaft broken pieces welding machining track chain cutting fitting welding of dozer-11971 in r/o akkocp
Read moreRepairing of 08 nos. failed track chain pad cutting and serviceable chain pad fitting and fabrication of base plate and platform p.t.o main prop. shaft pulley broken bolts removal and tapping in recp drill sl. no. 817 at bansdeopur ocp, sijua area
Repairing of 08 nos. failed track chain pad cutting and serviceable
 chain pad fitting and fabrication of base plate and platform p.t.o main prop. shaft pulley
 broken bolts removal and tapping in recp drill sl. no. 817 at bansdeopur ocp, sijua area
Read moreRepairing of idler dismantling and fitting serviceable after repairing, removing of 18 of bolts rethreading transmission guard and tilt cylinder jack cover making and fitting of bd-355 dozer sl. no. t-11723 deployed at kathara colliery.
Repairing of idler dismantling and fitting serviceable after repairing, removing of 18 of bolts rethreading transmission guard and tilt cylinder jack cover making and fitting of bd-355 dozer sl. no. t-11723 deployed at kathara colliery.
Read more1.(a) repairing of 06 nos. pull down and pull up sprocket pin and gm bushes 06 nos. (b) repairing of drive shaft cross changing 02 nos. and guard fabrication and fitting (c) repairing of broken rear axle assembly of sl. no.6021401/rdc- 1289 and c-650
1.(a) repairing of 06 nos. pull down and pull up sprocket pin and gm bushes 06 nos. (b) repairing of drive shaft cross changing 02 nos. and guard fabrication and fitting (c) repairing of broken rear axle assembly of sl. no.6021401/rdc- 1289 and c-650
Read moreRepairing/replacement work of old and serviceable under carriage and rep. of broken idler yoke shaft (lh and rh), rep. of main arm mounting bracket both side and cylinder stay assy. and chassis upper portion of dozer sl. no. 13589, cil no. t 3662
Repairing/replacement work of old and serviceable under carriage and rep. of broken idler yoke shaft (lh and rh), rep. of main arm mounting bracket both side and cylinder stay assy. and chassis upper portion of dozer sl. no. 13589, cil no. t 3662
Read moreRepairing of both side idler shaft fitting, one nos. serviceable idler shaft taking out, broken bolt opening 06 nos. of transmission guard and fabrication with fitment of transmission and front tilt guard of beml bd355 dozer sl. no. 11902 of konar ex
Repairing of both side idler shaft fitting, one nos. serviceable idler shaft taking out, broken bolt opening 06 nos. of transmission guard and fabrication with fitment of transmission and front tilt guard of beml bd355 dozer sl. no. 11902 of konar
Read moreof your Industry type