Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Reconditioning And Strengthening Of Transfer House Steel Floors And Conveyors Walkways With Replacement Of Ms Chequered Plates/Deck Plates, Bracings I.E. Supply, Fabrication, Installation, Commissioning Etc At Silo Section Of Dipka Expansion Project.
|
| Description |
Reconditioning And Strengthening Of Transfer House Steel Floors And Conveyors Walkways With Replacement Of Ms Chequered Plates/Deck Plates, Bracings I.E. Supply, Fabrication, Installation, Commissioning Etc At Silo Section Of Dipka Expansion Project.
|
| Organisation | South Eastern Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2025_SECL_331546_1 |
|
Reference Number |
SECL/GM/DA/SO(EnM)/ e-tender/24-25/104 dtd-06/03/25 |
| Tender Fee | 0 |
| EMD | 1.6 Lakh |
| Tender Value | - |
| Place | Dipka Expansion Project, Dipka Area |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=343693 |
| Start Date | March 08, 2025 15:30 |
| End Date |
Expired
24/03/2025
Expired 566 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Replacement of old damaged chequered plate, deck plate, deck sheet, mother plate of and structure steel of different conveyors, chutes
Replacement of old damaged chequered plate, deck plate, deck sheet, mother plate of and structure steel of different conveyors, chutes
Read moreRepairing of bottom rollers for 1600mm belt conveyors of new chp and silo section at dipka expansion project.
Repairing of bottom rollers for 1600mm belt conveyors of new chp and silo section at dipka expansion project.
Read moreFabrication of top and bottom rollers for 1600mm belt conveyors of new chp and silo at dipka expansion project.
Fabrication of top and bottom rollers for 1600mm belt conveyors of new chp and silo at dipka expansion project.
Read moreComplete replacement of steel flooring of upper and lower floors of transfer house-9 which includes replacement of ms chequered plates, bracings, supportings i.e. supply, fabrication, installation, commissioning etc at new chp, secl, dep.
Complete replacement of steel flooring of upper and lower floors of transfer house-9 which includes replacement of ms chequered plates, bracings, supportings i.e. supply, fabrication, installation, commissioning etc at new chp, secl, dep.
Read moreRepairing, replacement and strengthening of damaged deck plates and its support structure including crisscross bracings beneath the conveyor at unit 403-a belt conveyor at moonidih coal washery.
Repairing, replacement and strengthening of damaged deck plates and its support structure including crisscross bracings beneath the conveyor at unit 403-a belt conveyor at moonidih coal washery.
Read moreDismantling, fabrication, erection and alignment of deck plates belt structures, repairing of roller frames related to belt conveyors under loading section of rajrappa washery project.
Dismantling, fabrication, erection and alignment of deck plates belt structures, repairing of roller frames related to belt conveyors under loading section of rajrappa washery project.
Read moreFencing of high risk openings and strengthening of railings along the walkway of different conveyors of silo section by suitably welded wire mesh guard panels and gi pipes at dipka expansion project.
Fencing of high risk openings and strengthening of railings along the walkway of different conveyors of silo section by suitably welded wire mesh guard panels and gi pipes at dipka expansion project.
Read moreBalance structural works of goods elevator (boiler rhs) comprising of installation of balance/missing members, welding/alignment/torque tightening of members/bracings, installation of car guide structure, door posts, chequered plates at entrance door
Balance structural works of goods elevator (boiler rhs) comprising of installation of balance/missing members, welding/alignment/torque tightening of members/bracings, installation of car guide structure, door posts, chequered plates at entrance door
Read moreStrengthening of discharge head alongwith complete replacement of discharge chute assembly i.e. supply, fabrication, erection, installation, commissioning etc of b-12/13/18/19 conveyors and vibros at silo section of dipka expansion project.
Strengthening of discharge head alongwith complete replacement of discharge chute assembly i.e. supply, fabrication, erection, installation, commissioning etc of b-12/13/18/19 conveyors and vibros at silo section of dipka expansion project.
Read moreof your Industry type