Tender Details

Particulars Details
Title
Partial Mechanical Repairing Of 2000 Gpm Pump Motor Damaged Caused By Miscreant At Night Shift Installed At Main Sump Of Tapin Open Cast Project Hazaribagh Area
Description
Partial Mechanical Repairing Of 2000 Gpm Pump Motor Damaged Caused By Miscreant At Night Shift Installed At Main Sump Of Tapin Open Cast Project Hazaribagh Area
Organisation Central Coalfields Limited | Public Sector Undertakings
Tender Id 2024_CCL_322060_1
Reference
Number
PE(EnM)/TNOCP/Tender/24-25/34
Tender Fee 0
EMD 3500
Tender Value
Place Tapin North OCP
Link https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=333835
Start Date November 26, 2024 20:30
End Date

06/12/2024 ( Expired 158 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Complete repairing and rewinding of 500 kva, 3.3kv/440v transformer, 3 phase, make marsons calcutta, sl. no. 8675 installed at main sump under kdh project, nk area

Complete repairing and rewinding of 500 kva, 3.3kv/440v transformer, 3 phase, make marsons calcutta, sl. no. 8675 installed at main sump under kdh project, nk area

Read more
Fabrication of 02(two) nos additional base frame, motor pump installation on fabricated base frame along with supplying and fixing all required accessories at tapin open cast project hazaribagh area.

Fabrication of 02(two) nos additional base frame, motor pump installation on fabricated base frame along with supplying and fixing all required accessories at tapin open cast project hazaribagh area.

Read more
A)mechanical repairing of 2000 gpm , 150 mtr head pump make grw sl no

A)mechanical repairing of 2000 gpm , 150 mtr head pump make grw sl no &#x0d hs2525 along with trial and testing at sump under sayald project.&#x0d b)mechanical repairing of 350 kw motor 3.3 kv three phase induction &#x0d

Read more
Repairing and reconditioning of 1000 gpm pump, make mnp,3chr installed at karma project under kuju area.

Repairing and reconditioning of 1000 gpm pump, make mnp,3chr installed at karma project under kuju area.

Read more
Complete fabrication of one no. (01) double-stack pontoon with a total of 80 drums (48 drums on top of the 32 drums at the bottom) for 2000 gpm motor installation at the new eastern side sump of jocp in the hzb area.

Complete fabrication of one no. (01) double-stack pontoon with a total of 80 drums (48 drums on top of the 32 drums at the bottom) for 2000 gpm motor installation at the new eastern side sump of jocp in the hzb area.

Read more
(a). repairing of 2000gpm, 150 mtrs. head, make-flowmore model horizontal, sl.no- 17042951 installed at gvp phase-ii ocp (b). repairing of rkb 250, 200 mtrs. head 2000 gpm, sl.no.-12972150004 make-kirlosker pump of gvp phase-ii ocp, (c). repairing wo

(a). repairing of 2000gpm, 150 mtrs. head, make-flowmore model horizontal, sl.no- 17042951 installed at gvp phase-ii ocp (b). repairing of rkb 250, 200 mtrs. head 2000 gpm, sl.no.-12972150004 make-kirlosker pump of gvp phase-ii ocp, (c). repairing wo

Read more
Complete repairing/rewinding of 02 nos 180 kw of 3.3kv induction motor sl. no. f330168/1 and 125 kw of 3.3kv induction motor sl. no. f330586/5 installed at jharkhand open cast project under hazaribagh area

Complete repairing/rewinding of 02 nos 180 kw of 3.3kv induction motor sl. no. f330168/1 and 125 kw of 3.3kv induction motor sl. no. f330586/5 installed at jharkhand open cast project under hazaribagh area

Read more
Maintenance /repairing /dismantling / laying of 6 inch, 8 inch and 10 inch dia 3 ranges pipe line installed at mine for dewatering purpose for monsoon preparation at tapin north open cast project

Maintenance/ repairing /dismantling / laying of 6 inch, 8 inch and 10 inch dia 3 ranges pipe line installed at mine for dewatering purpose for monsoon preparation at tapin north open cast project under hazaribagh area

Read more
Repairing, maintenance and complete overhauling with spares of one no 2000 gpm 150 mtr head 2 stage flowmore make centrifugal pump sl no-17042951 at peocp,hazaribagh area.

Repairing, maintenance and complete overhauling with spares of one no 2000 gpm 150 mtr head 2 stage flowmore make centrifugal pump sl no-17042951 at peocp,hazaribagh area.

Read more
Complete repairing and overhauling of 150m head 2000 gpm pump sl. no. 07/100733 make maxflow installed at mines of rajhara ocp under rajhara area

Complete repairing and overhauling of 150m head 2000 gpm pump sl. no. 07/100733 make maxflow installed at mines of rajhara ocp under rajhara area

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise