Tender Details

Particulars Details
Title
Annual Maintenance Contract Of 19 Nos Air Conditioners And Stabilizers (/Split, 1.5 /2 Ton) Mounted In Different Location In Office Premises, Control Room And All Road/Rly. Wb Under Chp Cpp/Ppr For The Period Of 01 Year.
Description
Annual Maintenance Contract Of 19 Nos Air Conditioners And Stabilizers (/Split, 1.5 /2 Ton) Mounted In Different Location In Office Premises, Control Room And All Road/Rly. Wb Under Chp Cpp/Ppr For The Period Of 01 Year.
Organisation Central Coalfields Limited | Public Sector Undertakings
Tender Id 2025_CCL_328684_1
Reference
Number
PE/Elec/CHP/PPR/e-NIT/24-25/35
Tender Fee 0
EMD 3000
Tender Value -
Place OFFICE OF PO CHP-CPP, Piparwar Area, CCL
Link
View Original Tender Notice

https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=340688

Start Date February 11, 2025 22:30
End Date
Expired 21/02/2025

Expired 601 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
1.5 ton split air conditioners with stabilizers,2.0 ton split air conditioners with stabilizers

1.5 ton split air conditioners with stabilizers,2.0 ton split air conditioners with stabilizers

Read more
Cleaning of blocked drain and pot holes filling in different location of chp cpp under chp cpp piparwar area.

Cleaning of blocked drain and pot holes filling in different location of chp cpp under chp cpp piparwar area.

Read more
Repair and replacement of the damaged cable tray along with cover to ensure protection of the cables from damages, equipped for conveyor belt no. 1019 and 1018 under chp-cpp, ppr.

Repair and replacement of the damaged cable tray along with cover to ensure protection of the cables from damages, equipped for conveyor belt no. 1019 and 1018 under chp-cpp, ppr.

Read more
Cleaning, testing and adjusting of 2500 nos. of ci test weight (20 kg each) for annual verification and stamping of 02 nos. of weighbridges- wb-i (50 t ) and wb-ii (50 t) capacity electronics type road weighbridge under chp-cpp, piparwar.

Cleaning, testing and adjusting of 2500 nos. of ci test weight (20 kg each) for annual verification and stamping of 02 nos. of weighbridges- wb-i (50 t ) and wb-ii (50 t) capacity electronics type road weighbridge under chp-cpp, piparwar.

Read more
Annual maintenance contract for 63nos of 1.5 ton split type air conditioners at uchc hospital pullaavenue in division-101and annual maintenance contract for 38nos 1.5 ton air conditioner at various location uphc dn-94 to 108 zone viii.

Annual maintenance contract for 63nos of 1.5 ton split type air conditioners at uchc hospital pullaavenue in division-101and annual maintenance contract for 38nos 1.5 ton air conditioner at various location uphc dn-94 to 108 zone viii.

Read more
Annual maintenance contract of 19 no,s air conditioners and stabilizers (window/split, 1.5 /2 ton) mounted in different location in office premises, control room and all road/rly. wb under chp-cpp/ppr for the period of 01 year.

Annual maintenance contract of 19 no,s air conditioners and stabilizers (window/split, 1.5 /2 ton) mounted in different location in office premises, control room and all road/rly. wb under chp-cpp/ppr for the period of 01 year.

Read more
Proper earthing arrangement of rehabilitation area transformer (08 nos.) installed at different location for safety of transformer under chp-cpp/ppr.

Proper earthing arrangement of rehabilitation area transformer (08 nos.) installed at different location for safety of transformer under chp-cpp/ppr.

Read more
Providing and fixing v belts in de watering screen under chp-cpp/ppr.

Providing and fixing v belts in de watering screen under chp-cpp/ppr.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise