Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
๐๏ธ Kwa Revenue Arwss To Kuttampuzha And Vadattupara Annual Maintenance 2023 24 ๐ ๏ธ The Kerala Water Authority (Kwa) Invites Bids From Experienced Contractors For The Annual Maintenance And Repairs Of Pipelines And Taps Within The Kuttampuzha Panchayath For The Year 2023 24. ๐ ๐ Bid Submission Deadline: May 16, 2024, 3:00 Pm ๐ธ Tender Fee: Inr 1480 ๐ธ Earnest Money Deposit (Emd): Inr 16737 The Project Scope Includes Comprehensive Pipeline Work To Ensure The Delivery Of Clean And Potable Water To The Residents Of Kuttampuzha Panchayath. Interested Bidders Must Submit Detailed Proposals, Including Technical Specifications, Pricing, And Timelines For Project Completion. Keywords: Kwa, Annual Maintenance, Kuttampuzha Panchayath, Pipeline Repairs, Water Authority, Government Tender, Kerala, State Govt. And Ut, Tender, Emd| Particulars | Details |
|---|---|
| Title |
Annual Maintenance 2023 24 Kuttampuzha Panchayath
|
| Description |
Kwa Revenue Arwss To Kuttampuzha And Vadattupara Annual Maintenance 2023 24 Repairs Of Pipelines And Taps In Kuttampuzha Panchayath For The Year 2023 24 Pipeline Work
|
| Organisation | Kerala Water Authority | State Govt. and UT |
| Tender Id | 2024_KWA_665646_1 |
|
Reference Number |
130/2023-24/EE/PHDN/MVPA |
| Tender Fee | 1480 |
| EMD | 16737 |
| Tender Value | - |
| Place | Kuttampuzha Panchayath |
| Link |
View Original Tender Notice
https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1034108 |
| Start Date | March 05, 2024 22:30 |
| End Date |
Expired
05/06/2024
Expired 842 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Tggenco-btps-stage-ii-unit.no.4-annual overhaul of tg set during the scheduled unit overhaul for the fy2026-27.
Tggenco-btps-stage-ii-unit.no.4-annual overhaul of tg set during the scheduled unit overhaul for the fy2026-27.
Read moreDevelopment, operation and maintenance of ropeway and glass bridge skywalk at bhadrakali lake on dbfot mode for a period of 30 years
Development, operation and maintenance of ropeway and glass bridge skywalk at bhadrakali lake on dbfot mode for a period of 30 years
Read moreStmc for maintenance of stretch from km 289.500 to km 299.000 on kota darah section of nh-52 in the state of rajasthan.
Stmc for maintenance of stretch from km 289.500 to km 299.000 on kota darah section of nh-52 in the state of rajasthan.
Read moreOperation and maintenance of (33/11kv and 11kv )substations with distribution transformer (at various pumping stations) under narsapur segment, medak division for fy 2026-27, (for the period from 01.10.2026 to 31.03.2027)
Operation and maintenance of (33/11kv and 11kv )substations with distribution transformer (at various pumping stations) under narsapur segment, medak division for fy 2026-27, (for the period from 01.10.2026 to 31.03.2027)
Read moreOperation and maintenance of (33/11kv and 11kv ) substations with distribution transformer (at various pumping stations) under medak segment (08), medak division for fy 2026-27, (for the period from 01.10.2026 to 31.03.2027)
Operation and maintenance of (33/11kv and 11kv ) substations with distribution transformer (at various pumping stations) under medak segment (08), medak division for fy 2026-27, (for the period from 01.10.2026 to 31.03.2027)
Read moreProviding 65 nos. private security guards and 1 no. private security supervisor on outsourcing at s and pc department, rg2 area for a period of 24 months under unit rate system.
Providing 65 nos. private security guards and 1 no. private security supervisor on outsourcing at s and pc department, rg2 area for a period of 24 months under unit rate system.
Read moreRblisp liftii operation and maintenance of rblis lift-ii stage-i pumping station at thirumalayapally (v), madanapur (m) and stage-ii pumping station at kothakota (v,m), wanaparthy (dist) for the year 2026-27 (from 01.10.2026 to 30.09.2027)
Rblisp liftii operation and maintenance of rblis lift-ii stage-i pumping station at thirumalayapally (v), madanapur (m) and stage-ii pumping station at kothakota (v,m), wanaparthy (dist) for the year 2026-27 (from 01.10.2026 to 30.09.2027)
Read moreRequest for proposal for empanelment and rate contract of agencies for software application, mobile apps., dashboards and ai/ml solutions development, implementation and maintenance under 3 categories: - 1: start-ups registered in bihar 2: local firms registered in bihar 3: national level it companies
Request for proposal for empanelment and rate contract of agencies for software application, mobile apps., dashboards and ai/ml solutions development, implementation and maintenance under 3 categories: - 1: start-ups registered in bihar 2: local firms registered in bihar 3: national level it companies
Read moreHiring of 1 no. of hydraulically operated aerial tower wagon for repairs and maintenance works on electrical lighting poles and oht lines with 12 hours availabilty per day and 1000 kms run per month at section-iv of pkoc,manuguru area for a period of 4 years.-reg.
Hiring of 1 no. of hydraulically operated aerial tower wagon for repairs and maintenance works on electrical lighting poles and oht lines with 12 hours availabilty per day and 1000 kms run per month at section-iv of pkoc,manuguru area for a period of 4 years.-reg.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreof your Industry type