Tender Details

About Tender

🏭 Procurement Opportunity: Boiler Non Pressure Parts Overhaul 🛠️ The West Bengal Power Development Corporation Limited (Wbpdcl) Is Seeking Bids For The Overhauling Of Non Pressure Parts Of The Boiler For Unit 3 At Bakreswar Thermal Power Project (Bktpp). 🚧 📅 Bid Submission Deadline: July 10, 2024, 3:00 Pm The Scope Includes The Overhauling Of Recuperative Air Pre Heater, Coal Burners, Wind Box, Sadc, And Burner Tilt Components. Interested Bidders Must Submit An Earnest Money Deposit (Emd) Of Inr 825,000. Keywords: Boiler Overhaul, Non Pressure Parts, Recuperative Air Pre Heater, Coal Burners, Wind Box, Sadc, Burner Tilt, Wbpdcl, Bakreswar Thermal Power Project, Tender, State Govt. And Ut
Particulars Details
Title
Overhauling Of Boiler Non Pressure Parts (Recuperative Air Pre Heater, Coal Burners, Wind Box, Sadc, Burner Tilt) Of Unit 3, Bktpp
Description
Overhauling Of Boiler Non Pressure Parts (Recuperative Air Pre Heater, Coal Burners, Wind Box, Sadc, Burner Tilt) Of Unit 3, Bktpp
Organisation THE WEST BENGAL POWER DEVELOPMENT CORPORATION LTD. | State Govt. and UT
Tender Id 2024_WBPDC_688885_1
Reference
Number
WBPDCL/BKTPP/NIT/E3090/24-25
Tender Fee 0
EMD 82500
Tender Value -
Place BAKRESWAR THERMAL POWER PROJECT
Link
View Original Tender Notice

https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1501032

Start Date June 15, 2024 16:30
End Date
Expired 10/07/2024

Expired 827 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Procurement of i to p converters for sadc and burner tilt applications at stpp, jaipur, mancherial, telangana

Procurement of i to p converters for sadc and burner tilt applications at stpp, jaipur, mancherial, telangana

Read more
Ttps es circle instn ii overhauling of 48 nos sadc cylinder positioners and air lock relays 78 nos of instruments pertaining to sadc heavy oil prds and soot blower systems 4 nos burner tilt cylinders 14 nos of instruments pertaining to burner tilt

Ttps es circle instn ii overhauling of 48 nos sadc cylinder positioners and air lock relays 78 nos of instruments pertaining to sadc heavy oil prds and soot blower systems 4 nos burner tilt cylinders 14 nos of instruments pertaining to burner tilt

Read more
Ttps mechiibmunit iiioverhauling of wind box and sadc in boiler during the year 2026 2027

Ttps mechiibmunit iiioverhauling of wind box and sadc in boiler during the year 2026 2027

Read more
Supply of i to p converters for sadc and burner tilt pertaining to i and c div/stage-i and ii /btps

Supply of i to p converters for sadc and burner tilt pertaining to i and c div/stage-i and ii /btps

Read more
Ttps es circle instn ii unit v overhauling of 48 nos sadc cylinder positioners and air lock relays 80 nos of instruments pertaining to sadc heavy oil foph block valves prds os 35 and soot blower systems 4 nos burner tilt cylinders 16 nos of instru

Ttps es circle instn ii unit v overhauling of 48 nos sadc cylinder positioners and air lock relays 80 nos of instruments pertaining to sadc heavy oil foph block valves prds os 35 and soot blower systems 4 nos burner tilt cylinders 16 nos of instru

Read more
Assistance in taking over leftover manpower, t and p, consumables and transportation etc. for the work of routine, preventive and breakdown maintenance jobs (mechanical works) of pressure parts, wind box and burners, air pre-heaters, scaphs, esps,

Aux. prds, ducts, dampers and gates, coal pipes, soot blowers, safety valves, hp/lp piping and manual valves, fuel firing system (including fuel oil pump house) etc. of boilers of 2x210 mw and 2x250 mw bhel make units of ghtp, lehra mohabat.

Read more
Overhauling of boiler non-pressure parts (recuperative air pre-heater, coal burners, wind box, sadc, burner tilt) of unit-3, bktpp

Overhauling of boiler non-pressure parts (recuperative air pre-heater, coal burners, wind box, sadc, burner tilt) of unit-3, bktpp

Read more
Non pressure parts o/h of recuperative aph, coal burners, wind box, sadc, burner tilt of u1and 2,bktpp

Non pressure parts o/h of recuperative aph, coal burners, wind box, sadc, burner tilt of u1 2,bktpp

Read more
Overhauling of non-press parts (recuperative air pre-heater, coal burners, wind box, sadc, burner tilt) of u-2 and u-1, bktpp during respective unit overhauling

Overhauling of non-press parts (recuperative air pre-heater, coal burners, wind box, sadc, burner tilt) of u-2 and u-1, bktpp during respective unit overhauling

Read more
Overhauling of non-press parts (recuperative air pre-heater, coal burners, wind box, sadc, burner tilt) of u-2 and u-1, bktpp during respective unit overhauling

Overhauling of non-press parts (recuperative air pre-heater, coal burners, wind box, sadc, burner tilt) of u-2 and u-1, bktpp during respective unit overhauling

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise