Tender Details
Particulars | Details |
---|---|
Title |
Mtps I Tm Ii Unit I Complete Inspection And Reconditioning Of Axial Piston Pump Of Hp Lp Bypass System Oil Supply Unit
|
Description |
Mtps I Tm Ii Unit I Complete Inspection And Reconditioning Of Axial Piston Pump Of Hp Lp Bypass System Oil Supply Unit
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2025_EB_525474_1 |
Reference Number |
CE / MTPS-I / SE / M-I / TM /OT. 299 / 2024-25 |
Tender Fee | 0 |
EMD | 1100 |
Tender Value | |
Place | Mettur Thermal Power Station-I / Mettur Dam |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=625611 |
Start Date | February 17, 2025 19:00 |
End Date |
03/03/2025 ( Expired 49 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Design manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.
Design manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.
Read moreSupply of wcl security, category ii, listed and listed i for watch and ward services under oil operational area under oil pipeline services in the state of assam for a period of 04 years from 01.07.2025 to 30.06.2029.
Supply of wcl security, category ii, listed and listed i for watch and ward services under oil operational area under oil pipeline services in the state of assam for a period of 04 years from 01.07.2025 to 30.06.2029.
Read moreWork of hammering and poking of coal bunker in all three shift during rainy season in unit 1,2,3 and 4 of ph-i n ph-ii at sstpp, mppgcl, dongalia, dist. khandwa
Work of hammering and poking of coal bunker in all three shift during rainy season in unit 1,2,3 and 4 of ph-i n ph-ii at sstpp, mppgcl, dongalia, dist. khandwa
Read moreSupply of spares for olaer make accumulators of lp bypass system
Supply of spares for olaer make accumulators of lp bypass system
Read moreProcurement of complete lp turbine rotor assembly with turbine blades for 2x600mw at unit no. 1 and 2 at sstpp, mppgcl, dongalia
Procurement of complete lp turbine rotor assembly with turbine blades for 2x600mw at unit no. 1 and 2 at sstpp, mppgcl, dongalia
Read moreSupply, installation, integration, testing and commissioning of complete and fully integrated functional full dome hybrid 2d immersive planetarium projection system at regional science centre and planetarium, kozhikode (calicut)
Supply, installation, integration, testing and commissioning of complete and fully integrated functional full dome hybrid 2d immersive planetarium projection system at regional science centre and planetarium, kozhikode (calicut) as per the nit
Read moreSinking of (300x200x150) mtr and 150x150x150 mtr deapth tw ,construction of pump house and construction of toilet block at ph-ii,boundrary wall repairing ,laying distribution system and interconnection of pwss with detials route sourvey
Sinking of (300x200x150) mtr and 150x150x150 mtr deapth tw ,construction of pump house and construction of toilet block at ph-ii,boundrary wall repairing ,laying distribution system and interconnection of pwss with detials route sourvey
Read moreSrcc/bnr/pt/010/tnso/2025-26 construction of new fire pump house including pile foundations (offshore) and allied works for re-vamping of fire fighting facilities for oil docks bharati dock-i and bharati dock-iii inside chennai port authority
Srcc/bnr/pt/010/tnso/2025-26 construction of new fire pump house including pile foundations (offshore) and allied works for re-vamping of fire fighting facilities for oil docks bharati dock-i and bharati dock-iii inside chennai port authority
Read moreSupply, installation, integration, testing and commissioning of the complete and fully integrated functional fulldome digital 2d and active 3d immersive projection system at science city, guwahati strictly as per the tender document
Supply, installation, integration, testing and commissioning of the complete and fully integrated functional fulldome digital 2d and active 3d immersive projection system at science city, guwahati strictly as per the tender document
Read moreSupply,installation and commissioning of pump assembly
For complete deion and other details, please refer to tender
Read moreof your Industry type