Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Toe Wall Along Ob Dump At Tapin South Open Cast Project, Hazaribagh Area
|
| Description |
Construction Of Toe Wall Along Ob Dump At Tapin South Open Cast Project, Hazaribagh Area
|
| Organisation | Coal India Limited (CIL) |
| Tender Id | 2023_CCL_291727_1 |
|
Reference Number |
GM(H)/SO(C)/NIT/2023-24/48 Dated 19-10-2023 |
| Tender Fee | - |
| EMD | 24900 |
| Tender Value | - |
| Place | OFFICE OF STAFF OFFICER, CIVIL, HAZARIBAGH AREA |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in |
| Start Date | October 20, 2023 15:30 |
| End Date |
Expired
30/10/2023
Expired 1080 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of approach road to tapin basantpur washery under hazaribagh area
Construction of approach road to tapin basantpur washery under hazaribagh area
Read moreConstruction of garland drain with siltation pond , catch drain and retaining wall from ob dump tetulmari to punjabi more along nagri jore under tetulmari colliery under sijua area
Construction of garland drain with siltation pond , catch drain and retaining wall from ob dump tetulmari to punjabi more along nagri jore under tetulmari colliery under sijua area
Read moreConcreting for rain water harvesting at khadki sports complex hockey ground along h. no. 469 ob and 470 ob ii call
Concreting for rain water harvesting at khadki sports complex hockey ground along h. no. 469 ob and 470 ob ii call
Read moreTender for balance works of design, engineering, supply, construction, erection, testing and commissioning of 22 mw (ac) ob dump based solar pv power plant along with 10 years plant o and m at sccl
Tender for balance works of design, engineering, supply, construction, erection, testing and commissioning of 22 mw (ac) ob dump based solar pv power plant along with 10 years plant o and m at sccl
Read morePublic address system for weighbridge and check-post under hazaribagh area along with 01year onsite warranty.
Public address system for weighbridge and check-post under hazaribagh area along with 01year onsite warranty.
Read moreRestoration of lis rattanpur paras by way of providing toe/retaining wall along with the local nallah (choi).
Restoration of lis rattanpur paras by way of providing toe/retaining wall along with the local nallah (choi).
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-handling of 1.807 lcm of loose top soil for permanent diversion of gundlavagu nallah with conventional equipment, and additional works viz., 4000 shovel hours, 3000 dozer hours and 1,80,000 rmt of drilling at ktk oc-iii project, bhupalpally area during a period of 36 months.
Read moreKutcha drain cutting from lalghutua dump south east portion through hill top sub-station upto inpit weigh bridge under rocp.
Kutcha drain cutting from lalghutua dump south east portion through hill top sub-station upto inpit weigh bridge under rocp.
Read moreSeal bar along with two no. keys and four m4 screws in assembled condition, moc: sg-cast iron confir
Seal bar along with two no. keys and four m4 screws in assembled condition, moc: sg-cast iron confir
Read moreConstruction of open multipurpose- skill development training centre attached to ramthakur seba mandir belonia south tripura
Construction of open multipurpose- skill development training centre attached to ramthakur seba mandir belonia south tripura
Read moreof your Industry type