Tender Details
Particulars | Details |
---|---|
Title |
Partial Mechanical Repairing Of 2000 Gpm Pump Motor Damaged Caused By Miscreant At Night Shift Installed At Main Sump Of Tapin Open Cast Project Hazaribagh Area
|
Description |
Partial Mechanical Repairing Of 2000 Gpm Pump Motor Damaged Caused By Miscreant At Night Shift Installed At Main Sump Of Tapin Open Cast Project Hazaribagh Area
|
Organisation | Central Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_CCL_322060_1 |
Reference Number |
PE(EnM)/TNOCP/Tender/24-25/34 |
Tender Fee | 0 |
EMD | 3500 |
Tender Value | |
Place | Tapin North OCP |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=333835 |
Start Date | November 26, 2024 20:30 |
End Date |
06/12/2024 ( Expired 158 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Complete repairing and rewinding of 500 kva, 3.3kv/440v transformer, 3 phase, make marsons calcutta, sl. no. 8675 installed at main sump under kdh project, nk area
Complete repairing and rewinding of 500 kva, 3.3kv/440v transformer, 3 phase, make marsons calcutta, sl. no. 8675 installed at main sump under kdh project, nk area
Read moreFabrication of 02(two) nos additional base frame, motor pump installation on fabricated base frame along with supplying and fixing all required accessories at tapin open cast project hazaribagh area.
Fabrication of 02(two) nos additional base frame, motor pump installation on fabricated base frame along with supplying and fixing all required accessories at tapin open cast project hazaribagh area.
Read moreA)mechanical repairing of 2000 gpm , 150 mtr head pump make grw sl no
A)mechanical repairing of 2000 gpm , 150 mtr head pump make grw sl no 
 hs2525 along with trial and testing at sump under sayald project.
 b)mechanical repairing of 350 kw motor 3.3 kv three phase induction 
Read moreRepairing and reconditioning of 1000 gpm pump, make mnp,3chr installed at karma project under kuju area.
Repairing and reconditioning of 1000 gpm pump, make mnp,3chr installed at karma project under kuju area.
Read moreComplete fabrication of one no. (01) double-stack pontoon with a total of 80 drums (48 drums on top of the 32 drums at the bottom) for 2000 gpm motor installation at the new eastern side sump of jocp in the hzb area.
Complete fabrication of one no. (01) double-stack pontoon with a total of 80 drums (48 drums on top of the 32 drums at the bottom) for 2000 gpm motor installation at the new eastern side sump of jocp in the hzb area.
Read more(a). repairing of 2000gpm, 150 mtrs. head, make-flowmore model horizontal, sl.no- 17042951 installed at gvp phase-ii ocp (b). repairing of rkb 250, 200 mtrs. head 2000 gpm, sl.no.-12972150004 make-kirlosker pump of gvp phase-ii ocp, (c). repairing wo
(a). repairing of 2000gpm, 150 mtrs. head, make-flowmore model horizontal, sl.no- 17042951 installed at gvp phase-ii ocp (b). repairing of rkb 250, 200 mtrs. head 2000 gpm, sl.no.-12972150004 make-kirlosker pump of gvp phase-ii ocp, (c). repairing wo
Read moreComplete repairing/rewinding of 02 nos 180 kw of 3.3kv induction motor sl. no. f330168/1 and 125 kw of 3.3kv induction motor sl. no. f330586/5 installed at jharkhand open cast project under hazaribagh area
Complete repairing/rewinding of 02 nos 180 kw of 3.3kv induction motor sl. no. f330168/1 and 125 kw of 3.3kv induction motor sl. no. f330586/5 installed at jharkhand open cast project under hazaribagh area
Read moreMaintenance /repairing /dismantling / laying of 6 inch, 8 inch and 10 inch dia 3 ranges pipe line installed at mine for dewatering purpose for monsoon preparation at tapin north open cast project
Maintenance/ repairing /dismantling / laying of 6 inch, 8 inch and 10 inch dia 3 ranges pipe line installed at mine for dewatering purpose for monsoon preparation at tapin north open cast project under hazaribagh area
Read moreRepairing, maintenance and complete overhauling with spares of one no 2000 gpm 150 mtr head 2 stage flowmore make centrifugal pump sl no-17042951 at peocp,hazaribagh area.
Repairing, maintenance and complete overhauling with spares of one no 2000 gpm 150 mtr head 2 stage flowmore make centrifugal pump sl no-17042951 at peocp,hazaribagh area.
Read moreComplete repairing and overhauling of 150m head 2000 gpm pump sl. no. 07/100733 make maxflow installed at mines of rajhara ocp under rajhara area
Complete repairing and overhauling of 150m head 2000 gpm pump sl. no. 07/100733 make maxflow installed at mines of rajhara ocp under rajhara area
Read moreof your Industry type