Tender Details
Particulars | Details |
---|---|
Title |
Reconditioning And Strengthening Of Transfer House Steel Floors And Conveyors Walkways With Replacement Of Ms Chequered Plates/Deck Plates, Bracings I.E. Supply, Fabrication, Installation, Commissioning Etc At Silo Section Of Dipka Expansion Project.
|
Description |
Reconditioning And Strengthening Of Transfer House Steel Floors And Conveyors Walkways With Replacement Of Ms Chequered Plates/Deck Plates, Bracings I.E. Supply, Fabrication, Installation, Commissioning Etc At Silo Section Of Dipka Expansion Project.
|
Organisation | South Eastern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_SECL_331546_1 |
Reference Number |
SECL/GM/DA/SO(EnM)/ e-tender/24-25/104 dtd-06/03/25 |
Tender Fee | 0 |
EMD | 1.6 Lakh |
Tender Value | |
Place | Dipka Expansion Project, Dipka Area |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=343693 |
Start Date | March 08, 2025 15:30 |
End Date |
24/03/2025 ( Expired 27 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Fencing of high risk openings and strengthening of railings along the walkway of different conveyors of silo section by suitably welded wire mesh guard panels and gi pipes at dipka expansion project.
Fencing of high risk openings and strengthening of railings along the walkway of different conveyors of silo section by suitably welded wire mesh guard panels and gi pipes at dipka expansion project.
Read moreReplacement, repairing of damaged intermediate frame and deck plates, installation of idler frame with rollers fabrication and erection of same at unit no. 1401 belt conveyor at loading section at madhuban coal washery under block-ii area, bccl .
Replacement, repairing of damaged intermediate frame and deck plates, installation of idler frame with rollers fabrication and erection of same at unit no. 1401 belt conveyor at loading section at madhuban coal washery under block-ii area, bccl .
Read moreReconditioning and strengthening of transfer house steel floors and conveyors walkways with replacement of ms chequered plates/deck plates, bracings i.e. supply, fabrication, installation, commissioning etc at silo section of dipka expansion project.
Reconditioning and strengthening of transfer house steel floors and conveyors walkways with replacement of ms chequered plates/deck plates, bracings i.e. supply, fabrication, installation, commissioning etc at silo section of dipka expansion project.
Read moreStrengthening of discharge head alongwith complete replacement of discharge chute assembly i.e. supply, fabrication, erection, installation, commissioning etc of b-12/13/18/19 conveyors and vibros at silo section of dipka expansion project.
Strengthening of discharge head alongwith complete replacement of discharge chute assembly i.e. supply, fabrication, erection, installation, commissioning etc of b-12/13/18/19 conveyors and vibros at silo section of dipka expansion project.
Read moreReplacement, repairing of worn out intermediate frame and deck plates, installation and erection of idler frame with rollers, rollers, fabrication and erection of same at 902-2 tail end side belt conveyor of ps-9 section at madhuban coal washe
Replacement, repairing of worn out intermediate frame and deck plates, installation and erection of idler frame with rollers, rollers, fabrication and erection of same at 902-2 tail end side belt conveyor of ps-9 section at madhuban coal washe
Read moreComplete replacement of steel flooring of upper and lower floors of transfer house-9 which includes replacement of ms chequered plates, bracings, supportings i.e. supply, fabrication, installation, commissioning etc at new chp, secl, dep.
Complete replacement of steel flooring of upper and lower floors of transfer house-9 which includes replacement of ms chequered plates, bracings, supportings i.e. supply, fabrication, installation, commissioning etc at new chp, secl, dep.
Read moreReplacement and repairing of damaged intermediate frame and deck plates, installation of idler frame with rollers fabrication and erection of same at unit no. 1301 belt conveyor from tail end to middle side at ps-9 section at madhuban coal washery un
Replacement and repairing of damaged intermediate frame and deck plates, installation of idler frame with rollers fabrication and erection of same at unit no. 1301 belt conveyor from tail end to middle side at ps-9 section at madhuban coal washery un
Read moreReplacement of worn out deck plates, fabrication and erection of new deck plates and dismantling, installation and erection of brackets with rollers of unit no. 1401 belt conveyor head drum side at loading section at madhuban coal washery under bloc
Replacement of worn out deck plates, fabrication and erection of new deck plates and dismantling, installation and erection of brackets with rollers of unit no. 1401 belt conveyor head drum side at loading section at madhuban coal washery under bloc
Read moreReplacement of worn out intermediate frame and deck plates, installation and erection of idler frame with roller, fabrication and erection of same of unit no. 301 tail end side belt conveyor of rom section at madhuban coal washery under block-ii area
Replacement of worn out intermediate frame and deck plates, installation and erection of idler frame with roller, fabrication and erection of same of unit no. 301 tail end side belt conveyor of rom section at madhuban coal washery under block-ii area
Read moreReplacement , repairing of damaged intermediate frame and deck plates, installation of idler frame with rollers fabrication and erection and erection of same unit 1402 belt conveyor in loading section of madhuban coal washery under block-ii ar
Replacement , repairing of damaged intermediate frame and deck plates, installation of idler frame with rollers fabrication and erection and erection of same unit 1402 belt conveyor in loading section of madhuban coal washery under block-ii ar
Read moreof your Industry type