Tender Details
Particulars | Details |
---|---|
Title |
Complete Replacement Of Steel Flooring Of Upper And Lower Floors Of Transfer House 9 Which Includes Replacement Of Ms Chequered Plates, Bracings, Supportings I.E. Supply, Fabrication, Installation, Commissioning Etc At New Chp, Secl, Dep.
|
Description |
Complete Replacement Of Steel Flooring Of Upper And Lower Floors Of Transfer House 9 Which Includes Replacement Of Ms Chequered Plates, Bracings, Supportings I.E. Supply, Fabrication, Installation, Commissioning Etc At New Chp, Secl, Dep.
|
Organisation | South Eastern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_SECL_328443_1 |
Reference Number |
SECL/GM/DA/SO(EnM)/ e-tender/24-25/80 dtd-08/02/25 |
Tender Fee | 0 |
EMD | 1.83 Lakh |
Tender Value | |
Place | Dipka Expansion Project, Dipka Area |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=340452 |
Start Date | February 11, 2025 15:30 |
End Date |
04/03/2025 ( Expired 47 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Supply, installation, testing and commissioning etc. consolidated of new 13 passengers lift at administrative building s.r.t.m. university, nanded. (ms) (replacement with old existing lift.)
Supply, installation, testing and commissioning etc. consolidated of new 13 passengers lift at administrative building s.r.t.m. university, nanded. (ms) (replacement with old existing lift.)
Read moreReconditioning and strengthening of transfer house steel floors and conveyors walkways with replacement of ms chequered plates/deck plates, bracings i.e. supply, fabrication, installation, commissioning etc at silo section of dipka expansion project.
Reconditioning and strengthening of transfer house steel floors and conveyors walkways with replacement of ms chequered plates/deck plates, bracings i.e. supply, fabrication, installation, commissioning etc at silo section of dipka expansion project.
Read moreStrengthening of discharge head alongwith complete replacement of discharge chute assembly i.e. supply, fabrication, erection, installation, commissioning etc of b-12/13/18/19 conveyors and vibros at silo section of dipka expansion project.
Strengthening of discharge head alongwith complete replacement of discharge chute assembly i.e. supply, fabrication, erection, installation, commissioning etc of b-12/13/18/19 conveyors and vibros at silo section of dipka expansion project.
Read moreComplete replacement of steel flooring of upper and lower floors of transfer house-9 which includes replacement of ms chequered plates, bracings, supportings i.e. supply, fabrication, installation, commissioning etc at new chp, secl, dep.
Complete replacement of steel flooring of upper and lower floors of transfer house-9 which includes replacement of ms chequered plates, bracings, supportings i.e. supply, fabrication, installation, commissioning etc at new chp, secl, dep.
Read morePlanning, design, engineering, construction, fabrication, erection, supply, installation, testing, trial run and commissioning of chp consisting of rcc silo ..... at rampur batura ocp (4.0mtpa) of sohagpur area, with dlp period of 05 years.
Planning, design, engineering, construction, fabrication, erection, supply, installation, testing, trial run and commissioning of chp consisting of rcc silo ..... at rampur batura ocp (4.0mtpa) of sohagpur area, with dlp period of 05 years.
Read moreStrengthening of structure (discharge head) alongwith complete replacement of discharge chute assembly i.e. supply, fabrication, erection, installation, commissioning etc at q1 and r1 conveyors of new chp, dipka expansion project.
Strengthening of structure (discharge head) alongwith complete replacement of discharge chute assembly i.e. supply, fabrication, erection, installation, commissioning etc at q1 and r1 conveyors of new chp, dipka expansion project.
Read moreof your Industry type